Orange belt trail phase 1 (little road to cool springs parkway)
Open State & local contract opportunity Posted
- Solicitation number
- IFB-KM-27-032
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 15010 Construction Materials (Not Otherwise Classified)
- 80160 Signs: Construction (Including Roll-Up Type Message Signs)
- 90975 Site Clean-Up, Post-Construction
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91226 Construction, Hike And Bike Trail
- 91232 Construction, Street Lighting
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- 91327 Construction, Highway And Road
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
Show all 16
- 91357 Construction, Vaulted Sidewalk
- 91382 Maintenance And Repair, Sidewalk And Driveway (Including Removal)
- 92931 Construction Equipment Maintenance And Repair (Not Otherwise Listed)
- 94065 Railroad Construction At Street Intersection (Including Maintenance And Repair)
- 98877 Skating Rink Maintenance And Repair, To Include Resurfacing, Ice
- 98879 Ski Trail Maintenance And Repair
Opportunity details come from pascocountyfl.bonfirehub.com. Updated .
About this opportunity
The Pasco County Board of County Commissioners is soliciting bids for construction of Phase 1 of the Orange Belt Trail, a 12-foot-wide trail along the south side of Trinity Boulevard, with bids due January 5, 2027. The trail runs from the existing sidewalk at the southwest corner of Trinity Boulevard and Little Road to tie into the existing trail at Trinity Boulevard and Cool Springs Parkway, and the solicitation states that work follows project-specific conditions.
Opportunity text
The Pasco County Board of County Commissioners invites vendors to submit bids for the construction of a 12 foot wide trail along the south side of Trinity Boulevard starting from the existing sidewalk in the southwest corner of Trinity Boulevard and Little Road intersection and tie into the existing trail at the intersection of Trinity Boulevard and Cool Springs Parkway, as per the project specific conditions.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity