North Wastewater Treatment Plant West Section Roof Replacement

Closed State & local contract opportunity Posted

Solicitation number
2026 10
State
Kansas
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Dodge City, Kansas is requesting proposals for roof replacement at the North Wastewater Treatment Plant West section, with sealed bids due October 14, 2026 at 2:00 p.m. to the Director of Finance at 100 Chaffin Road.

The scope requires removal of the existing damaged roof system including decking, coping, scuppers, and downspouts; installation of a minimum 3-inch roofing insulation board; installation of a fully adhered 60 mil TPO roofing system; and installation of new decking, coping, and downspouts. The contractor must maintain a clean and safe job site throughout construction and use magnetic sweeping equipment to collect loose nails and metal debris from surrounding paved and landscaped areas. All dump fees and removal costs are the contractor's responsibility. If existing insulation is in good condition and reusable, the bid must be adjusted to reflect reduced material and labor costs. The contractor must participate in one preconstruction meeting with the City and any subcontractors.

The contractor must provide a minimum two-year workmanship warranty and a manufacturer's twenty-year Total System No Dollar Limit warranty with a standard 90 MPH wind rating. Proof of workers' compensation and liability insurance with minimum coverage of $1 million for death or injury and $500,000 for property damage is required. A performance bond may be required for the winning bidder in accordance with City policy.

Project completion is due February 20, 2027. Liquidated damages of $1,000 per day apply for failure to meet the completion deadline. Bidders are strongly encouraged to conduct site visits. The facility is located at 4120 North 14th Avenue. Kevin Israel, Director of Construction and Facilities, is the primary point of contact for RFP inquiries.

Opportunity text

Scope of Work: Contractor to replace the damaged West section of the North Wastewater treatment plant. 1. The Contractor must remove the existing roof system including any decking, coping, scuppers, downspouts, that is damaged beyond repair. 2. The Contractor is responsible for all dump fees and costs for removal. 3. The Contractor must install a minimum of 3 roofing insulation board over the decking. 4. The Contractor must install a fully adhered 60 mil TPO roofing system. 5. The Contractor must install new decking, coping, downspouts etc. that were removed in earlier stages. 6. The Contractor is required to engage in one preconstruction meeting with the City of Dodge City and any subcontractors involved. 7. If the current insulation is in good shape and can be reused the bid must be altered to show the reduction in material and labor costs. The Contractor shall maintain a clean and safe job site throughout construction. Upon completion, all roofing debris, fasteners, scrap materials, and waste shall be removed from the project site. The Contractor shall use magnetic sweeping equipment to collect loose nails and metal debris from surrounding paved and landscaped areas.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors