Northwest Well Treatment Facility
Closed State & local contract opportunity
- Solicitation number
- 240220
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 90735 Designing Services
- 925 Engineering Services, Professional
- 92517 Civil Engineering
- 92522 Control Systems Engineering
- 92533 Engineer Services, Professional
- 92536 Engineering Services (Not Otherwise Classified)
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 81102501 Mine permitting service
- 81103300 Geomatics engineering
- 81101500 Civil engineering
- 81101501 Well engineering
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 81101527 Wastewater engineering
Show all 19
- 81101528 Stormwater engineering
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81102702 Process control system design and engineering service
- 81101531 Sanitation engineering service
- 81101529 Acoustic engineering
- 81101606 Marine engineering
- Point of contact
-
- Vanessa Guzman vanessa.guzman@tucsonaz.gov (520) 837-4375
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Tucson is requesting professional design services for the Northwest Well Treatment Facility through Request for Qualifications (RFQ) No. 240220, which will address groundwater contamination in the northwest portion of the city's water service area. The project involves designing a centralized treatment facility to treat raw water from three wells (Z-013, Z-014, and Z-015) for perfluoroalkyl substances (PFAS) and 1,4-dioxane, with the objective of restoring potable water capacity and system redundancy to produce up to 3.7 million gallons per day (MGD) of potable water. The design consultant will be responsible for comprehensive services including project management, site plan development, pipeline route refinement, preliminary and detailed design, permitting, and construction phase services. The project will be delivered using a construction manager at risk (CMAR) method and is funded through the Water Infrastructure Finance Authority (WIFA), potentially involving American Rescue Plan Act (ARPA) funding. The solicitation was published on June 4, 2024, with a submittal due date of Tuesday, July 16, 2024, at 2:00 pm local time, and a pre-submittal conference is scheduled for Tuesday, June 25, 2024, at 10:00 am via Microsoft Teams. The evaluation will be conducted in two phases: an initial qualifications review followed by interviews with up to three shortlisted firms.
The project includes specific provisions for Disadvantaged Business Enterprise (DBE) participation, requiring contractors to make good faith efforts to include DBE firms certified under the Arizona Unified Certification Program. Contractors must comply with various local, state, and federal regulations, including American Iron and Steel (AIS) and Build America, Buy American (BABA) Act requirements. The project involves replacing nine production wells that were previously taken out of service due to contamination, with the potential for significant infrastructure improvements in the northwest Tucson area. While specific budget details are not explicitly stated, technical memoranda suggest total capital costs ranging from $19.6 million to $33.5 million, with annual operations and maintenance costs between $110,000 and $1.09 million. The project aims to reactivate three dormant wells to withdraw and treat up to 4,144 acre-feet per year, improving water supply reliability and quality for Tucson Water customers while addressing emerging contaminants in the groundwater supply.
Opportunity text
The City of Tucson (City) is requesting professional services and design of the Northwest Well Treatment Facility that will treat raw water from three wells for perfluoroalkyl substances (PFAS) and 1,4-dioxane and provide up to 3.7 MGD of potable water to the northwest portion of the service area. The northwest area currently has limited capacity and redundancy, due to PFAS and 1,4-dioxane in the groundwater supply. The objective for this project is to restore lost capacity and redundancy by treating the elevated levels of PFAS and 1,4-dioxane and maintaining a high level or service to Tucson Water customers.