Request For Qualifications Construction Manager at Risk Services Sacramento International Airport Terminal A Restroom Rehabilitation Project
Closed State & local contract opportunity
- Solicitation number
- 2022-GEN-0013
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 90610 Buildings - Architectural Design
- 90625 Design Build Services
- 90735 Designing Services
- 90910 Airport Facility Construction
- 91172 Design / Bid Contingency
- 918 Consulting Services
- 91815 Architectural Consulting
- 91819 Buildings, Structures And Components Consulting
- 91831 Construction Consulting
- 91832 Consulting Services (Not Otherwise Classified)
- UNSPSC codes
- 94000000 Organizations and Clubs
- 90152101 Personal assistance services
- 95121612 Airport control tower
- 90152100 Concierge services
- 92110000 Military services and national defense
- 95121611 Airport building
- 80101709 Emergency response management and consultancy services
- 81103008 Marine consultancy services
- 93000000 Politics and Civic Affairs Services
- 81130000 Statistics
- Point of contact
-
- Jonathan Martinez jhmartinez@saccounty.gov (916) 876-6367
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The Sacramento County Department of Airports is seeking a Construction Manager at Risk (CMAR) for the Terminal A Restroom Rehabilitation Project at Sacramento International Airport. The procurement involves a two-phase approach focusing on preconstruction services and subsequent construction, with key objectives including increasing restroom privacy, safety, comfort, and user-friendliness through modern design principles. Specific deliverables include design document review, value engineering, constructability analysis, project scheduling, and cost estimation culminating in a Guaranteed Maximum Price (GMP). Qualified firms must hold a Class B or higher Contractors License and demonstrate extensive experience with preconstruction services and CMAR delivery methods in government agency projects. The evaluation process will be comprehensive, involving three steps: qualification review, interviews, and fee proposal comparison. Critical deadlines include Statement of Qualifications (SOQ) submission by June 16, 2022, at 3:00 p.m. DST, projected interviews between July 12-14, 2022, and anticipated Board of Supervisors approval in September 2022.
The procurement does not explicitly specify set-aside designations or restrictions for disadvantaged enterprises. The project will involve renovating eight public restrooms across pre-security and secured airport areas, with careful phasing to maintain continuous restroom availability. No incumbent vendors are mentioned in the documentation. The total estimated construction cost is $8 million, with the overall project budget, including soft costs, allowances, and contingencies, estimated at $12 million. The Department of Airports will seek a Federal Grant to support the work, and the selected CMAR will be responsible for coordinating subcontractors, managing construction logistics, and ensuring project completion by June 2024 or sooner. The project timeline spans from January 2023 to June 2024, with a focus on implementing design principles that maximize space layout, incorporate smart technologies, and provide flexibility for future modifications.
Opportunity text
The County of Sacramento Department of Airports is seeking a qualified firm, partnership, corporation, association, persons, or professional organizations as construction manager at-risk ("CMAR" or "Firm") to perform pre-construction and construction services for the Sacramento International Airport Terminal A Restroom Rehabilitation Project (Project).
The new design of the restrooms follows several principles:
- Increase privacy and safety by providing private individual water closet rooms
- Increase comfort and experience with a more open space, better-balanced lighting, and implementing calming color schemes
- Increase ease of maintenance by consolidating areas that require frequent attention and servicing
- Increase user-friendliness by incorporating modern sensor activated devices and smart technologies
- Maximize space layout by arranging spaces according to activities and providing flexibility for future modifications and conversions
The Department envisions construction to be completed no later than June 2024 or sooner. In general, the selected CMAR delivery method will involve two parts:
- Preconstruction services including review of the design documents and cost estimate prepared by the County's consulting architect, value engineering (VE) and constructability/means and methods analysis, and recommendations for design changes. Additional preconstruction services to prepare an overall project schedule, draft cost estimates and final cost proposal in the form of a Guaranteed Maximum Price (GMP), and
- Construction of the project
The Department of Airports will be seeking a Federal Grant for this work. The estimated total construction cost for the Project is $8 Million. The project cost including construction and all other soft costs, allowances and contingencies is estimated to be $12 Million.
Files
| File | Type | Posted |
|---|---|---|
| RFQ_-_CMAR_Terminal_A_Restroom_Rehabilitation_Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity