Progressive Design/Build Services for the Big Creek Greenway Rehabilitation, Phases 2&3, 4 and Bethelview Trailhead: Readvertisement

Closed State & local contract opportunity Posted

Solicitation number
25-69-1514R
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 38

Opportunity details come from forsythco.bonfirehub.com. Updated .

About this opportunity

Forsyth County is seeking Progressive Design-Build Services for the Big Creek Greenway Rehabilitation project, which encompasses Phases 2 & 3, Phase 4, and the Bethelview Trailhead. The procurement involves comprehensive design and construction services for rehabilitating existing trail infrastructure, including removing and reconstructing timber boardwalks using helical piles, steel beams, and timber decks, along with targeted erosion repair and drainage improvements. The Bethelview Trailhead will be reconstructed with parking lot repaving and drainage enhancements. Proposers will be evaluated using a 100-point scoring system, with points allocated across categories including transmittal letter, project approach, experience of key personnel, overall firm experience, and project schedule. The Request for Proposals (RFP) was released on September 4, 2025, with proposals due on October 9, 2025, at 2:00 p.m. EST. A non-mandatory virtual pre-proposal conference is scheduled for September 11, 2025, at 10:00 a.m. EST via Microsoft Teams, with the last day to submit questions being September 29, 2025, by 12:00 p.m. EST. The project is anticipated to be substantially complete by October 31, 2027, with final completion by December 31, 2027.

The procurement does not explicitly specify set-aside designations or restrictions for disadvantaged enterprises. The contract will be awarded on a Progressive Design-Build basis, utilizing a two-stage approach with a Preliminary Stage involving study and report services, and a Completion Stage focusing on final design, construction, and project closeout. Proposers are required to provide performance and payment bonds, with specific insurance requirements including commercial general liability, workers' compensation, automobile liability, and professional liability coverage. The contract will employ a Cost of the Work plus a Fee method, subject to a Guaranteed Maximum Price. While specific budget ranges are not directly stated, the comprehensive nature of the project involving multiple trail segments and a trailhead reconstruction suggests a significant investment. Proposers must submit a Proposal Security or Certified Check for 5% of the total proposed cost, and the successful bidder will need to provide Performance and Payment Bonds each covering 100% of the contract value. All submissions must be made electronically through the Bonfire platform, with proposals remaining valid for 90 days following the proposal opening.

Opportunity text

Progressive Design-Build Services for the Big Creek Greenway Rehabilitation, Phases 2 & 3, 4 and Bethelview Trailhead

Files

File Type Posted
13-30% Design Drawings for Phases 23, Segment 2 - Mile Marker 5.5 to 5.7.pdf PDF
14-Plan for the Rehabilitation, Restoration and Renewal 09252019.pdf PDF
17-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf PDF
9-BCG Site Reconnaissance and Subsurface Exploration Phases 23 Segment 3.pdf PDF
1-2. RFP 25-69-1514R BCG PDB RFP Package 09032025.pdf PDF
10-90% Drawings for Phases 23, Segment 1 - Fowler Park Connection.pdf PDF
11-Big Creek Greenway Phases 23 Ecology Survey - Waters.pdf PDF
4-Bethelview Trailhead Improvements-Percolation Test Report.pdf PDF
7-Big Creek Greenway Bethelview Trailhead - Hydrology Report May 2024.pdf PDF
12-100% Design Drawings for Bethelview Trailhead.pdf PDF
15-Big Creek Greenway Phase 4 - Ecology Survey - Waters.pdf PDF
16-30% Design Drawings for Phase 4, Segment 1 - Bethelview Trailhead to Keithwood Drive.pdf PDF
19-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf PDF
5-Summary of Work 09032025.pdf PDF
18-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf PDF
2-1. Re-Advertisement-RFP 25-69-1514 PDB Big Creek Greenway.pdf PDF
3-Specifications for Helical Pile Foundation.pdf PDF
6-Existing Conditions BCG Phase 4 Inspection Rating.pdf PDF
8-60% Design Drawings for Phase 4, Segment 2 - Keithwood Drive to Kelly Mill Rd.pdf PDF
Show all 19

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors