Reuse Reservoir Rehabilitation and Reuse Pump Station Project

Closed State & local contract opportunity Posted

Solicitation number
2025-2
State
Colorado
Responses due

Opportunity facts

Jurisdiction
Points of contact

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

The Plum Creek Water Reclamation Authority (PCWRA) in Douglas County, Colorado, is seeking bids for the Reuse Reservoir Rehabilitation and Reuse Pump Station Project, a comprehensive infrastructure improvement initiative. The procurement involves two bid options for rehabilitating a 33 million-gallon reuse reservoir and constructing a new reuse pump station. Specific project deliverables include site preparation, selective demolition, constructing a new pump station building (Building 4), installing reuse water distribution pipelines, creating a new intake structure and slide gate, removing and replacing the existing reservoir liner and underdrain systems, installing an aeration system, and revegetating disturbed areas. The project requires a mandatory pre-bid meeting on July 24, 2025, at 1:00 pm, with sealed bids to be received by August 13, 2025, at 10:00 am. PCWRA anticipates issuing a Notice of Award around August 27, 2025, with a total construction duration of 365 calendar days from the Notice to Proceed. Contractors must demonstrate detailed qualifications, including relevant experience, financial stability, and professional references, and the project will be performed at the PCWRA site located at 4255 N. US Highway 85 in Castle Rock, Colorado.

The procurement will be funded through multiple potential mechanisms, including a State Revolving Fund (SRF), and requires compliance with Davis-Bacon prevailing wage and American Iron and Steel provisions. Contractors must provide performance and labor/material payment bonds, with a 5% retainage in accordance with Colorado Revised Statutes. While no specific set-aside designations for disadvantaged enterprises were explicitly mentioned, the project demands comprehensive technical and financial capabilities from potential bidders. The project will involve integration with existing reuse transmission lines and infrastructure at the PCWRA site. Although a precise budget range was not specified in the documentation, the complexity of the project—involving reservoir rehabilitation, pump station construction, and extensive site work—suggests a substantial capital investment. Electronic bid documents will be available after July 15, 2024, and interested contractors should carefully review the comprehensive bid specification documents to understand the full scope of work and requirements.

Opportunity text

The rehabilitation of a 33 MG reuse reservoir and the construction of a new reuse pump station. The scope of services will include: reservoir relining per CDPHE impoundment requirements, a new pond aeration system, underdrain and the construction of a new reuse pump station that will tie into existing reuse transmission lines.