Design and Bid Support Services for New Administration Building at Water Resource Recovery Facility
Open State & local contract opportunity Posted
- Solicitation number
- 27-14
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Rebecca Norris rebecca.norris@oxnard.org (805) 385-7553
- Jackie Nguyen jbnguyen@newportbeachca.gov (949) 644-3065
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Newport Beach is seeking qualified contractors to provide on-call asphalt, concrete, and concrete grinding repair services citywide under Invitation 27-14, with electronic bids due October 15, 2026 at 1:00 PM PDT and a pre-bid meeting on September 30, 2026 at 1:34 PM.
Contractors and subcontractors must be registered with the California Department of Industrial Relations pursuant to Labor Code section 1725.5, with limited exceptions for bid purposes only. This is the key eligibility gate.
The scope encompasses full-depth asphalt and concrete street removal and replacement, partial-depth asphalt grind and cap repairs, street marking stripping and painting, sidewalk panel and access ramp replacement with saw cutting and root pruning, sidewalk grinding using dry vertical carbide equipment to achieve minimum 1" to 1' non-slip surface ratios, curb and gutter work, and repairs to private or public property damaged during job assignments. The contractor furnishes all labor, materials, equipment, traffic control, and supervision.
The estimated bid value is $1.25 million on a lump-sum basis. Bid, payment, and performance bonds are required at 10 percent, 100 percent, and 100 percent respectively. Work must comply with City Standards and the Standard Specifications for Public Works Construction.
The Q&A deadline is September 29, 2026 at 12:00 PM PDT. Sealed copies of the bidders' bond must be submitted to the City Clerk prior to bid opening. Responses must be submitted electronically through the PlanetBids Vendor Portal; hard copy submissions will not be accepted. The contact is Jackie Nguyen, City of Newport Beach Finance Department, 100 Civic Center Drive, Newport Beach, California 92660.
Opportunity text
3 versions
Update #3 · Latest ·
The City of Oxnard Water Resource Recovery Facility (WRRF) is seeking a qualified and experienced Consultant to provide professional architectural, engineering, and environmental services for the Project and all related and appurtenant and adjacent work, including preliminary studies, programming, environmental assessment, architectural and engineering design, permitting, preparation of construction bid documents, and construction phase services. The Consultant shall prepare all drawings, specifications, cost estimates, and related documentation required for City review and for solicitation of construction bids. The Consultant shall also provide bidding and construction-phase support services, including reviewing contractor bids, responding to RFIs, reviewing submittals, and attending construction progress meetings as needed. All work shall comply with applicable City, County, State, and Federal codes, regulations, and permitting requirements.
Update #2 ·
Alterations to the Wawona Middle School Administration Building, including renovations and improvements to existing facilities to enhance functionality and support school administrative operations.
Update #1 ·
The City of Newport Beach is seeking qualified contractors to provide citywide on-call asphalt, concrete, and concrete grinding repair services. Work will be assigned on an as-needed basis and may include street pavement repairs, concrete flatwork replacement, curb and gutter work, access ramp upgrades, and sidewalk grinding to eliminate tripping hazards. The selected contractor will be responsible for furnishing all labor, materials, equipment, traffic control, and supervision necessary to perform the following services: Full depth asphalt and concrete street removal and replacement. Partial depth asphalt grind and cap street repairs. Stripping and painting of street markings. Replacement of sidewalk panels, access ramps, cross gutters, driveway approaches, and curb and gutter, including saw cutting, root pruning, and sprinkler repairs. Sidewalk grinding to reduce tripping hazards citywide, using dry vertical carbide grinding equipment leaving a non-slip surface, meeting a minimum 1" to 1' ratio. Repairs to any private or public property damaged during a typical job assignment.