This technical memorandum, prepared by Carollo Engineers for the Tucson Water Department, evaluates alternatives for treating groundwater contamination in the Northwest Area Wells. The study focuses on addressing emerging contaminants, specifically perfluoroalkyl substances (PFAS), 1,4-dioxane, and trichloroethene (TCE) in nine production wells that were taken out of service between 2016 and 2018. The wells were grouped into three clusters (Northern, Central, and Southern) and analyzed for potential treatment technologies, including granular activated carbon (GAC) adsorption, ion exchange (IX), and ultraviolet advanced oxidation process (UV AOP).
The document provides a comprehensive cost analysis for various treatment alternatives, with total capital costs ranging from $19.6 million to $33.5 million and annual operations and maintenance costs between $110,000 and $1.09 million. The treatment technologies aim to reduce contaminant concentrations to meet Tucson Water's operational guidelines, with EPA health advisory levels serving as a key reference. The study recommends centralized treatment facilities at three well sites, with conceptual implementation plans spanning four years, including engineering design, construction, and commissioning. The most cost-effective solutions varied by cluster, with GAC and IX technologies showing different economic advantages depending on the specific cluster and contaminant concentrations.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUCSON WATER DEPARTMENT
Impacts of Targeted Emerging Contaminants on Water Supplies and Capital Assets
Technical Memorandum
UPDATES TO NORTHWEST AREA
WELLS ALTERNATIVES EVALUATION
FINAL | August 2022
TUCSON WATER DEPARTMENT
Impacts of Targeted Emerging Contaminants on Water Supplies and Capital Assets
Technical Memorandum
UPDATES TO NORTHWEST AREA WELLS
ALTERNATIVES EVALUATION
FINAL | August ͮͬͮͮ
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | i pw://Carollo/Documents/AZ/Tucson Water/201340-000000/03 Reports and Studies/02 Deliverables/TM NW/TM NW.docx
Contents Technical Memorandum – Updates to Northwest Area Wells Alternatives Evaluation
1.0 Introduction 1
1.1 Report Organization 2
2.0 Water Quality and Infrastructure 2
2.1 EPA Guidance Background and Tucson Potable Water Quality Operational Guidelines 2
2.2 Groundwater Quality Data 4
2.3 Existing Potable Water Infrastructure 6
2.3.1 Age and Condition of Wells 7
3.0 Blending Alternatives 7
4.0 Treatment Technologies 10
4.1 Pretreatment for Solids Removal 10
4.2 GAC Adsorption for PFAS Removal 10
4.3 IX for PFAS Removal 11
4.4 UV AOP for 1,4-dioxane Removal 12
4.5 Treatment Technology Benefits and Challenges 13
4.6 Treatment Alternatives 14
5.0 Evaluation of Alternatives 14
5.1 Conceptual Design Criteria 14
5.2 Simplified Process Schematics 17
5.3 Conceptual Site Layouts 17
5.4 Conceptual Replacement Well and Treatment Cost Opinions 17
5.4.1 Economic Analysis of Cost Opinions 17
6.0 Summary and Conceptual Implementation Plan 20
6.1 Summary 20
6.2 Conceptual Implementation Plan 21
7.0 References 21
Appendices Appendix A Simplified Process Schematics
Appendix B Conceptual SIte Layouts
Appendix C Conceptual Capital and Annual Operations and Maintenance Cost Opinions
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | ii
Tables Table 1 Federal Regulatory Status for PFAS, 1,4-dioxane, and TCE 3
Table 2 Tucson Water PFAS Operational Guidelines for the Potable System(1) 3
Table 3 Ground Water Quality Data 5
Table 4 Existing Potable Water Infrastructure 6
Table 5 Age and Condition of Wells 7
Table 6 Average Concentration of Individual Wells and the Cluster Blends 9
Table 7 Southern Cluster Wells 1,4-dioxane Blending Plan 9
Table 8 Benefits and Challenges of Feasible Treatment Technologies 13
Table 9 Treatment Alternatives Matrix 14
Table 10 Design Capacities 14
Table 11 GAC Adsorption Conceptual Design Criteria 15
Table 12 IX Conceptual Design Criteria 16
Table 13 UV AOP System Conceptual Design Criteria 16
Table 14 Conceptual Centralized Wellhead 1,4-dioxane and PFAS Treatment Cost Opinions 18
Table 15 Conceptual Implementation Plan for Central Well Cluster 22
Table 16 Conceptual Implementation Plan for Southern Well Cluster 22
Figures Figure 1 PFAS Speciation for NW Area Wells Removed from Service 4
Figure 2 1,4-dioxane Concentrations for NW Area Wells Removed from Service 6
Figure 3 NW Area Wells and Cluster 8
Figure 4 Example Pressure GAC Adsorption Pressure Vessels 11
Figure 5 Example IX Pressure Vessels 12
Figure 6 Example LPHO UV Reactors 12
Figure 7 Centralized Wellhead 1,4-dioxane and PFAS Treatment Conceptual Cost Opinion 19
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | iii
Abbreviations AACE Association for the Advancement of Cost Engineering ADWR Arizona Department of Water Resources AFFF aqueous film-forming foams Carollo Carollo Engineers, Inc.
cf cubic feet CMAR Construction Manager at Risk EBCT empty bed contact time
EPA U.S. Environmental Protection Agency GAC granular activated carbon gpm gallons per minute gpm/sq ft gallons per minute per square foot
HA Health Advisory HFPO hexafluoropropylene oxide hp horsepower
IX ion exchange LPHO low pressure high output MCL maximum contaminant level MRL Method Reporting Limit ng/L nanograms per liter NW Northwest O&M operations and maintenance
PFAS perfluoroalkyl PFBS perfluorobutanesulfonic acid PFHpA perfluoroheptanoic acid PFHxA perfluorohexanoic acid
PFHxS perfluorohexanesulfonic acid PFOA perfluorooctanoic acid PFOS perfluorooctane sulfonic acid ppb parts per billion ppm parts per million ppt parts per trillion
SCADA supervisory control and data acquisition SDWA Safe Drinking Water Act TCA trichloroethane TCE Trichloroethene
TM technical memorandum Tucson Water City of Tucson Water Department UV AOP ultraviolet light advanced oxidation process
VOC volatile organic compounds
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 1
Technical Memorandum
UPDATES TO NORTHWEST AREA WELLS
ALTERNATIVES EVALUATION
1.0 Introduction
The City of Tucson Water Department (Tucson Water) supplies water to about 731,000 people over a service area of nearly 400 square miles in the Tucson, Arizona metropolitan area. The utility maintains approximately 200 active production or standby wells and hundreds of monitoring wells used to measure groundwater levels and test groundwater quality.
Groundwater quality monitoring results indicated the presence of 1,4-dioxane and perfluoroalkyl substances (PFAS), particularly perfluorooctane sulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), in wells in the Northwest (NW) area exceeding Safe Drinking Water Act (SDWA) Lifetime Drinking Water Health Advisory (HA) levels published by the U.S. Environmental Protection Agency (EPA). Trichloroethene (TCE), a regulated compound with a maximum contaminant level (MCL), was detected in one of the production wells in NW area.
1,4-dioxane is a synthetic chemical used as a stabilizer for chlorinated solvents (particularly 1,1,1-trichloroethane [TCA]) and is used in products such as paint strippers, greases, and waxes. PFAS are fluorinated organic chemicals, which among consumer product applications, are also part of aqueous film-forming foams (AFFF), that are or were commonly used for suppressing aircraft fires and for training to fight such fires. TCE is used as a solvent for degreasing metals in manufacturing processes, in addition to a variety of consumer applications. EPA's Drinking Water Health Advisory levels are not enforceable standards but are included among the factors EPA considers when setting new or revised SDWA MCLs, which are enforceable standards.
Tucson Water commissioned an evaluation of the potential impacts of targeted emerging contaminants on water supplies and capital assets including developing blending approaches and alternative treatment process technologies to reduce concentrations of PFAS, 1,4-dioxane, and TCE at specific potable production wells. The evaluation includes preliminary engineering information necessary for comparison of the blending and treatment alternatives and for advancing the implementation of groundwater quality improvements as a pro-active public health measure.
Media change-out projections and cost opinions presented in this study were completed prior to the July 7, 2022 update to Tucson Water’s PFAS operational guidelines. For this study, a potable water system operational guideline of < 2 ppt for PFOA+PFOS+PFHxS+PFHpA was considered for cost opinions.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 2
1.1 Report Organization
This technical memorandum (TM) is organized into the following sections and appendices.
• Section 1.0 - Introduction
• Section 2.0 - Water Quality and Infrastructure
• Section 3.0 - Blending Alternatives
• Section 4.0 - Treatment Technologies
• Section 5.0 - Evaluation of Alternatives
• Section 6.0 - Summary and Conceptual Implementation Plan
• Appendix A - Simplified Process Schematics
• Appendix B - Conceptual Site Layouts
• Appendix C - Conceptual Capital and Annual Operations and Maintenance Cost Opinions
2.0 Water Quality and Infrastructure
The following sections present a review of the regulatory background, Tucson's water quality operational guidelines, current water quality, and the existing infrastructure in place for the water systems considered in this study. Due to the age of the wells in the project area, Tucson Water asked Carollo Engineers, Inc.
(Carollo) to investigate which of the project wells are approaching the end of their service lives and may need to be replaced.
2.1 EPA Guidance Background and Tucson Potable Water Quality Operational Guidelines
PFAS are not currently regulated by EPA, but the agency recently updated non-enforceable Lifetime Drinking Water HAs for the following compounds:
• Interim Updated HA of 0.004 parts per trillion (ppt) for PFOA and 0.02 ppt for PFOS.
• Final HA of 2,000 ppt for PFBS and 10 ppt for GenX chemicals.
EPA announced the updates on June 15, 2022, with a notice subsequently published in the Federal Register on June 21, 2022 (87 FR 36848). The updates supersede the earlier 2016 HAs of 70 ppt for PFOA and PFOS.
Although 1,4-dioxane is also not currently regulated by EPA under the SDWA, EPA published Drinking Water HA in 2011 for the chemical (2011 Edition of the Drinking Water Standards and Health Advisories). The corresponding drinking water concentration representing a 1 x 10-6 excess cancer risk level (one in one million) for 1,4-dioxane is 0.35 parts per billion (ppb).
EPA established an MCL of 5 ppb for TCE as part of the Phase I volatile organic compounds (VOC) Rule, promulgated July 7, 1987 (52 FR 25690). The MCL became effective in 1989. Table 1 summarizes the SDWA HAs for PFAS and 1,4-dioxane and the SDWA MCL for TCE.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 3
Table 1 Federal Regulatory Status for PFAS, 1,4-dioxane, and TCE
Parameter SDWA Guidance (HA) or
Regulation (MCL) Units Value
PFOA(1) HA ppt 0.004
PFOS(1) HA ppt 0.02
PFBS(2) HA ppt 2,000
GenX Chemicals(2) HA ppt 10
1,4-dioxane(3) HA ppb 0.35
TCE(4) MCL ppb 5.0 Notes:
(1) EPA's interim updated HAs for PFOA and PFOS (June 15, 2022).
(2) EPA's final HAs for PFBS and GenX chemicals (June 15, 2022).
(3) Based on a 1 x 10-6 excess lifetime cancer risk (2011 Edition of the Drinking Water Standards and Health Advisories).
(4) National Primary Drinking Water Standard.
Abbreviations:
PFOA = perfluorooctanoic acid; PFOS = perfluorooctanesulfonic acid; PFBS = perfluorobutanesulfonic acid GenX = hexafluoropropylene oxide (HFPO) dimer acid and its ammonium salt; TCE = Trichloroethene
MCLs are legally enforceable drinking water standards, while HAs serve as informal technical guidance to assist Federal, state, and local officials, as well as managers of public or community water systems, in protecting health. HAs are not legally enforceable Federal standards and may change if new toxicological assessments from EPA become available. In the absence of enforceable Federal drinking water standards, Tucson Water recently updated its operational guidelines for the potable water system with respect to PFAS, as shown in Table 2. Tucson Water's treatment goals for 1,4-dioxane and TCE are <0.1 and <0.5 ppb, respectively.
Table 2 Tucson Water PFAS Operational Guidelines for the Potable System(1)
Parameter Units Potable Water Quality Operational Guidelines(1)
PFOS ppt <2
PFOA ppt <2
PFHxS ppt 7
PFHpA ppt 7
PFBS ppt 420
PFHxA ppt 200,000
GenX ppt 10 Notes:
(1) Effective July 7, 2022. Tucson Water's previous operational guideline for combined concentrations of PFOS, PFOA, PFHxS, and PFHpA was 18 ppt.
Abbreviations:
PFOA = perfluorooctanoic acid; PFOS = perfluorooctanesulfonic acid; PFHxS = perfluorohexanesulfonic acid;
PFHpA = perfluoroheptanoic acid; PFHxA = perfluorohexanoic acid; PFBS = perfluorobutanesulfonic acid;
GenX = hexafluoropropylene oxide (HFPO) dimer acid and its ammonium salt
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 4
2.2 Groundwater Quality Data
Tucson Water owns several potable production wells in the NW area. During 2018-2019, nine of the wells in this area were taken out of service due to detections of PFAS, 1,4-dioxane, and/or TCE. Table 3 shows the water quality results from the most recent sampling done at these nine production wells.
Figure 1 and Figure 2 show the PFAS speciation and 1,4-dioxane concentrations, respectively, from the most recent sampling event. Wells Y-001B, Y-004A, Z-013A, Z-015A, and A-057B have PFAS concentrations greater than Tucson Water operational guideline of <2 ppt. Wells Y-001B, Y-004A, Z-013A, Z-015A, and Z-005A have 1,4-dioxane concentrations greater than the Tucson Water treatment goal of 0.1 ppb. TCE was found only in Z-002A at a concentration of 2.5 ppb. A detailed summary of all historical PFAS and 1,4-dioxane data is shown in the Northwest Area Wells Alternatives Evaluation Technical Memorandum (Carollo, 2020).
The wells were taken out of service on the following dates:
• Wells Z-002A on March 9, 2016.
• Wells Z-014B and Y-001B on September 22, 2016.
• Wells Z-005A, Z-015A and Z-013A on September 19, 2016.
• Wells A-053A and A-057B on July 18, 2018.
Figure 1 PFAS Speciation for NW Area Wells Removed from Service
Y-001B Y-004A Z-013A Z-014B Z-015A A-053A A-057B Z-002A Z-005A
Co nc en tr at io n (n g/ L)
Well
PFBS
PFHxA
PFHxS
PFHpA
PFOA
PFOS
MRL
Method Reporting Limit (MRL) = 2 ppt
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 5
Table 3 Ground Water Quality Data
Parameter Units Well
Y-001B(1) Well
Y-004A(1) Well
Z-013A(2) Well
Z-014B(3) Well
Z-015A(4) Well
A-053A(5) Well
A-057B(6) Well
Z-002A(7) Well
Z-005A(8)
PFOS(9) ppt 88.1 59 120 <2 80 <2 18 <2 <2
PFOA(9) ppt 18.1 19.6 27 <2 17 <2 <2 <2 <2
PFHxS(9) ppt 59.2 30.9 53 <2 72 <2 11.9 <2 <2
PFHpA(9) ppt 5.7 5.3 6.8 <2 6.2 <2 <2 <2 <2
PFOS + PFOA +
PFHxS + PFHpA(9) ppt 171.1 114.8 206.8 <2 175.2 <2 33.9 <2 <2
PFHxA(9) ppt 10.6 13.8 13 <2 16 <2 <2 <2 <2
PFBS(9) ppt 7 10.8 10 <2 7.8 <2 3.7 <2 <2
1,4-dioxane(10) ppb 0.66 0.98 1.39 <0.1 0.42 <0.1 <0.1 <0.1 0.18
TCE(11) ppb <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 2.5 <0.5 Notes:
(1) Data from sampling conducted on 12/16/2021.
(2) PFAS data from sampling conducted on 07/01/2020 and 1,4-dioxane data from sampling conducted on 12/28/2020.
(3) PFAS data from sampling conducted on 09/23/2020 and 1,4-dioxane data from sampling conducted on 12/28/2020.
(4) PFAS data from sampling conducted on 06/16/2020 and 1,4-dioxane data from sampling conducted on 12/29/2020.
(5) PFAS data from sampling conducted on 10/26/2021 and 1,4-dioxane data from sampling conducted on 12/17/2021.
(6) PFAS data from sampling conducted on 12/16/2021 and 1,4-dioxane data from sampling conducted on 03/12/2020.
(7) Data from sampling conducted on 10/30/2018.
(8) Data from sampling conducted on 01/04/2022.
(9) MRL for PFAS is 2 ppt.
(10) MRL for 1,4-dioxane is 0.1 ppb.
(11) MRL for TCE is 0.5 ppb.
Abbreviations:
PFOA = perfluorooctanoic acid; PFOS = perfluorooctanesulfonic acid; PFHxS = perfluorohexanesulfonic acid; PFHpA = perfluoroheptanaonic aid; PFHxA = perfluorohexanoic acid;
PFBS = perfluorobutanesulfonic acid; TCE = trichloroethene; MRL = Method Reporting Limit; ppt = parts per trillion; ppb = parts per billion
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 6
Figure 2 1,4-dioxane Concentrations for NW Area Wells Removed from Service
2.3 Existing Potable Water Infrastructure
Table 4 summarizes key information for the NW area wells affected by 1,4-dioxane, PFAS, and TCE. Duty cycles are assumed to be 100 percent for the purpose of this study.
Table 4 Existing Potable Water Infrastructure
Well Name Actual Pumping Capacity
(gpm) ADWR Permitted Pumping
Capacity Motor Horsepower
(hp)
Y-001B 740 720 50
Y-004A 935 2000 125
Z-013A 800 800 125
Z-014B 900 900 150
Z-015A 900 900 125
A-053A 243 244 100
A-057B 558 575 100
Z-002A 558 558 50
Z-005A 315 400 75 Abbreviations:
gpm = gallons per minute; ADWR = Arizona Department of Water Resources; hp = horsepower
0.00
0.50
1.00
1.50
Y-001B Y-004A Z-013A Z-014B Z-015A A-053A A-057B Z-002A Z-005A
Co nc en tr at io n (p pb
1,4-Dioxane
MRL
Method Reporting Limit (MRL) = 0.1 ppb
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 7
2.3.1 Age and Condition of Wells
Due to the age of the wells in the project area, Tucson Water asked Carollo to investigate which of the project wells are approaching the end of their service life and may need to be replaced. Table 5 shows the age and condition of the project wells classified as "good", "fair", or "poor" by Tucson Water based upon operations and maintenance experience.
Table 5 Age and Condition of Wells
Well Date Drilled Deepening Date Condition
Y-004A 1982 Fair
Y-001B 2007 Good
Z-013A 1972 1983 Poor
Z-014B 1983 Poor
Z-015A 1974(1) Poor
A-053A 1959 1976 Poor
A-057B 1998 Fair
Z-002A 1952 1975 Poor
Z-005A 1942 1947, 1978 Poor Notes:
(1) Sliplined in 2019.
3.0 Blending Alternatives
These nine wells were grouped into three clusters: Northern (Y-004A and Y-001B), Central (Z-013A, Z-014B and Z-015A), and Southern (A-053A, A-057B, Z-002A and Z-005A) clusters. Figure 3 shows the clustering based upon geographic location of these wells and feasibility of centralized treatment at proposed well sites.
One strategy for meeting water quality operational guidelines is to blend water from alternative groundwater sources with water from the study area's affected wells. Due to the differences in contaminant concentration among different wells of the area and relatively low concentration in the southern cluster wells, blending wells of the same cluster was evaluated. Table 6 shows the concentration of the contaminants (PFAS, 1,4-dioxane, and TCE) in the individual well and the blend of each cluster. The Northern and Central cluster wells don't meet the operational guidelines for PFAS and 1,4-dioxane after blending. The southern cluster wells blended water meets Tucson Water treatment goal for 1,4-dioxane only but not for PFAS, while the TCE concentration is less than EPA's MCL of 5 ppb.
