2026 Pavement Patching Program

Closed State & local contract opportunity Posted

Solicitation number
26-00000-01-GM
State
Illinois
Responses due

Opportunity facts

Points of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Batavia, Illinois is requesting sealed bids for the Street Resurfacing and Sidewalk Replacement Program on 16th Avenue from the Rock Island border to 7th Street, with bids due June 3, 2026 at 2:00 p.m. at the Public Works Building, 200 N. Raddant Road. Contractors must comply with Illinois Prevailing Wage requirements and hold IDOT Certification of Eligibility for Hot-Mix Asphalt Mix.

The scope includes milling and resurfacing with 3 inches of Polymer Hot Mix Asphalt, concrete patching, sidewalk and curb removal and replacement, ADA ramp installations, utility adjustments, pavement markings, traffic control, and landscaping. The asphalt material requirement totals $1.5 million. Bidders must submit 5% bid security with their bids. Upon award, the contractor must provide 100% Performance Bond and 100% Labor and Material Payment Bond.

Bid prices must remain valid for a minimum of 75 days from the opening date. The City reserves the right to reject any or all bids, waive technicalities, award in its best interest, and defer award for up to forty-five days after opening. The City may require the apparent low bidder to submit evidence of financial capacity, equipment, and experience within seven days of bid opening.

The complete bid package is available electronically at no cost by emailing Tim Grimm, P.E., City Engineer, at tgrimm@bataviail.gov. Questions should be directed to Grimm at the same address.

Opportunity text

3 versions

Update #3 · Latest ·

Class D pavement patching of various types and resurfacing those patches and damaged asphalt around the Village of LaGrange Park, IL.

Update #2 ·

Street Resurfacing and Sidewalk Replacement Program for the City of Batavia, IL.

Update #1 ·

The project location is 16th Avenue from the Rock Island border to 7th Street. Work includes milling and resurfacing with 3" of Polymer Hot Mix Asphalt. Work also includes concrete patching, sidewalk replacements, ADA ramp installations, utility adjustments, pavement markings, traffic control, and landscaping.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity