SCB Replacement of Generator Controls and Switchgear (PID 004906DE) STEP 2

Closed State & local contract opportunity

Solicitation number
25-0073-ITB-C STEP 2
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Pinellas County is seeking a contractor for the SCB Replacement of Generator Controls and Switchgear project at the South Cross Bayou Advanced Waste Reclamation Facility (AWRF), with Bid No. 25-0073-ITB-C and Project ID 004906DE. The procurement involves comprehensive removal and replacement of two switchboard line-ups, including utility circuit breakers, generator circuit breakers, feeder circuit breakers, group mounted devices, and automatic failover systems. The project requires furnishing all equipment, materials, and labor to create fully operational and tested electrical systems. Mandatory project requirements include completing work within 450 consecutive calendar days, conducting an arc flash risk assessment, developing one-line electrical diagrams, performing short circuit and protective device coordination studies, and providing operations and maintenance manuals. A mandatory site visit is scheduled for February 13, 2024, at 1:00 PM, with project questions due by February 26, 2025. Proposal submissions are due March 13, 2025, at 3:00 PM, and contractors must be registered with the E-Verify system and provide comprehensive insurance coverage.

The project has Small Business Enterprise (SBE) compliance requirements and is part of a four-year program to replace 12 electrical switchgear units at the facility. Contractors must submit a detailed qualification package, including a bonding letter, project experience details, reference letters, and proof of financial stability. The total contract award is estimated at $2,032,000, with major cost components including $1,854,000 for switchgear replacement and demolition. Bidders must complete an OpenGov Fillable Form, provide vendor information, and demonstrate experience with similar infrastructure projects. The project targets switchgears that are 30-40 years old and located in a highly corrosive environment, necessitating comprehensive infrastructure investment. Existing infrastructure includes 277/480 volt, 2000 ampere rated switchboard line-ups that require networking circuit breakers, power monitoring, and automatic failover systems integration. Contractors will need to provide temporary generator power during the replacement process and conduct training for owner personnel.

Opportunity text

The work to be performed under these Contract Documents consists of the removal and replacement of two (2) switchboard line-ups, which include utility circuit breakers, generator circuit breakers, feeder circuit breakers, group mounted devices and automatic failover systems. The installation work is located at the Pinellas County South Cross Bayou Advanced Waste Reclamation Facility (AWRF). The work shall be inclusive of all equipment, materials and work required for operational systems that are complete and fully tested.

Files

File Type Posted
Designated_area_for_the_temporary_generators.pdf PDF
SCB_Replacement_of_Generator_Controls_and_Switchgear_(PID_004906DE)_STEP_2_(Addendum_#1_Revision).pdf PDF
Final_Plans_09-13-24.pdf PDF
SCB_Switchgear_BLA-BLB_Schedule_(For_review_only)_.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Project_Location_Map_(for_Legistar_only).pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
QUALIFICATION_SUBMITTAL_FORM_Non_FDOT.pdf PDF
Affdavit_of_Release_and_Guaranteev25-0073.pdf PDF
Agreement-25-0073.pdf PDF
Preliminary_Staff_Report_SCB_Switchgear_(BLA&BLB)_(for_Legistar_Only).docx DOCX document
Pricing_Proposal_25-0073(reference_only).pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
E-Verify_Affidavit.pdf PDF
Performance_and_Payment_Bonds.pdf PDF
Sample_Application_for_Payment.pdf PDF
Airport_Security_Program.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
SBE_Compliance_Form.pdf PDF
SCB_AWRF_Generator_Controls_Switchgear_-_Bid_Form_(BLA_BLB)_Contracts_10-29-24.xlsx XLSX spreadsheet
SCB_AWRF_Switchboard_BLA_&_BLB_Replacement_S&S_Specs_11-06-24.pdf PDF
Sample_Change_Order.pdf PDF
County_LD_Schedule_(for_Purchasing_only).xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity