SLCo SLP102026 SPCC Renovation Bid Package #00 Preconstruction Assistance - Courtesy Notice
Open State & local contract opportunity Posted
- Solicitation number
- SLP102026 - Courtesy Notice
- State
- Utah
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
Salt Lake County is requesting proposals for pre-construction assistance trade partners for the Salt Palace Convention Center renovation under a competitive best-value selection process, with proposals due November 14, 2026. Hunt Jacobsen Joint Venture (HJJV), the CM/GC, is selecting partners for nine trades under Utah Procurement Code Part 7; an NDA is required before document release.
The scope encompasses pre-construction services across structural steel, curtain wall and glazed assemblies, vertical transportation (elevators and escalators), fire protection, plumbing, HVAC and building management systems, electrical and fire alarm, telecommunications/electronic safety and security, audio-visual systems, and concrete piles/deep foundations. Selected partners will collaborate with HJJV and the design team on constructability, coordination, BIM/VDC, schedule, procurement and labor planning, cost modeling, and management of a negotiated Fixed Limit of Construction Cost. The pre-construction phase is anticipated to run from December 2026 through September 2027 (design development through permitting). The project includes partial remodel and rebuild of the Salt Palace Convention Center at 100 S. West Temple, Salt Lake City, with coordination required for any work impacting the renovation or other areas affected by it, including coordination with Smith Entertainment Group's contractor.
Each trade package is submitted as two separate PDF volumes: Volume 1 is a technical proposal weighted at 60 points with no cost information. Abravanel Hall and UMOCA information are provided for reference only and are excluded from scope.
Opportunity text
Project Description (General): Salt Palace Convention Center & Entertainment District County Facilities 100 S. West Temple, Salt Lake City, Utah Owner: Salt Lake County CM/GC: Hunt Jacobsen Joint Venture ("HJJV") Pre-Construction Assistance for the Salt Palace Convention Center is requested for the following trades: - 05.10Structural Steel - 08.40 Curtain Wall & Glazed Assemblies - 14.00 Vertical Transportation (Elevators & Escalators) - 21.00 Fire Protection - 22.00 Plumbing - 23.00 HVAC & BMS - 26.00 Electrical & Fire Alarm - 27.20 Telecommunications / Electronic Safety & Security - 27.40 Audio-Visual Systems - 31.62 Concrete Piles / Deep Foundations The project includes partial remodel and rebuild of the Salt Palace Convention Center (SPCC), along with coordination with Smith Entertainment Group's contractor for any work that impacts the remodel, rebuild and/or other areas impacted by the SPCC, located in Salt Lake City, Utah. Project Description (Bid Package Specific): Please note that an NDA will be required prior to the release of documents. Hunt Jacobsen Joint Venture is selecting Pre-Construction Assistance trade partners for the Salt Palace Convention Center through a competitive best-value (Value Based Selection) process under Utah Procurement Code Part 7. Selected partners will work with HJJV and the design team during design development on constructability, coordination, BIM/VDC, schedule, procurement and labor planning, cost modeling, and management of a negotiated Fixed Limit of Construction Cost ("FLCC"). The Pre-Construction Assistance phase is anticipated to begin in December 2026 and run until Construction Documents are finalized and permitted (anticipated September 2027). Abravanel Hall and UMOCA information is provided for reference only and is not included in this scope. Each trade package is a stand-alone proposal submitted as two separate PDF volumes at the same deadline: Volume 1 - Technical Proposal (60 points; no cost information), covering project history, project team, schedule, and pre-construction and construction risk factors; and Volume 2 - Cost Proposal and FLCC (40 points), covering the Pre-Construction Assistance lump sum, Construction Management Fee, General Conditions + Supervision cost, and proposed FLCC with open-book estimate backup, along with labor rates and bonding/insurance/SDI information. Upon completion of design, the selected partner will provide a Fixed Lump Sum for the construction-phase work within the negotiated FLCC. Pre-Bid Meeting Date & Time: - Pre-Bid Meeting October 30, 2026 from 10:00AM-11:00AM MT o Location: Jacobsen Construction Office o 5181 West Amelia Earhart Drive, Salt Lake City, UT 84116 - Virtual Link to Pre-Bid Meeting: - https://teams.microsoft.com/meet/228995283181217?p=tFu29Xlr6vKkwqSbWV - Meeting ID: 228 995 283 181 217 - Passcode: 7mU9Fg2P Question Submission Link: Building Connected will be utilized as the Bidding and Proposal platform. Submit RFIs in writing on the Bid Manual RFI form to the Trade Captain for the applicable trade package. An NDA will be required prior to the release of documents. For a copy of the NDA and for Building Connected access, contact Jacquie White at Jacquie.White@aecom.com . Questions Deadline: - All RFI's should be turned in no later than November 4, 2026 at 3:00PM MT Proposal Deadline: - All Proposals should be turned in no later than November 13, 2026 at 3:00PM MT RFP & Proposal Submission Link: Building Connected will be utilized as the Bidding and Proposal platform. An NDA will be required prior to the release of documents. For a copy of the NDA and for Building Connected access, contact Jacquie White, Jacquie.White@aecom.com . Award will be made on a best-value basis to the responsible and responsive Proposer with the highest total score out of 100 points. Volume 1 technical scores will be finalized before Volume 2 cost information is reviewed, and any ties will be resolved by the Tie-Break procedure stated in the RFP. Pre-bid meeting information, evaluation criteria and scoring methodology, scope of work, FLCC requirements, subcontract terms, and all other requirements are contained in the complete Bid Manual. Procurement Contact: Jacquie White, Jacquie.White@aecom.com Hunt Jacobsen Joint Venture ------------------------------------------------------------------------------------------------------------------ Responses must be submitted to the link above by the due date and time. Responses submitted in U3P Bonfire will not be considered. The County is neither issuing or conducting procurement for this solicitation, as such it is the vendor's responsibility to review the entire solicitation at the link listed above to comply with the requirements. The contract award for this solicitation will not be posted on this website. Instead, vendors need to contact the designated individual/office as identified in the solicitation document.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity