Speegleville Bridge Over Middle Bosque Replacement

Closed State & local contract opportunity Posted

Solicitation number
RFB 2026-023
State
Texas
Responses due

Opportunity facts

Jurisdiction
NIGP codes
Show all 12

Opportunity details come from waco-texas.bonfirehub.com. Updated .

About this opportunity

The City of Waco and TxDOT are requesting sealed bids for the Speegleville Bridge Over the Middle Bosque Replacement project under RFB 2026-023, with bids due July 29, 2026 at 2:00 p.m. at the City of Waco's Operations Center, 1415 N. 4th Street, Waco, Texas.

The scope encompasses a 0.54-mile bridge and roadway reconstruction project on Speegleville Road from Maple Shade Road to north of Oak Road in Waco, McLennan County, Texas. Work includes approximately 2,200 linear feet of roadway reconstruction expanding to four lanes separated by a striped median; two new bridges crossing the Middle Bosque River, each 670 feet in length; approximately 1,500 linear feet of storm drainpipes and culverts; and pedestrian sidewalks on the east and west sides of the roadway.

A non-mandatory pre-bid meeting is scheduled for Wednesday, July 1, 2026 at 10:00 a.m. via Zoom video and dial-in. Questions should be directed to purchasing agent Paul Campos at pcampos@wacotx.gov or 254-750-8062. Additional project details are available at https://waco-texas.bonfirehub.com/portal.

Opportunity text

RFB 2026-023, Speegleville Bridge Over the Middle Bosque Replacement. Sealed Bids will be accepted at the City of Waco's Operations Center, 1415 N. 4th Street, Waco, TX until 2:00 P.M., Wednesday July 29, 2026. The dual effort of the City of Waco and TxDOT for the Speegleville Bridge Over the Middle Bosque Project is a 0.54-mile bridge and roadway reconstruction project of Speegleville Road from Maple Shade Road to north of Oak Road located in the City of Waco, McLennan County, Texas. The project consists of reconstructing approximately 2,200 LF of roadway and adding an additional northbound and southbound lanes, creating a four-lane roadway separated by a striped median. The bridge crossing consists of constructing two different bridges elevated over the Middle Bosque River, each 670 feet in length. In addition to roadway improvements, construction of approximately 1,500 LF of storm drainpipes and culverts, and construction of pedestrian sidewalk on the east and west sides of the roadway. For more detailed information, see this project page at https://waco-texas.bonfirehub.com/portal. A Non-mandatory Pre-Bid meeting is scheduled for Wednesday July 1, 2026, at 10:00 A. M. via Zoom Video and Dial In. For questions, please contact purchasing agent Paul Campos at pcampos@wacotx.gov or by phone at 254-750-8062.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity