SPECIFICATIONS FOR INSPECTIONS OF DAMAGED UTILITY LINES IN POST DISASTER ENVIRONMENT - Call for Bid 2025
Awarded State & local contract opportunity
- Solicitation number
- 2025-01
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- Points of contact
-
- Wesley Sims wsims@gladeselectric.com
- Jennifer Manning jmanning@gladeselectric.com
Updated .
About this opportunity
Glades Electric Cooperative (GEC) is seeking a Master Service Agreement (MSA) for Storm Damage Inspection services in preparation for the 2025 hurricane season through a competitive bid process. The procurement aims to establish a contract with a qualified vendor capable of deploying damage inspection teams consisting of a Damage Assessor, Damage Assessor Assistant, Area Field Manager, vehicles, and iPads to assess utility infrastructure damage post-disaster. Key requirements include personnel with a minimum of ten years distribution utility experience, specialized equipment like iOS-based iPads and 4-wheel drive pickup trucks, and the ability to conduct initial and secondary damage assessments of above-ground utility facilities such as substations, transmission lines, poles, transformers, and services. Evaluation criteria will be weighted 40% on firm and staff qualifications, 30% on past performance, and 30% on cost proposal. The bid solicitation was posted on June 4, 2025, with questions due by June 16, 2025, and final bids due by June 18, 2025. The Master Service Agreement will be effective until December 31, 2026, with an anticipated contract award date of July 10, 2025.
The procurement does not specify explicit set-aside designations or restrictions for disadvantaged enterprises. Contractors with an existing MSA storm contract with GEC are not required to submit a bid but may do so with updated rates. The contract will reimburse labor, transit, fuel, lodging, and materials, with a strict prohibition on cost-plus payment scenarios. The total contract base "Not to Exceed" amount is set at $100,000, though this may be amended in the event of a large-scale disaster. Contractors must be prepared to mobilize within 24 hours of approval and provide comprehensive damage assessment reports with GPS-coordinated photographs using NISC Appsuite software. The solicitation is conducted in compliance with FEMA's Procurement Guidance and aims to address contractor availability constraints experienced during the 2024 hurricane season. GEC reserves the right to reject any or all proposals and may award multiple contracts depending on the severity of potential disaster scenarios.
Opportunity text
2 versions
Update #2 · Latest ·
Objective: Due to the very active 2024 Hurricane season that Florida experienced which caused a constraint on contractor availability, GEC is seeking additional contracts ahead of the 2025 season. If GEC has an active MSA storm contract with your company, you do not have to submit a bid. However, if you would still like to submit a bid with updated rates then you are welcome to do so. GEC is seeking to enter into a Master Service Agreement with a Storm Damage Inspection provider which will allow the awarded bidder to perform Storm Damage Inspection tasks as requested by GEC as needed via a Request for Services. Bidder shall provide rates for these services for the duration of the Agreement. The Master Service Agreement shall be effective until December 31, 2025. The services which may be requested are more specifically described as: 1. Damage Inspection teams will consist of Damage Assessor, Damage Assessor Assistant, vehicle, and iPad. An Area Field Manager will be assigned to a deployment request of ten (10) or more teams. a. Equipment i. iPad - Each damage assessor MUST have an iPad capable of downloading the most up to date iOS operating system. iPad MUST have camera to take photographs. **Android devices are not compatible with our damage assessment software.** ii. Vehicle - Each damage assessment crew must have a pickup with 4 wheel drive. b. Personnel i. Area Field Manager - to be deployed per ten (10) Damage Assessment teams or as conditions warrant. Area Field Manager will have his/her own vehicle for assessment. GEC requires a minimum of ten (10) years distribution utility experience (line construction/maintenance/staking) for this role. Experience with mobile mapping software (NISC) is preferred. ii. Damage Assessor - person experienced in utility damage assessment with an iPad in the field. Assessor will have his/her own vehicle for assessment and iPad. GEC requires a minimum of ten (10) years distribution utility experience (line construction/maintenance/staking) for this role. Experience with mobile mapping software (NISC) is preferred. iii. Damage Assessor Assistant/Driver - person who performs driving operations for Damage Assessor and assists in note taking as well as other miscellaneous activities. Person may serve as an administrative assistant ensuring proper documentation of labor and expenses based on client's invoicing requirements. 2. Initial line inspection/evaluation of damaged above-ground facilities (substations, Transmission lines and pole, Distribution feeders, sub-laterals, broken poles, transformers, services, etc. as directed by GEC). 3. Second assessment/evaluation of damaged above-ground facilities (if needed - substations, feeders, sub-laterals, broken poles, transformers, services, etc. as directed by GEC). 4. Provide GEC with restoration progress and projection reports as requested. 5. Provide photographs with GPS coordinates of all damaged facilities utilizing NISC Appsuite. GEC will provide instructions and login information for NISC Appsuite. 6. Damage assessment process (paper maps, assessment software, procedures) must be reviewed by GEC for approval. 7. Any special tools or equipment (as directed by GEC) will be reimbursed. 8. Mobilization/Demobilization - GEC will reimburse fees based on the rates for labor and number of hours per day actually spent by the particular individual and equipment in transit, plus fuel, lodging, and material needed to complete the mob/demob. All rates, times, and extras (fuel, lodging, materials, etc.) must be coordinated with GEC for approval. No cost-plus payment scenarios will be approved. 9. Contractor will mobilize the Damage Assessment team within 24 hours of approval. Schedule: Work to start as soon as it is safe to begin, immediately after storm or event has passed, and work will end when all power is restored. Please provide itemized estimate for labor hours and truck equipment. All construction must meet RUS standards. Please note the not to exceed amount listed on "Attachment F Bid Form". May it be expressly understood that the amount payable for services performed during this contract period shall not exceed this amount unless otherwise agreed upon by both parties in writing and executed as an amendment to this agreement. The not to exceed amount has been calculated based upon a reasonable time of restoration in the event of a disaster and should be amended in the event of a large-scale disaster.
Update #1 ·
Objective: Due to the very active 2024 Hurricane season that Florida experienced which caused a constraint on contractor availability, GEC is seeking additional contracts ahead of the 2025 season. If GEC has an active MSA storm contract with your company, you do not have to submit a bid. However, if you would still like to submit a bid with updated rates then you are welcome to do so. GEC is seeking to enter into a Master Service Agreement with a Storm Damage Inspection provider which will allow the awarded bidder to perform Storm Damage Inspection tasks as requested by GEC as needed via a Request for Services. Bidder shall provide rates for these services for the duration of the Agreement. The Master Service Agreement shall be effective until December 31, 2026. The services which may be requested are more specifically described as: 1. Damage Inspection teams will consist of Damage Assessor, Damage Assessor Assistant, vehicle, and iPad. An Area Field Manager will be assigned to a deployment request of ten (10) or more teams. a. Equipment i. iPad - Each damage assessor MUST have an iPad capable of downloading the most up to date iOS operating system. iPad MUST have camera to take photographs. **Android devices are not compatible with our damage assessment software.** ii. Vehicle - Each damage assessment crew must have a pickup with 4 wheel drive. b. Personnel i. Area Field Manager - to be deployed per ten (10) Damage Assessment teams or as conditions warrant. Area Field Manager will have his/her own vehicle for assessment. GEC requires a minimum of ten (10) years distribution utility experience (line construction/maintenance/staking) for this role. Experience with mobile mapping software (NISC) is preferred. ii. Damage Assessor - person experienced in utility damage assessment with an iPad in the field. Assessor will have his/her own vehicle for assessment and iPad. GEC requires a minimum of ten (10) years distribution utility experience (line construction/maintenance/staking) for this role. Experience with mobile mapping software (NISC) is preferred. iii. Damage Assessor Assistant/Driver - person who performs driving operations for Damage Assessor and assists in note taking as well as other miscellaneous activities. Person may serve as an administrative assistant ensuring proper documentation of labor and expenses based on client's invoicing requirements. 2. Initial line inspection/evaluation of damaged above-ground facilities (substations, Transmission lines and pole, Distribution feeders, sub-laterals, broken poles, transformers, services, etc. as directed by GEC). 3. Second assessment/evaluation of damaged above-ground facilities (if needed - substations, feeders, sub-laterals, broken poles, transformers, services, etc. as directed by GEC). 4. Provide GEC with restoration progress and projection reports as requested. 5. Provide photographs with GPS coordinates of all damaged facilities utilizing NISC Appsuite. GEC will provide instructions and login information for NISC Appsuite. 6. Damage assessment process (paper maps, assessment software, procedures) must be reviewed by GEC for approval. 7. Any special tools or equipment (as directed by GEC) will be reimbursed. 8. Mobilization/Demobilization - GEC will reimburse fees based on the rates for labor and number of hours per day actually spent by the particular individual and equipment in transit, plus fuel, lodging, and material needed to complete the mob/demob. All rates, times, and extras (fuel, lodging, materials, etc.) must be coordinated with GEC for approval. No cost-plus payment scenarios will be approved. 9. Contractor will mobilize the Damage Assessment team within 24 hours of approval. Schedule: Work to start as soon as it is safe to begin, immediately after storm or event has passed, and work will end when all power is restored. Please provide itemized estimate for labor hours and truck equipment. All construction must meet RUS standards. Please note the not to exceed amount listed on "Attachment F Bid Form". May it be expressly understood that the amount payable for services performed during this contract period shall not exceed this amount unless otherwise agreed upon by both parties in writing and executed as an amendment to this agreement. The not to exceed amount has been calculated based upon a reasonable time of restoration in the event of a disaster and should be amended in the event of a large-scale disaster.