Inspections_of_Damaged_Lines_-_Rate_Sheet_Template.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
SPECIFICATIONS FOR INSPECTIONS OF DAMAGED UTILITY LINES IN POST DISASTER ENVIRONMENT - Call for Bid 2025
Solicitation number
2025-01
Issued by
Glades County, Florida

About this file

The file "Inspections_of_Damaged_Lines_-_Rate_Sheet_Template.xlsx" is a procurement document from Glades Electric Cooperative (GEC) in Florida, soliciting bids for a Master Service Agreement (MSA) for Storm Damage Inspection services in preparation for the 2025 hurricane season. The contract seeks a qualified vendor to deploy damage inspection teams consisting of a Damage Assessor, Damage Assessor Assistant, and an Area Field Manager, each equipped with a 4-wheel drive pickup truck and an iOS-compatible iPad. The bid was posted on June 4, 2025, with questions due by June 16, 2025, and final bids due by June 18, 2025. The MSA will be effective until December 31, 2026, with an anticipated contract award date of July 10, 2025, and requires contractors to mobilize within 24 hours of approval for comprehensive damage assessment of utility infrastructure.

The procurement has a base "Not to Exceed" amount of $100,000, with potential amendments for large-scale disasters. Evaluation criteria will be weighted 40% on firm and staff qualifications, 30% on past performance, and 30% on cost proposal. Contractors must have personnel with a minimum of ten years distribution utility experience and the ability to conduct initial and secondary damage assessments of above-ground utility facilities. The contract will reimburse labor, transit, fuel, lodging, and materials, with a strict prohibition on cost-plus payment scenarios. Contractors with an existing MSA storm contract with GEC are not required to submit a bid but may do so with updated rates. The solicitation is conducted in compliance with FEMA's Procurement Guidance and aims to address contractor availability constraints experienced during the 2024 hurricane season, with GEC reserving the right to reject any or all proposals and potentially award multiple contracts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025 Rates

Glades Electric Rate Sheet Template
Instructions: Please complete all items highlighted yellow. Items with an * are mandatory. Other items are optional.
Bid Name2025-01 - SPECIFICATIONS FOR INSPECTIONS OF DAMAGED UTILITY LINES IN POST DISASTER ENVIRONMENT
*Company Name:
*Corporate Address:
Bid ContactPlease list the individual responsible for answering questions regarding the bid.
*Person Name:
*Email:
*Phone #:
Contract ContactPlease list the individual responsible for signing the contract.
*Name:
*Email:
*Phone #:
2025 Rates
Instructions: Please enter the applicable rates for your company in the template below.
Labor Rates
Labor DescriptionSTOTDT
Area Field Manager/Storm Manager
*Team Lead/Supervisor
*Assessor/Inspector
*Driver/Assistant
Safety Specialist
Wire Down Lead
Wire Down
Additional Labor Rates: Please list any other offered equipment below. Insert add additional rows if needed.
Labor DescriptionSTOTDT
Equipment Rates
EquipmentRate per Hour
*Pickup 4x4
Pickup 4x2
UTV w/ Trailer

Additional Equipment Rates: Please list any other offered equipment below. Insert add additional rows if needed.

Equipment Type Rate

Yes/No
Is fuel included in the equipment rates?
Pricing Assumptions and Clarifications
Instructions: As needed, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays. NOTE: Lodging, meals, and fuel (if not included in above rates) must be pass-through costs with no markup in order to be FEMA compliant.

File details come from the government source that posted it. Updated .