PW 2025 Bridge Scour Mitigation Project City Project No. 106227

Closed State & local contract opportunity Posted

Solicitation number
26-0261
State
Texas
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 35

Opportunity details come from fortworthtexas.bonfirehub.com. Updated .

About this opportunity

The City of Fort Worth Public Works Department is requesting bids on the 2025 Bridge Scour Mitigation Project (City Project No. 106227) for stone protection riprap and concrete riprap installation at two bridge locations, with bids due August 27, 2026.

The scope consists of two units: Unit 1 requires installation of approximately 20 cubic yards of grouted stone protection riprap at the N Beach Street Bridge; Unit 2 requires approximately 550 cubic yards of stone protection riprap and 30 cubic yards of concrete riprap (RR8) at the S University Drive Bridge. Additional work includes site clearing (1,000 square yards), tree removal (one tree each in the 12"–18" and 24"+ categories), unclassified excavation, placement of select fill (90 cubic yards), topsoil application (80 cubic yards), block sod placement (870 square yards), and miscellaneous concrete structure removal. Contract completion is 90 days from commencement.

Nonresident bidders (principal place of business outside Texas) must complete Section 00 43 37 identifying their home state and the required underbidding percentage per Texas Government Code Chapter 2252, or face automatic disqualification. All bidders must submit a bid bond equal to five percent of the maximum bid price, issued by a surety meeting specified requirements, and include conflict of interest forms, proposal forms, vendor compliance statements, small business forms, and prequalification statements. Bids must present unit prices for all 14 line items with extended amounts and are submitted to the City of Fort Worth Purchasing Division at 200 Texas Street, Fort Worth, Texas 76102. The City reserves the right to apply liquidated damages for failure to meet the 90-day completion timeline.

Opportunity text

The major work will consist of the (approximate) following: • Install approximately 20 CY of grouted stone protection riprap at the N Beach Street Bridge. • Install approximately 550 CY of stone protection riprap and 30 CY of concrete riprap at the S University Drive Bridge.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity