The file is an Aquatic Resources Map for the Big Creek Greenway Phase 4 project located in Forsyth County, Georgia. The document contains five detailed aerial maps (Figures 1A through 1E) showing the ecological survey of the project area, specifically mapping various water resources including perennial streams, intermittent streams, emergent wetlands, forested wetlands, and open water bodies. The maps systematically document the environmental characteristics of the project site, with each figure covering a different segment of the proposed greenway rehabilitation area.

The related state and local contract opportunity involves progressive design-build services for the Big Creek Greenway Rehabilitation, specifically covering Phases 2, 3, 4, and the Bethelview Trailhead. The ecological survey maps provide critical environmental documentation for the project, detailing the precise location and classification of aquatic resources that will need to be considered during the design and construction phases. The maps identify multiple water resource types, including streams labeled PS 2/Big Creek, various intermittent streams (IS), wetlands (WL), and open water areas (OW), which will be crucial for environmental compliance and site planning in the greenway rehabilitation project.

View the file

Other files

File Type Posted
9-BCG Site Reconnaissance and Subsurface Exploration Phases 23 Segment 3.pdf PDF
19-30% Design Drawings for Phases 23, Segment 5 - Mile Marker 6.8 to Bethelview Trailhead.pdf PDF
6-Existing Conditions BCG Phase 4 Inspection Rating.pdf PDF
3-Specifications for Helical Pile Foundation.pdf PDF
18-30% Design Drawings for Phases 23, Segment 4 - Mile Marker 6.3 to 6.8.pdf PDF
7-Big Creek Greenway Bethelview Trailhead - Hydrology Report May 2024.pdf PDF
4-Bethelview Trailhead Improvements-Percolation Test Report.pdf PDF
11-Big Creek Greenway Phases 23 Ecology Survey - Waters.pdf PDF
10-90% Drawings for Phases 23, Segment 1 - Fowler Park Connection.pdf PDF
8-60% Design Drawings for Phase 4, Segment 2 - Keithwood Drive to Kelly Mill Rd.pdf PDF
17-30% Design Drawings for Phases 23, Segment 3 - Mile Marker 5.7 to 6.3.pdf PDF
14-Plan for the Rehabilitation, Restoration and Renewal 09252019.pdf PDF
13-30% Design Drawings for Phases 23, Segment 2 - Mile Marker 5.5 to 5.7.pdf PDF
1-2. RFP 25-69-1514R BCG PDB RFP Package 09032025.pdf PDF
2-1. Re-Advertisement-RFP 25-69-1514 PDB Big Creek Greenway.pdf PDF
12-100% Design Drawings for Bethelview Trailhead.pdf PDF
5-Summary of Work 09032025.pdf PDF
16-30% Design Drawings for Phase 4, Segment 1 - Bethelview Trailhead to Keithwood Drive.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OW 1

PS 2/Big Creek

NBSW A

WL 3

IS 4IS 4

Match to Figure 1B

Forsyth

Fulton

Ch ero ke e

Gw inn ett

Source: Esri Aerial Imagery

Big Creek Greenway Phase 4 Forsyth County, Georgia

Figure 1A. Aquatic Resources Map (Aerial)

0 200 400 Feet

Legend

ESB

Perennial Stream Intermittent Stream Emergent Wetland Forested Wetland Open Water Non-Buffered State Water

PS 2/Big Creek

IS 5IS 5

NBSW B

WL 8b (Forested)

WL 8a (Emergent)

IS 6

IS 7

Match to Figure 1C

Match to Figure 1A

Forsyth

Fulton

Ch ero ke e

Gw inn ett

Source: Esri Aerial Imagery

Big Creek Greenway Phase 4 Forsyth County, Georgia

Figure 1B. Aquatic Resources Map (Aerial)

0 200 400 Feet

Legend

ESB

Perennial Stream Intermittent Stream Emergent Wetland Forested Wetland

NBSW

IS 6

IS 9

Wl 8b (Forested)

IS 10

NBSW C

NBSW E

NBSW F

IS 11

NBSW G

NBSW D

Match to Figure 1B

Match to Figure 1D

Forsyth

Fulton

Ch ero ke e

Gw inn ett

Source: Esri Aerial Imagery

Big Creek Greenway Phase 4 Forsyth County, Georgia

Figure 1C. Aquatic Resources Map (Aerial)

0 200 400 Feet

Legend

ESB

Perennial Stream Intermittent Stream Emergent Wetland Forested Wetland

NBSW H

NBSW I

IS 12

NBSW J

Match to Figure 1C

Match to Figure 1E

Forsyth

Fulton

Ch ero ke e

Gw inn ett

Source: Esri Aerial Imagery

Big Creek Greenway Phase 4 Forsyth County, Georgia

Figure 1D. Aquatic Resources Map (Aerial)

0 200 400 Feet

Legend

ESB

Perennial Stream Intermittent Stream Emergent Wetland Forested Wetland

NBSW K

PS 14

PS 14

PS 2/Big Creek

WL 13 (Emergent)

TextWL 15 (Forested)

WL 16 (Emergent)

OW 17

IS 18

WL 16 (Emergent)

Match to Figure 1D

Forsyth

Fulton

Ch ero ke e

Gw inn ett

Source: Esri Aerial Imagery

Big Creek Greenway Phase 4 Forsyth County, Georgia

Figure 1E. Aquatic Resources Map (Aerial)

0 200 400 Feet

Legend

ESB

Perennial Stream Intermittent Stream Emergent Wetland Forested Wetland

File details come from the government source that posted it. Updated .