18-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf

PDF 125 MB Posted

Attached to
Progressive Design/Build Services for the Big Creek Greenway Rehabilitation, Phases 2&3, 4 and Bethelview Trailhead: Readvertisement
Solicitation number
25-69-1514R
Issued by
Fayette County, Georgia

About this file

The document appears to be a technical drawing file titled "18-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8" related to the Big Creek Greenway Rehabilitation project in Georgia. The file is specifically associated with a Progressive Design-Build Services contract for trail rehabilitation and extension, focusing on Phases 2, 3, 4, and the Bethelview Trailhead. The design drawings represent an intermediate stage of technical development, covering a specific segment of the trail between mile markers 6.3 and 6.8, indicating a precise geographical scope for the engineering and construction work.

While the file does not contain explicit pricing or funding details, its connection to the state-level contract opportunity suggests this is part of a larger infrastructure improvement initiative for the Big Creek Greenway in Georgia. The progressive design-build approach implies a collaborative, phased methodology where design and construction services are integrated, allowing for flexibility and potential refinements throughout the project lifecycle. The specific focus on 18-30% design drawings indicates the project is in an early to mid-stage of technical planning, with further detailed design and engineering work anticipated in subsequent phases.

View the file

Other files

File Type Posted
9-BCG Site Reconnaissance and Subsurface Exploration Phases 23 Segment 3.pdf PDF
15-Big Creek Greenway Phase 4 - Ecology Survey - Waters.pdf PDF
19-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf PDF
6-Existing Conditions BCG Phase 4 Inspection Rating.pdf PDF
3-Specifications for Helical Pile Foundation.pdf PDF
7-Big Creek Greenway Bethelview Trailhead - Hydrology Report May 2024.pdf PDF
4-Bethelview Trailhead Improvements-Percolation Test Report.pdf PDF
11-Big Creek Greenway Phases 23 Ecology Survey - Waters.pdf PDF
10-90% Drawings for Phases 23, Segment 1 - Fowler Park Connection.pdf PDF
8-60% Design Drawings for Phase 4, Segment 2 - Keithwood Drive to Kelly Mill Rd.pdf PDF
17-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf PDF
14-Plan for the Rehabilitation, Restoration and Renewal 09252019.pdf PDF
13-30% Design Drawings for Phases 23, Segment 2 - Mile Marker 5.5 to 5.7.pdf PDF
1-2. RFP 25-69-1514R BCG PDB RFP Package 09032025.pdf PDF
2-1. Re-Advertisement-RFP 25-69-1514 PDB Big Creek Greenway.pdf PDF
12-100% Design Drawings for Bethelview Trailhead.pdf PDF
5-Summary of Work 09032025.pdf PDF
16-30% Design Drawings for Phase 4, Segment 1 - Bethelview Trailhead to Keithwood Drive.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .