The Mystic & Noank Library is requesting sealed bids for the Landscape Master Plan Phase 1 project under an ITB with bids due October 2, 2026 at 2:00 p.m. EDT at 40 Library Street, Mystic, Connecticut. The project is state-funded in part by $250,000 under the Connecticut State Library Grant Program for Public Library Construction, triggering mandatory subcontractor set-asides of 25% for DAS-certified Small Businesses and 6.25% for Minority-, Women-, and/or Disabled-owned Businesses, demonstrated through a Good Faith Short Form Plan.
The scope encompasses site clearing, grubbing, selective demolition, erosion and sediment control installation and maintenance, site lighting, underground electrical conduits and stormwater infrastructure (catch basins, area drains, and piping), asphalt paving, precast concrete curbing, exposed aggregate concrete sidewalks, concrete and stone stairs, dry laid stone walls, metal handrails, and native tree, shrub, and perennial plantings totaling 14,033 square feet. Work must comply with Connecticut Building Code 2022, International Building Codes 2021, Connecticut Stormwater Quality Manual, and ADA accessibility standards. A critical requirement is maintaining at least one ADA-compliant walkway providing continuous access from the public right-of-way to the library main entry throughout construction without exception. Contractors must contact CT Call Before You Dig prior to excavation and implement mandatory tree protection measures supervised by the landscape architect during work in critical root zones.
The contract completion date is October 30, 2027. Bidders must submit a 5% bid bond and 100% performance bond, proof of Connecticut contractor license, AIA Document A305 (Contractor's Qualification Statement), three project references from the past five years, insurance certificates, and evidence of OSHA 10-hour safety training compliance. An optional pre-bid conference is scheduled for September 3, 2026 at 9:00 a.m. on-site. Vendor questions are due by 2:00 p.m. on September 10, 2026, with responses published as an addendum on September 17, 2026. Contact Christine Bradley at 860-536-7721 or cbradley@mysticnoanklibrary.org.
Opportunity text
The Mystic & Noank Library Landscape Master Plan Phase 1 work consists of: Installation and maintenance of construction entrance and erosion and sediment controls, clearing and grubbing, selective demolition, site lighting; underground conduits and sleeves, catch basin top, area drain & stormwater piping; asphalt paving; precast concrete curbing; exposed aggregate concrete sidewalks; concrete stairs, stone stairs on concrete; dry laid stone walls; metal handrails; native tree; shrub and perennial plantings; as shown and described in the contract documents.