17-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf
PDF 106 MB Posted
- Solicitation number
- 25-69-1514R
- Issued by
- Fayette County, Georgia
About this file
The file "17-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf" appears to be a design document related to the Big Creek Greenway Rehabilitation project in Georgia, specifically focusing on design drawings for a segment of the project. The document is associated with a progressive design-build services contract for rehabilitation of Phases 2, 3, 4 and the Bethelview Trailhead. The drawings specifically cover a road or trail segment spanning mile markers 5.7 to 6.3, representing a 0.6-mile section of the overall project.
The design drawings are at the 17-30% completion stage, indicating an intermediate phase of engineering and design development. While specific pricing details are not evident in the provided file, the project appears to be a local infrastructure improvement initiative in Georgia, likely funded through municipal or county transportation or parks and recreation budgets. The progressive design-build approach suggests a collaborative method where design and construction services are integrated, allowing for potential cost efficiencies and adaptable project implementation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .