RFB-116-25 Greenbo Lake Concrete Storage Tank
Closed State & local contract opportunity Posted
- Solicitation number
- RFB-785-2500000212-5
- State
- Kentucky
- Responses due
Opportunity facts
- Jurisdiction
Updated .
About this opportunity
The Commonwealth of Kentucky, through the Department for Facilities and Support Services' Division of Engineering and Contract Administration, is seeking competitive bids for RFB-116-25, a comprehensive project to replace the existing potable water treatment plant and concrete storage tank at Greenbo Lake State Resort Park in Greenup County. The project involves removing the current infrastructure, constructing a new water storage tank, reconnecting the city water supply, and implementing new SCADA controls to monitor tank level and fill valve status. Key deliverables include electrical modifications, medium voltage underground feeder rework, relocation of a two-way radio antenna tower, and installation of new power and control wiring. A mandatory site visit was conducted on November 8, 2024, at 10:00 AM Eastern Time at 965 Lodge Road, Greenup, KY. The bid submission deadline has been updated through multiple addenda, with the final due date set for December 11, 2024, at 1:30 PM Eastern Time. Bidders are required to submit electronically through the Commonwealth's eProcurement system, with all actual bid amounts to be submitted on the Official Bid Document as an attachment.
The procurement does not explicitly mention set-aside designations or restrictions for disadvantaged enterprises. The project involves integration with existing DDC building automation systems, which will be handled by the incumbent DDC controls contractor. Two approved SCADA system integrators have been identified: Brian Gatewood from JAGS Environmental and Todd Bennett from CI Thornburg. The project includes additional complexity with hazardous material considerations, specifically asbestos removal from window glazing and lead abatement from painted surfaces, with estimated abatement costs of $2,500 for asbestos and $3,000 for OSHA lead compliance. While no specific budget range is provided, the detailed technical requirements, including SCADA controller programming, PCB testing, and specific electrical specifications, suggest a sophisticated infrastructure project. Consulting engineers for the project include Connolly Consulting Engineers and Kenvirons, indicating a structured approach to project management and technical implementation.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity