Reuse Reservoir Rehabilitation and Reuse Pump Station Project
Closed State & local contract opportunity Posted
- Solicitation number
- 2025-2
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 909 Building Construction Services, New, Including Maintenance And Repair Services
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 959 Marine Construction And Related Services; Marine Equipment Maintenance And Repair
- UNSPSC codes
- Points of contact
-
- Margaret Provencher mprovencher@geiconsultants.com
- Wes Martin wesmartin@pcwra.org (303) 688-1991
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Plum Creek Water Reclamation Authority (PCWRA) in Douglas County, Colorado, is seeking bids for the Reuse Reservoir Rehabilitation and Reuse Pump Station Project, a comprehensive infrastructure improvement initiative. The procurement involves two bid options for rehabilitating a 33 million-gallon reuse reservoir and constructing a new reuse pump station. Specific project deliverables include site preparation, selective demolition, constructing a new pump station building (Building 4), installing reuse water distribution pipelines, creating a new intake structure and slide gate, removing and replacing the existing reservoir liner and underdrain systems, installing an aeration system, and revegetating disturbed areas. The project requires a mandatory pre-bid meeting on July 24, 2025, at 1:00 pm, with sealed bids to be received by August 13, 2025, at 10:00 am. PCWRA anticipates issuing a Notice of Award around August 27, 2025, with a total construction duration of 365 calendar days from the Notice to Proceed. Contractors must demonstrate detailed qualifications, including relevant experience, financial stability, and professional references, and the project will be performed at the PCWRA site located at 4255 N. US Highway 85 in Castle Rock, Colorado.
The procurement will be funded through multiple potential mechanisms, including a State Revolving Fund (SRF), and requires compliance with Davis-Bacon prevailing wage and American Iron and Steel provisions. Contractors must provide performance and labor/material payment bonds, with a 5% retainage in accordance with Colorado Revised Statutes. While no specific set-aside designations for disadvantaged enterprises were explicitly mentioned, the project demands comprehensive technical and financial capabilities from potential bidders. The project will involve integration with existing reuse transmission lines and infrastructure at the PCWRA site. Although a precise budget range was not specified in the documentation, the complexity of the project—involving reservoir rehabilitation, pump station construction, and extensive site work—suggests a substantial capital investment. Electronic bid documents will be available after July 15, 2024, and interested contractors should carefully review the comprehensive bid specification documents to understand the full scope of work and requirements.
Opportunity text
The rehabilitation of a 33 MG reuse reservoir and the construction of a new reuse pump station. The scope of services will include: reservoir relining per CDPHE impoundment requirements, a new pond aeration system, underdrain and the construction of a new reuse pump station that will tie into existing reuse transmission lines.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity