Natural gas system improvement 4
Awarded State & local contract opportunity Posted
- Solicitation number
- C-4-23
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 05572 Propane/Butane Or Natural Gas Conversion Equipment
- 40513 Gas, Natural (Incl. Compressed Natural Gas (Cng))
- 55685 Trolley, Transit, Rubber Tired (Compressed Natural Gas)
- 72019 Compressors, Compressed Natural Gas (Cng)
- 72033 Gasoline, Compressed Natural Gas (Cng), Liquefied Petroleum Gas (Lpg), And Diesel Fuel Pumps, Service Station Type
- UNSPSC codes
- 27112916 Liquid fuel dispenser or gasoline pump
- 72153301 Gasoline pump installation service
- 12181602 Natural oils
- 15111511 Liquefied natural gas LNG
- 15111512 Compressed natural gas CNG
- 72153300 Service station equipment installation and maintenance services
- 40141615 Flap valves
- 40141616 Valve parts or accessories
- 40141731 Nozzles
- 40141743 Nozzle tips or caps
- Point of contact
-
- Jack Sapp jrsapp@sappengineering.com (478) 342-0386
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Claxton, Georgia is requesting sealed bids for natural gas system improvement work on approximately 6,350 feet of existing 4-inch high-pressure gas main relocation from Highway 280 at New Frontage Road to Highway 280 at Olive Branch Road, with bids due April 5, 2023 at 1:00 p.m.
The scope includes furnishing materials (other than line pipe and meter sets), labor, tools, equipment, and incidentals for construction and installation of the relocated gas main. Bids are to be received at the City of Claxton offices, 206 W Railroad Street, Claxton, Georgia 30417.
The awarded contractor is Equix. No contract value, contract term, evaluation criteria, or pre-bid meeting information is specified in the available documentation.
Opportunity text
Sealed bids will be received by the City of Claxton at 206 W Railroad St. Claxton, Ga 30417 until: 1:00 pm, April 5, 2023 for the furnishing of material (other than line pipe and meter sets), labor, tools, skill, equipment and incidentals for the construction and installation of: The project will include relocating approximately 6,350 feet of the existing 4" HP gas main from Hwy 280 at New Frontage Rd to Hwy 280 at Olive Branch Rd.