Paved Pathway Maintenance – Crack Seal, Mastic, Seal Coat and Striping

Closed State & local contract opportunity Posted

Solicitation number
GC10030
State
Utah
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

Grand County, Utah is soliciting proposals from qualified contractors to perform pavement preservation and maintenance on approximately 10.5 miles of paved pathways across the Moab Canyon Corridor, Colorado River Corridor, and Lions Park perimeter pathway, with proposals due September 28, 2026.

The scope encompasses crack sealing, wide-crack mastic repair, surface preparation, two applications of seal coat with traction agent, and pavement striping on an estimated 800,000 square feet of paved surface. Pavement striping includes concrete sections; concrete repair and refurbishment are excluded. Work must comply with Utah APWA Manual of Standard Specifications and applicable federal, state, and local requirements. The County prefers Maxwell Products for crack-seal and mastic materials but permits equivalent products meeting specified performance requirements. All labor, supervision, materials, equipment, transportation, traffic control, cleanup, and incidentals are the contractor's responsibility. The successful contractor must submit all prices as not-to-exceed amounts for the entire project and must verify existing conditions and quantities during site inspection before proposal submission.

Work is restricted to Monday through Friday during daylight hours; no weekend work is permitted. The project is subject to environmental constraints due to proximity to Arches National Park and Utah Division of Natural Resources-managed property, with all construction activity limited to paved surfaces unless specifically authorized.

Evaluation will prioritize the responsive and responsible contractor offering the best combination of qualifications, experience, material quality, project schedule, and total project cost. The County reserves the right to adjust quantities within the approved not-to-exceed amount based on actual field conditions.

Contractors seeking .kml files for the Colorado River Bike Path and Moab Canyon Pathway should email cmckinney@grandcountyutah.gov. Site inspection and contractor verification of conditions are strongly encouraged before proposal submission.

Opportunity text

Grand County, Utah is soliciting proposals from qualified contractors to perform pavement preservation and maintenance on approximately 10.5 miles of paved pathway within the following corridors: Moab Canyon Corridor, Colorado River Corridor, and Lions Park perimeter pathway. The work generally consists of crack sealing, wide-crack mastic repair, surface preparation, 2 applications of seal coat with a traction agent, and pavement striping. Pavement striping will encompass the entire pathway, concrete sections included (concrete section repair/refurbishment is not considered in the RFP). The County's estimated seal-coat area is 800,000 square feet. The estimated quantities for crack sealant, mastic, and striping are provided for bidding and comparison purposes. Contractors shall verify existing conditions and quantities during their site inspection. The successful contractor shall furnish all labor, supervision, materials, equipment, transportation, traffic control, cleanup, and incidentals necessary to complete the work in accordance with this Scope of Work. All proposed prices shall be Not-to-Exceed amounts for completion of the entire project. For .kml files associated with the Colorado River Bike Path and the Moab Canyon Pathway, email a request to cmckinney@grandcountyutah.gov.

Files

File Type Posted
1-GC PavedPath RFP 21SEP2026.docx DOCX document
3-PAVED PATH LIONS PARK.pdf PDF
2-Transit Hub and Lions Park Closeup.jpg JPG image