Due to the difference in 1,4-dioxane concentrations among the Southern cluster wells, they must be blended in a specific order to meet the treatment goal for 1,4-dioxane. Table 7 shows the 1,4-dioxane blending plan for the Southern cluster wells. Z-005A must operate with Z-002A, A-057B, Z-002A+A-053A, Z-002A+A-057B, or A-053A+A-057B. Z-005A cannot be operated alone or solely with A-053A.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 8
Figure 3 NW Area Wells and Cluster
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 9
Table 6 Average Concentration of Individual Wells and the Cluster Blends
Cluster Well/Blend Flow
(gpm)
PFOS + PFOA +
PFHxS + PFHpA
(ppt)(1)
1,4-dioxane (ppb)(2)
TCE
(ppb)(3)
Northern
Y-004A 935 114.8 0.98 <0.5
Y-001B 740 171.1 0.66 <0.5
Blend 1,675 139.7 0.84 <0.5
Central
Z-013A 800 206.8 1.39 <0.5
Z-014B 900 <2 <0.1 <0.5
Z-015A 900 175.2 0.42 <0.5
Blend 2,600 124.3 0.48 <0.5
Southern
A-053A 243 <2 <0.1 <0.5
A-057B 558 29.9 <0.1 <0.5
Z-002A 558 <2 <0.1 2.5
Z-005A 400 <2 0.18 <0.5
Blend 1,759 9.5 0.04 0.65 Notes:
(1) MRL for PFAS is 2 ppt.
(2) MRL for 1,4-dioxane is 0.1 ppb.
(3) MRL for TCE is 0.5 ppb.
Abbreviations:
PFOA = perfluorooctanoic acid; PFOS = perfluorooctanesulfonic acid; PFHxS = perfluorohexanesulfonic acid;
PFHpA = perfluoroheptanaonic aid; MRL= Method Reporting Limit; ppt = parts per trillion; ppb = parts per billion
Table 7 Southern Cluster Wells 1,4-dioxane Blending Plan
Operational Scenario
Z-005A(1) gpm (mgd)
Z-002A gpm (mgd)
A-053A gpm (mgd)
A-057B gpm (mgd)
Total Flow gpm (mgd)
Blended 1,4-dioxane
Concentration (ppb)
1 400 -- -- -- 400 0.18
2 400 558 -- -- 958 0.08
3 400 -- 243 -- 643 0.11
4 400 -- -- 558 958 0.08
5 400 558 243 -- 1,201 0.06
6 400 558 -- 558 1,516 0.05
7 400 -- 243 558 1,201 0.06
8 400 558 243 558 1,759 0.04 Notes:
(1) Assumes 1,4-dioxane concentration of 0.18 ppb from most recent 2022 data.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 10
4.0 Treatment Technologies
PFAS and 1,4-dioxane can be treated by several different treatment technologies. The following sections provide an overview and review the benefits and challenges of each treatment technology considered in the study.
4.1 Pretreatment for Solids Removal
Pretreatment removal of solids typically produced by wells is prudent for all groundwater treatment systems to protect downstream process equipment. In the event of a well casing failure, or if sand, gravel, or other sediment are present in the well discharge flow, pretreatment will mitigate potentially damaging effects of sediment. For example, if sediment is deposited in ultraviolet (UV) light advanced oxidation process (AOP) reactor vessels, UV lamp sleeves can begin to foul or potentially break. If sediment gathers on top of granular activated carbon (GAC) media or ion exchange (IX) resin beds, differential pressure across the media will increase, leading to additional backwash requirements. On the other hand, backwashing of IX resin is not recommended, and thus a more robust pretreatment system must be designed.
For the purposes of this evaluation, duplex bag filter units are assumed to be included for the influent stream of all GAC groundwater treatment systems. Automatic backwash strainers and bag filters are assumed for IX treatment systems.
4.2 GAC Adsorption for PFAS Removal
GAC is a porous material with a high volumetric surface area that effectively adsorbs many contaminants, including varieties of PFAS. Carbon life for PFAS removal can vary widely depending on the carbon type, target contaminant concentrations, background water quality, and PFAS carbon chain length. In general, GAC adsorbs longer-chain PFAS (e.g., PFOS and PFOA) better than shorter-chain PFAS (e.g., PFHxA and PFBS).
When UV AOP is used, GAC can also be employed for hydrogen peroxide quenching (i.e., neutralization).
Regardless of use, the GAC media must be replaced with new carbon and sent for off-site disposal or regeneration once active adsorption sites become loaded. The bed life for GAC used just for hydrogen peroxide quenching exceeds that of GAC used to remove PFAS.
GAC adsorption systems require a backwash supply and equalization and settling provisions. That is, carbon particle degradation can occur during this technology's initial loading as well as normal operations, resulting in carbon fines that require periodic backwashing to reduce pressure loss through the contactors.
Backwashing is also required to reverse carbon bed compression, which can occur during normal operations and also as a result of built-up sediment commonly produced by wells, particularly as they age; however, the rate of backwashing required to prevent compression becomes lower after the initial media installation.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 11
This evaluation examined two types of GAC contactors: pressure and gravity. GAC processes either use pressure contactors or gravity contactors to allow water to pass through. Pressure contactors are generally more cost effective for smaller treatment systems, whereas gravity contactors are more cost effective for larger installations.
Figure 4 shows a typical example of a full-scale GAC pressure adsorption lead/lag pressure vessel system installed in southern Arizona.
Figure 4 Example Pressure GAC Adsorption Pressure Vessels
4.3 IX for PFAS Removal
Synthetic IX resins can also be used for PFAS removal. An IX treatment system uses pressure vessels, like GAC pressure contactors but with an IX resin bed installed instead of GAC media. This type of resin provides dual-removal mechanisms of IX and adsorption technology to remove PFAS from groundwater.
The resin's removal capacity diminishes over time with the volume of water treated, after which it must be replaced and sent off-site for disposal. Unlike with GAC, IX regeneration technology for resins used in PFAS treatment is not yet commercially available. Backwashing IX resin beds is not recommended, as disturbing the mass transfer zones can reduce the PFAS removal efficiency. This condition highlights the need for robust pretreatment that removes sediment, a topic that is discussed in Section 4.1.
Figure 5 shows a typical example of full-scale IX vessels in southern Arizona. These vessels are similar to those used in GAC applications, with minor differences in the internals to accommodate and retain different media particle sizes.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 12
Figure 5 Example IX Pressure Vessels
4.4 UV AOP for 1,4-dioxane Removal
UV AOP can be used to destruct specific trace level contaminants in water. Under this form of treatment, UV light and hydrogen peroxide form hydroxyl radicals that oxidize contaminants, including 1,4-dioxane.
All excess hydrogen peroxide that leaves the UV reactors must be quenched to maintain a free chlorine residual in the distribution system, which can be completed using GAC.
This evaluation specifically studied a low-pressure, high-output (LPHO) UV lamp system in series with GAC pressure contactors. LPHO lamps have low UV intensities and are more energy-efficient compared to medium-pressure lamps, resulting in lower power costs. Figure 6 shows an example of LPHO UV AOP reactors.
Figure 6 Example LPHO UV Reactors
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 13
4.5 Treatment Technology Benefits and Challenges
Table 8 summarizes benefits and challenges for each of the PFAS and 1,4-dioxane treatment technologies considered in this study.
Table 8 Benefits and Challenges of Feasible Treatment Technologies
Treatment Technology
Benefits Challenges
GAC Adsorption
• Effective in removing PFAS.
• Well-established technology with multiple sources of media and equipment.
• Mechanically simple and low operations and maintenance (O&M) requirements.
• Lower media unit costs compared to ion exchange resins.
• Relatively low power requirements to overcome additional headloss through contactors.
• Effective in quenching hydrogen peroxide.
• Uncertainty in media replacement frequency can be estimated through testing and may vary over time.
• May be less effective in removing short-chain PFAS according to literature and full-scale operations.
• Backwashing is typically required for removal of carbon fines and to reverse increased pressure losses due to GAC bed compression during normal operation.
Requires backwash supply and spent wash water management.
IX
• Well-established technology with multiple sources of media and equipment.
• Potentially longer media bed life and, consequently, less frequent resin replacement requirements compared to GAC media, depending on site-specific water quality.
• May be more effective for removing selected (i.e., shorter-chain) PFAS compounds.
• Does not require backwash system.
• Uncertainty in media replacement frequency can be estimated through testing and may vary over time.
• Potentially higher headloss through contactors compared to GAC, depending on liquid loading rate and bed depth.
• Robust pre-treatment for sediment removal necessary to protect physical integrity of media and avoid backwash.
• More susceptible to biological fouling of bed compared to GAC, especially for non-continuous operation.
• Higher unit media costs for IX versus GAC might not be offset by longer IX bed life, depending on water quality conditions.
• For PFAS, media generally requires landfill disposal or incineration at appropriately permitted facilities.
• Hydrogen peroxide exposure is detrimental to the resin.
UV AOP
• Well-established technology currently utilized for full-scale 1,4-dioxane treatment.
• Local full-scale facility in operation.
• Primarily automated process operation.
• Peroxide chemical storage/feed system necessary.
• Peroxide does not readily absorb UV light, so the peroxide residual must be quenched for a free chlorine residual to be maintained in the distribution system.
• Hydrogen peroxide scavenges hydroxyl radicals, which impacts the efficacy of the AOP.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 14
4.6 Treatment Alternatives
Carollo identified three well sites as potential locations for PFAS and 1,4-dioxane treatment facilities.
Table 9 summarizes the treatment techniques evaluated at each well site.
Table 9 Treatment Alternatives Matrix
Cluster Combined Treatment Site PFAS Treatment 1,4-dioxane Treatment
Northern Y-001B GAC Pressure Contactors UV-H2O2 AOP
Central Z-013A GAC Pressure Contactors UV-H2O2 AOP
Southern A-057B GAC or IX Pressure Contactors Space Reserved
5.0 Evaluation of Alternatives
The following sections present a review of the recommended treatment alternatives for the NW area production well sites. The following sections include conceptual design criteria, simplified process schematics, conceptual site layouts, and conceptual cost opinions at each cluster.
5.1 Conceptual Design Criteria
All the wells under consideration were grouped to form a cluster based upon geographic location, and each cluster was evaluated for centralized well treatment for removal of the targeted contaminants. Due to the poor condition of some of the project wells shown in Table 5, the cost of adding onsite replacement wells (to match existing flow capacity) at the sites with wells in "poor" condition and treatment facilities were included. Table 10 shows the assumed design capacities which form the fundamental basis of process equipment sizing for alternative treatment systems.
Table 10 Design Capacities
Cluster Units Combined Design Capacity
Northern Cluster at Y-001B gpm (mgd) 1,675 (2.4)
Central Cluster at Z-013A gpm (mgd) 2,600 (3.7)
Southern Cluster at A-057B gpm (mgd) 1,759 (2.5)
Table 11 shows conceptual design criteria assumed for GAC adsorption systems at all three well clusters.
GAC treatment systems would be configured as lead/lag contactors in series to extend the empty bed contact time and overall carbon bed life.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 15
Table 11 GAC Adsorption Conceptual Design Criteria
Parameter Units Northern Cluster at New Site Central Cluster at Well Z-013A
Southern Cluster at Well Z-013A
Configuration - Lead-lag series operation Lead-lag series operation Lead-lag series operation
Number of Treatment Trains No. 2 3 2
Number of Contactors per Train No. 2 2 2
No. of Contactors No. 4 6 4
Vessel Diameter ft 12 12 12
Design Flow gpm (mgd) 1,675 (2.4) 2,600 (3.7) 1,759 (2.5)
Design Flow/Train gpm 838 867 880
Design Liquid Loading Rate gpm/sq ft 7.8 7.7 7.4
Media Size mesh 12 x 40 12 x 40 12 x 40
Carbon Type Re-agglomerated bituminous coal-derived
Re-agglomerated bituminous coal-derived
Re-agglomerated bituminous coal-derived
Dry Weight of Carbon/ Contactor lb 20,000 20,000 20,000
Carbon Bed Depth ft 5.9 5.9 5.9
Empty Bed Contact Time (EBCT) min 5.7 5.8 6.0
Backwash Flow Rate per Contactor @ approx. 30% Bed Expansion gpm 1,244 1,244 1,244
Backwash Equalization Tank Active Volume (minimum for 15 minute backwash) gallons 18,661 18,661 18,661
Backwash Equalization Tank Diameter ft 15.5 15.5 15.5
Abbreviations:
gpm/sq ft = gallons per minute per square foot
Table 12 shows conceptual design criteria assumed for IX treatment as an alternative at the Southern cluster only. Similar to GAC systems, IX treatment systems would also be configured as lead/lag contactors in series to extend the empty bed contact time and overall resin bed life.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 16
Table 12 IX Conceptual Design Criteria
Parameter Units Southern Cluster at Well Z-013A
Configuration - Lead-lag series operation
Number of Treatment Trains No. 2
Number of Contactors per Train No. 2
No. of Contactors No. 4
Vessel Diameter ft 10
Design Flow gpm (mgd) 1,759 (2.5)
Design Flow/Train gpm 880
IX Bed Surface Area/Vessel sq ft 78.5
Design Liquid Loading Rate gpm/sq ft 11.2
Media Type PFAS selective IX resin
Volume of Resin/Vessel cf 336
IX Resin Bed Depth ft 4.3
EBCT min 2.9 Abbreviation:
cf = cubic feet
Table 13 shows the conceptual design criteria for the UV AOP system for 1,4-dioxane removal considered in this study.
Table 13 UV AOP System Conceptual Design Criteria
Parameter Units Northern Cluster at New Site Central Cluster at Well Z-013A
Design Capacity gpm (mgd) 1,675 (2.4) 2,600 (3.7)
Target Contaminant -- 1,4-dioxane 1,4-dioxane
Log Reduction -- 1.25 1.25
Lamp Fouling Factor -- 0.9 0.9
UVT % 97 97
Reactor Model -- TrojanUVFlex™48SL TrojanUVFlex™48SL
Number of Duty Trains -- 1 1
Flow per Train gpm 1,675 2,600
Reactors per Train -- 1 1
Number of Lamps per Train -- 96 96
Lamp Technology -- LPHO LPHO
Flange Connection Size in 24 24
Peroxide Dose ppm 10.7 21.5
Peroxide Concentration % 35% 35%
Peroxide 30-day Storage gallons 1,916 5,957 Abbreviation:
ppm = parts per million
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 17
5.2 Simplified Process Schematics
Simplified process schematics in Appendix A show the treatment strategies considered for the three NW area well site clusters evaluated. The simplified process schematics shows IX contactors as lead/lag vessel systems, GAC contactors as lead/lag vessel systems, and UV AOP in series with GAC contactors as lead/lag vessel systems.
5.3 Conceptual Site Layouts
Appendix B shows example conceptual centralized wellhead treatment layouts for each cluster at different sites: Northern at Y-001B, Central at Z-013A, and Southern at A-057B. The illustrated treatment systems include solids pretreatment using desanders or automatic backwash strainers, bag filters, UV AOP, and GAC or IX contactors based on site-specific requirements. The site layouts also show a backwash waste equalization tank used for settling carbon fines and solids from periodic GAC contactor backwashing. The Southern cluster site layouts have illustrations for both GAC and IX treatment for PFAS removal, and space reserved for a UV AOP building.
The proposed central cluster treatment site (wellsite Z-013A) has limited space for the process equipment;
therefore, Tucson Water may consider the feasibility of acquiring the parcel (owned by Circle K) west of the wellsite.
5.4 Conceptual Replacement Well and Treatment Cost Opinions
Carollo developed conceptual-level capital and annual operations and maintenance cost opinions for the blending and treatment alternatives. The cost opinion tables appear in Appendix C. Tucson Water provided costs for well drilling and equipping in the 2018 Tucson Water technical memorandum Cost Estimate to Replace Potable Production Lost due to PFAS Detections.
The capital cost opinions are expressed in February 2022 dollars (corresponding 20-Cities Average Engineering News Record Construction Cost Index = 12,684). Cost opinions are consistent with Class 4 Estimates as defined by the Association for the Advancement of Cost Engineering (AACE) International. This level of engineering cost estimating is generally made with limited information, including process block diagrams, preliminary equipment lists, and conceptual layouts. Typical accuracy for Class 4 Estimates is expected to be in the range of -30 to +50 percent.
The cost opinions do not include any costs for adding additional Supervisory Control and Data Acquisition (SCADA)/communications equipment. Tucson Water would coordinate alignment of SCADA/communications hardware and software at sites as part of any treatment facility implementation.
5.4.1 Economic Analysis of Cost Opinions
Carollo prepared economic analyses for all treatment alternatives evaluated. These values represent the sum of capital cost opinions and the present worth of annual operations and maintenance cost projections, assuming a discount rate of 4 percent and term of 20 years. The total capital cost is split into its component cost of pipeline-only and treatment-only costs. Table 14 shows the economic analysis for all conceptual-level costs. Figure 7 shows a comparison of capital costs, annual operations and maintenance costs, total present worth, and equivalent annual and unit treatment costs for all treatment alternatives.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 18
Table 14 Conceptual Centralized Wellhead 1,4-dioxane and PFAS Treatment Cost Opinions
Cost Opinions Northern Cluster at
Well Y-001B Site
GAC+UVAOP
Central Cluster at Well Z-013A Site
GAC+UVAOP
Southern Cluster at Well A-057B Site GAC Adsorption
Southern Cluster at Well A-057B Site
Ion-Exchange
Capital - Treatment System
$16,190,000 $28,540,000 $19,740,000 $21,110,000
Capital - Pipeline $3,550,000 $5,220,000 $5,620,000 $5,620,000
Total Capital Cost $19,600,000 $33,520,000 $25,080,000 $26,480,000
Annual O&M Cost(1) $740,000 $1,090,000 $120,000 $130,000
Present Worth of Capital Cost
Present Worth of Annual O&M(1,2)
$10,057,000 $14,813,000 $1,631,000 $1,767,000
Total Present Worth(1,2) $29,660,000 $48,330,000 $26,710,000 $28,250,000
Equivalent Annual and Unit Treatment Cost
Annualized Capital Cost(1,2)
$1,442,000 $2,467,000 $1,846,000 $1,949,000
Total Equivalent Annual Cost(1,2)
$2,182,000 $3,557,000 $1,966,000 $2,079,000
Cost per 1,000 Gallons Treated(1,2)
$2.48 $2.60 $2.13 $2.25
Notes:
(1) Media changeout frequencies and the corresponding costs represent 2 ppt for PFOA+PFOS+PFHxS+PFHpA.
(2) Assuming a discount rate of 4 percent annually and a term of 20 years.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 19
Figure 7 Centralized Wellhead 1,4-dioxane and PFAS Treatment Conceptual Cost Opinion
$20
$34
$25 $26
$0.7 $1.1 $0.1 $0.1
$30
$48
$27 $28
$0
$10
$20
$30
$40
$50
$60
Northern Cluster
UV AOP + GAC
Central Cluster
UV AOP + GAC
Southern Cluster
GAC
Southern Cluster
IX
Co st
M ill io ns
Capital Cost Annual O&M Present Worth
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 20
6.0 Summary and Conceptual Implementation Plan
6.1 Summary
This section summarizes the finding of this TM and a conceptual implementation plan.
1. EPA published an Updated Lifetime Drinking Water HAs for the following PFAS compounds on June 15, 2022:
a. Interim Updated HA of 0.004 ppt for PFOA and 0.02 ppt for PFOS.
b. Final HA of 2,000 ppt for PFBS and 10 ppt for GenX chemicals.
The SDWA HA for 1,4-dioxane is 0.35 ppb based on a 1x10-6 excess lifetime cancer risk. The SDWA enforceable MCL for TCE is 5 µg/L. While Drinking Water Health Advisories are not enforceable standards, they represent EPA's recommendations for public water systems and will be taken under consideration in any forthcoming EPA rulemaking that may result in enforceable MCLs.
2. Tucson Water removed nine wells in the NW area from service due to detections of PFAS, 1,4-dioxane, and/or TCE. All the wells with PFAS detections have been taken out of service:
a. Wells Z-002A on March 9, 2016,
b. Wells Z-014B and Y-001B on September 22, 2016,
c. Wells Z-005A, Z-015A and Z-013A on September 19, 2016,
d. Wells A-053A and A-057B on July 18, 2018.
3. Wells Y-004A, Y-001B, Z-013A, Z-014B, Z-015A, A-053A, A-057B, and Z-005A would require water quality improvements to meet Tucson Water's potable water system operational guidelines for PFAS and/or 1-4 dioxane and to address detectable levels of TCE produced by Well Z-002A.
4. The nine wells were grouped into three clusters for centralized well treatment:
a. Northern: Wells Y-004A and Y-001B.
b. Central: Wells Z-013A, Z-014B and Z-015A.
c. Southern: Wells A-053A, A-057B, Z-002A and Z-005A.
The clustering was based upon geographic location of these wells and feasibility of centralized well treatment.
5. The southern cluster wells can meet Tucson Water operation guidelines for 1,4-dioxane by blending but not for PFAS, while the Northern and Central cluster wells do not meet operational guidelines for both PFAS and 1,4-dioxane after blending.
6. Effective treatment technologies are available to reduce PFAS and 1,4-dioxane concentrations to reliably meet Tucson Water's operational guidelines and to reduce TCE concentrations to less than reportable levels. UV AOP and GAC or IX are well-established and demonstrated for municipal water treatment.
7. Centralized well treatment for each cluster was evaluated at different sites:
a. Northern at Y-001B.
b. Central at Z-013A.
c. Southern at A-057B.
All three well sites studied can accommodate the full range of treatment facility alternatives evaluated in this study.
8. Wells Z-013A, Z-014B, Z-015A, A-053A, Z-002A and Z-005A are on the order of 20-80 years old and in poor condition, indicating the need for replacement wells to re-activate sustained pumping activities at the sites. Replacement wells would have the same design capacity as the current wells.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 21
6.2 Conceptual Implementation Plan
Conceptual implementation plans were developed for advancing groundwater treatment capital projects for the Central and Southern well clusters, as shown in Table 15 and Table 16, respectively. An implementation plan for the northern cluster was not developed since Tucson Water can pump water into that zone from lower zones. Capital cost opinions for the Central and Southern well clusters were projected over four year periods covering design, construction, and commissioning phases:
• Engineering design during Year 1.
• Construction between Year 2 and Year 4.
- Construction Manager at Risk (CMAR) project delivery method.
• Resident engineering and construction administration during construction years.
7.0 References
Carollo Engineers, Inc. Impacts of Targeted Emerging Contaminants on Water Supplies and Capital Assets:
Technical Memorandum: Northwest Area Wells Alternatives Evaluation. December 2020.
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | 22
Table 15 Conceptual Implementation Plan for Central Well Cluster
Table 16 Conceptual Implementation Plan for Southern Well Cluster
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022
Appendix A
SIMPLIFIED PROCESS SCHEMATICS
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | A-1
Figure A.1 GAC Adsorption Process Flow Diagram
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | A-2
Figure A.2 Ion Exchange Process Flow Diagram
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
FINAL | AUGUST 2022 | A-3
Figure A.3 UV AOP and GAC Process Flow Diagram
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
Appendix B
CONCEPTUAL SITE LAYOUTS
Legend
50.00
PimaMaps Print
Notes:
100.0
Feet
This map is static output from an internet mapping site and no warranty is expressed or implied as to the accuracy, reliability, currency or completeness of the data, and is for reference only 2/4/2022
Parcels
UVAOP
TREATMENT
BUILDING
RELOCATE
BAG FILT
ER
22,000 GAL
BACKWASH TANK
(Dia = 16 ft)
(H = 15 ft)
BACKWASH W
ASTE TO SANITARY SEWER
EXISTING GATE
TREATED W
ATER
HYDRO
TANK
DRAFT
NORTHERN CLUSTER - CENTRALIZED TREATMENT AT Y-001B (UV AOP + GAC LEAD/LAG)
NEW GATE
SANITARY SEWER
BACKWASH SUPPLY
PURGE TANK
PROPERTY BOUNDARY
a Parcels
GAC Pressure Contactor Footprint
UVAOP Building
Bag Filter Footprint
Desanders
GAC Backwash Tank
Purge Tank
New Raw Water Pipeline
GAC Contacted Water
GAC Backwash Supply
GAC Backwash Waste
Backwash Recycle
New Gate
New Pavement
12-FT DIAMETER GAC
CONTACTOR (6
TO DISTRIBUTIO
N SYSTEM
POTABLE W
ATER LINE
FROM W
ELL
SITE
Y-00 4A
DESANDER
VIRTUAL PUMP LAYDOWN AREA
(30ft x 8ft)
03/30/2022August 2022
This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map are subject to Pima County's ITD GIS disclaimer and use restrictions.
Notes:
Legend
2550 0
Feet 12/2019
PURGE TANK
EXISTING WELL PUMP
TREATED WATER
PROPERTY BOUNDARY and PROPOSED NEW
FENCE
TO DISTRIBUTION SYSTEM
UVAOP TREATMENT BUILDING
BAG FILTERSDESANDERS
12-FT DIAMETER GAC CONTACTOR (6)
EXISTING FENCE
FROM WELL SITES Z-014B &Z-015A
22,000 GAL BACKWASH TANK
(Dia = 16 ft) (H = 15 ft)
BACKWASH RECYCLE PUMPS
BACKWASH RECYCLE
EXISTING GATE
EXISTING GATE NEW GATE
CENTRAL CLUSTER - CENTRALIZED TREATMENT AT Z-013A (UV AOP + GAC LEAD/LAG) Parcels
GAC Pressure Contactor Footprint
UVAOP
Building
Bag Filter Footprint
Desanders
GAC Backwash Tank
Purge Tank
New Raw Water Pipeline
GAC Contacted Water
GAC Backwash Supply
GAC Backwash Waste
Backwash Recycle
Existing Distribution System
New Gate
INA RD
POTENTIAL WELL REDRILL LOCATION
DRAFT
NEW DRIVEWAYW Camino de las Capas H
YD
R
O P
N
EU
M
AT
IC
TA
N K
CIRCLE K PARCEL
TUCSON WATER PARCEL 2
BACKWASH WASTE TO SANITARY SEWER
BACKWASH SUPPLY
POTABLE WATER LINE
TUCSON WATER PARCEL 1
VIRTUAL PUMP LAYDOWN AREA
(30ft x 8ft)
10' X 73' TR
AILER
+ TR
U
C K
County's ITD GIS disclaimer and use restrictions.
Notes:
Legend
25.0050.0 0
Feet 12/3/2019
Parcelse
EXISTING WALL
BAG FILTER
DESANDER
EXISTING
WELL PUMP
EXISTING GATE
22,000 GAL BACKWASH TANK
(Dia = 16 ft) (H = 15 ft)
TO DISTRIBUTION SYSTEM
BACKWASH SUPPLY
BACKWASH WASTE
TO SANITARY SEWER
12' GAC CONTACTOR
(TYP OF 4)
West River Road
HYDRO PNEUMATIC
TANK
TREATED WATER
FROM WELL SITES Z-005A
& Z-002A
FROM WELL SITE
A-053A
NEW WALK-IN GATE
DRAFT
PROPERTY BOUNDARY
TUCSON WATER PARCEL
PIMA COUNTY PARCEL
SA
N
IT
AR
Y
SE
W
ER
GALERIA DEL RIO PARCEL
PURGE TANK
Parcels
GAC Pressure Contactor Footprint
Bag Filter Footprint
Desanders
GAC Backwash Tank
Purge Tank
New Raw Water Pipeline
GAC Contacted Water
GAC Backwash Supply
GAC Backwash Waste
Backwash Recycle
New Gate
New Pavement
NEW SLIDING GATE
ASPHALT
PAVEMENT
BACKWASH RECYCLE PUMPS
PO
TA
BL
E
W
AT
ER
L
IN
E
SOUTHERN CLUSTER - CENTRALIZED TREATMENT AT A-057 (GAC LEAD/LAG )
RELOCATED WALL
SPACE RESERVED FOR
UVAOP BUILDING
BACKWASH RECYCLE
VIRTUAL PUMP
LAYDOWN AREA
(30ft x 8ft)
County's ITD GIS disclaimer and use restrictions.
Notes:
Legend
25.0050.0 0
Feet 12/3/2019
Parcels
EXISTING WALL
EXISTING
WELL PUMP
EXISTING GATE
TO DISTRIBUTION SYSTEM
10' IX CONTACTOR
(TYP OF 4)
West River Road
HYDRO PNEUMATIC
TANK
TREATED WATER
FROM WELL SITES Z-005A
& Z-002A
FROM WELL SITE
A-053A
DRAFT
PROPERTY BOUNDARY
TUCSON WATER PARCEL
PIMA COUNTY PARCEL
GALERIA DEL RIO PARCEL
BAG FILTER
BACKWASH RECYCLE PUMPS
NEW SLIDING GATE
ASPHALT
PAVEMENT
SA
N
IT
AR
Y
SE
W
ER
e Parcels
IX Pressure Contactor Footprint
Bag Filter Footprint
Automatic Backwash Filter
Backwash Tank
Purge Tank
New Raw Water Pipeline
IX Contacted Water
Backwash Supply
Backwash Recycle
New Gate
New Pavement
SOUTHERN CLUSTER - CENTRALIZED TREATMENT AT A-057 (IX LEAD/LAG)
NEW WALK-IN GATE
PO
TA
BL
E
W
AT
ER
L
IN
E
RELOCATED WALL
BACKWASH RECYCLE
SPACE RESERVED FOR
UVAOP BUILDING
AUTOMATIC BACKWASH
FILTRATION SYSTEM
12,000 GAL BACKWASH TANK
(Length = 50 ft) (Width = 8 ft)
VIRTUAL PUMP
LAYDOWN AREA
(30ft x 8ft)
NORTHWEST AREA WELLS ALTERNATIVES EVALUATION | IMPACTS OF TARGETED EMERGING CONTAMINANTS | TUCSON WATER
Appendix C
CONCEPTUAL CAPITAL AND ANNUAL OPERATIONS
AND MAINTENANCE COST OPINIONS
Northwest Area Wells Alternatives Evaluation Update PFAS and 1,4-dioxane Treatment Only
Conceptual Cost Opinions
03/30/2022
Northern Cluster Central Cluster Well Y-001B
UV AOP + GAC
Well Z-013A
UV AOP + GAC
Well A-057B
GAC
Well A-057B
IX
Wells: Y-001B, Y-004A Wells: Z-013A, Z-014B, Z-015A
Wells: Z-005A, Z-002A, A-057B, A-053A
Wells: Z-005A, Z-002A, A-057B, A-053A
CAPITAL COST1
DIRECT COST2
Site Work3 25% $602,000 $747,000 $387,000 $448,000 Yard Piping and Valves4 45% $1,407,000 $1,745,000 $904,000 $1,045,000 Foundation $131,000 $108,000 $131,000 $108,000 UV AOP Building $659,000 $659,000 Pump Replacement $132,000 $132,000 $132,000 $132,000 Onsite Well Drilling5,6 $2,680,000 $3,160,000 $3,160,000 Onsite Well Equipping5 $1,337,000 $1,337,000 $1,337,000 New Source Sampling5 $5,000 $5,000 $5,000
Process Equipment
UVAOP $915,000 $915,000
GAC
Contactors $929,000 $1,394,000 $929,000 Media $114,000 $172,000 $114,000
Anion Exchange Contactors $869,000 Media $390,000
Backwash Tank $90,000 $90,000 $90,000 $61,000 Backwash Return Pump $14,000 $14,000 $14,000 $14,000 Desanders $87,000 $142,000 $142,000 Automatic Backwash Filtration System $197,000 Bag Filters $259,000 $259,000 $259,000 $259,000
Installation3 30% $718,000 $892,000 $460,200 $533,000 Electrical4 25% $782,000 $970,000 $502,000 $581,000 I&C4 10% $313,000 $388,000 $201,000 $232,000
SUBTOTAL DIRECT COST $7,150,000 $12,650,000 $8,770,000 $9,370,000
Contingency7 30% $2,145,000 $3,795,000 $2,631,000 $2,811,000
TOTAL DIRECT COST $9,295,000 $16,445,000 $11,401,000 $12,180,000
INDIRECT COST
General Conditions, Overhead, Profit & Risk8 22% $2,045,000 $3,618,000 $2,508,000 $2,680,000 Bonds and Insurance8 3% $279,000 $493,000 $342,000 $365,000 Tax (65% of 8.7% Tucson Rate)8 6% $136,000 $169,000 $88,000 $101,000
TOTAL INDIRECT COST $2,460,000 $4,280,000 $2,940,000 $3,150,000
TOTAL CONSTRUCTION COST $11,760,000 $20,730,000 $14,340,000 $15,330,000
Engineering, Administration, and Legal9 25% $2,940,000 $5,183,000 $3,585,000 $3,833,000 Escalation9 13% $1,489,000 $2,626,000 $1,816,000 $1,942,000
TOTAL CAPITAL COST $16,190,000 $28,540,000 $19,740,000 $21,110,000
Hydrogen Peroxide (35%) $80,000 $250,000 Media Changeout Frequency for 18 ppt PFAS breakthrough (years)10,13 0.3 0.4 Media Changeout Frequency for 70 ppt PFAS breakthrough (years)11,14 0.6 0.6 Media Changeout Frequency for 2 ppt PFAS breakthrough (years)12 0.3 0.3 4.2 9.6 Media Changeout (including spent media management)10,13 $334,000 $461,000 $24,000 $12,000 Media Changeout Lower Bound (including spent…