18-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf
PDF 125 MB Posted
- Solicitation number
- 25-69-1514R
- Issued by
- Fayette County, Georgia
About this file
The document appears to be a technical drawing file titled "18-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8" related to the Big Creek Greenway Rehabilitation project in Georgia. The file is specifically associated with a Progressive Design-Build Services contract for trail rehabilitation and extension, focusing on Phases 2, 3, 4, and the Bethelview Trailhead. The design drawings represent an intermediate stage of technical development, covering a specific segment of the trail between mile markers 6.3 and 6.8, indicating a precise geographical scope for the engineering and construction work.
While the file does not contain explicit pricing or funding details, its connection to the state-level contract opportunity suggests this is part of a larger infrastructure improvement initiative for the Big Creek Greenway in Georgia. The progressive design-build approach implies a collaborative, phased methodology where design and construction services are integrated, allowing for flexibility and potential refinements throughout the project lifecycle. The specific focus on 18-30% design drawings indicates the project is in an early to mid-stage of technical planning, with further detailed design and engineering work anticipated in subsequent phases.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .