Inspections_of_Damaged_Lines_-_Rate_Sheet_Template.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
SPECIFICATIONS FOR INSPECTIONS OF DAMAGED UTILITY LINES IN POST DISASTER ENVIRONMENT - Call for Bid 2025
Solicitation number
2025-01
Issued by
Glades County, Florida

About this file

The document is a rate sheet template and bid specification for Glades Electric Company (GEC) in Florida, seeking a Master Service Agreement for Storm Damage Inspection services in preparation for the 2025 hurricane season. The contract will be effective until December 31, 2026, with the primary objective of establishing a pre-approved contractor to perform comprehensive utility line damage assessments following natural disasters. The scope includes deploying damage inspection teams consisting of assessors, assistants, and managers, equipped with specific requirements such as 4x4 vehicles and iPads, to conduct initial and secondary evaluations of damaged above-ground utility facilities like substations, transmission lines, poles, and transformers.

The rate sheet template requires bidders to provide detailed labor and equipment rates, including standard, overtime, and double-time pricing for various roles such as Area Field Managers, Team Leads, Assessors, and Drivers. The contract emphasizes strict personnel qualifications, requiring a minimum of ten years of distribution utility experience for key roles. Contractors must be prepared to mobilize within 24 hours of approval, provide detailed damage assessment reports with GPS-coordinated photographs, and adhere to FEMA compliance standards. Reimbursement will be based on actual labor hours, transit time, and approved expenses like fuel and lodging, with no cost-plus payment scenarios permitted. The solicitation is specifically targeting additional contractor capacity following constraints experienced during the 2024 hurricane season.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025 Rates

Glades Electric Rate Sheet Template
Instructions: Please complete all items highlighted yellow. Items with an * are mandatory. Other items are optional.
Bid Name2025-01 - SPECIFICATIONS FOR INSPECTIONS OF DAMAGED UTILITY LINES IN POST DISASTER ENVIRONMENT
*Company Name:
*Corporate Address:
Bid ContactPlease list the individual responsible for answering questions regarding the bid.
*Person Name:
*Email:
*Phone #:
Contract ContactPlease list the individual responsible for signing the contract.
*Name:
*Email:
*Phone #:
2025 Rates
Instructions: Please enter the applicable rates for your company in the template below.
Labor Rates
Labor DescriptionSTOTDT
Area Field Manager/Storm Manager
*Team Lead/Supervisor
*Assessor/Inspector
*Driver/Assistant
Safety Specialist
Wire Down Lead
Wire Down
Additional Labor Rates: Please list any other offered equipment below. Insert add additional rows if needed.
Labor DescriptionSTOTDT
Equipment Rates
EquipmentRate per Hour
*Pickup 4x4
Pickup 4x2
UTV w/ Trailer

Additional Equipment Rates: Please list any other offered equipment below. Insert add additional rows if needed.

Equipment Type Rate

Yes/No
Is fuel included in the equipment rates?
Pricing Assumptions and Clarifications
Instructions: As needed, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays. NOTE: Lodging, meals, and fuel (if not included in above rates) must be pass-through costs with no markup in order to be FEMA compliant.