RFB 27-54218 Burruss Park Bridge Construction

Open State & local contract opportunity Posted

Solicitation number
PE-63363-NONST-2027-000000034
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Marietta, Georgia is soliciting bids under RFB 27-54218 for construction of the Burruss Park bridge, with a mandatory pre-bid conference on November 23, 2026 and bids due December 4, 2026.

The project replaces a triple 42-inch culvert drain beneath the Burruss Park main trail with a 60-foot prefabricated vehicular-rated bridge. Scope includes removing the existing culverts, headwalls, trail surface, and trees; constructing bridge abutments; improving the stream bank; and installing the bridge. The city furnishes the prefabricated bridge and delivers it to the site, and the general contractor must coordinate its work with that delivery. Completion is required within 90 calendar days. All work must conform to Georgia Department of Transportation Standard Specifications and applicable Marietta Water specifications. The contractor secures all permits and approvals and must comply with Title VI of the Civil Rights Act of 1964 and other applicable federal regulations.

Award goes to the lowest responsive and responsible bidder on a single lump-sum base bid. Bidders must submit a bid bond or certified check equal to 5 percent of the bid amount and a notarized Contractor Affidavit and Agreement with the bid. The successful contractor must provide a 100 percent performance bond and a 110 percent labor and material payment bond within ten calendar days of award notification. Required insurance includes comprehensive general liability with minimum limits of $1 million per person and per occurrence for bodily injury and property damage, workers' compensation as required by statute, and automobile liability with $1 million combined single limits. The contractor must comply with the Georgia Security and Immigration Compliance Act, using E-Verify for all workers. Progress payments are made monthly on approved applications for satisfactorily completed work under an approved schedule of values.

Questions must be submitted through the BidNet Q&A platform by November 30, 2026 at 5:00 p.m. The pre-bid conference takes place November 23, 2026 at 10:00 a.m. at 75 South Cobb Drive, Marietta, Georgia. Electronic bids are due through BidNetDirect.com by 10:00 a.m. on December 4, 2026.

Opportunity text

The City of Marietta wishes to remove an existing triple (42") culvert drain passing under Burriss Park main trail, replacing it with a 60' prefabricated bridge. The Scope of Work includes but is not limited to the removal of the existing culverts, headwalls, trail surface, trees, etc. Project includes the construction of bridge abutments, improvements to the stream bank and the installation of the prefabricated vehicular rated bridge. The bridge will be furnished to the site by the city. The general contractor will be required to coordinate all their work with delivery of the bridge.

Files

File Type Posted
RFB 27_54218 Burruss Park Bridge Construction.pdf PDF