Palmer Middle School Roof Replacement

Closed State & local contract opportunity Posted

Solicitation number
B26001
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from cobbk12.bonfirehub.com. Updated .

About this opportunity

The state of Puerto Rico is seeking a comprehensive roof replacement project for Palmer Middle School, focusing on a complete removal and replacement of the existing roofing system. The procurement involves removing granular surface modified bitumen membranes, roofing insulation, and flashings down to the structural metal deck, with subsequent installation of a new insulated modified bitumen roofing system. The project requires detailed work including deck board installation, vapor barrier application, insulation placement, tapered insulation crickets, cover board installation, and multiple-ply modified bitumen roofing. Additionally, contractors must replace all sheet metal flashing, trim, coping, gutters, leaders, through-wall scuppers, and roof drains. The project also mandates disconnection, removal, and reinstallation of existing rooftop mechanical units on new curbs/rails to achieve a minimum 12-inch high base flashing. The invitation was posted on August 18, 2025, with proposals due by September 25, 2025, and all work must comply with applicable building codes and regulations.

While specific set-aside designations are not explicitly detailed in the provided documentation, the project appears to be a standard public works procurement open to qualified roofing contractors with demonstrated experience in comprehensive school roof replacement projects. The scope suggests a need for specialized commercial roofing expertise, particularly in modified bitumen systems and mechanical unit relocation. Although a precise budget range is not specified, similar school roofing projects typically range from $250,000 to $750,000 depending on the facility's size and complexity. The project will require contractors to have appropriate licensing, insurance, and technical capabilities to execute a complete roof system replacement while maintaining school facility operations and safety standards. Potential bidders should carefully review the full invitation document for specific qualification requirements, technical specifications, and submission guidelines to ensure compliance with Puerto Rico's procurement protocols.

Opportunity text

This project consists of the removal of granular surface modified bitumen membranes, roofing insulation, and roofing flashings down to the structural metal deck. Provision of replacement insulated modified bitumen roofing system (deck board, vapor barrier, insulation, tapered insulation crickets where applicable, cover board, and multiple ply modified bitumen roofing system) and flashings. Removal and replacement of all sheet metal flashing and trim, coping, gutters, leaders, thru wall scuppers, and flashings associated with roofing. Removal and replacement of all roof drains. Perform all associated work, such as disconnection, removal, reinstallation, and reconnection of existing rooftop mechanical units on replacement curbs/rails so as to achieve a minimum 12" high base flashing. All low slope roofing shall be removed and replaced. Work shall be in compliance with applicable codes.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors