MRF Stormwater Treatment System
Closed State & local contract opportunity
- Solicitation number
- RFP No. PW-0175
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 47101502 Ammonia removal equipment
- 47101528 Water treatment dryers
- 47101541 Ozone water treatment equipment
- 47101545 Rotating biological contactor RBC
- 47101548 Filter control console
- 47101553 Fiber filter
- 47101560 Filter underdrain equipment
- 47101570 Oxidation ditch
- 47101573 Flocculator
- 47101574 Sequencing batch reactor
Show all 43
- 47101564 Waste crusher
- 47101562 Drum screen
- 47101543 Surface aerator
- 47101569 Wastewater plane screen
- 47101547 Surface washing device
- 47101572 Disc screen
- 20142600 Production control system instrumentation
- 47101517 Ultraviolet wastewater disinfection equipment
- 47101522 Packaged water treatment systems
- 47101525 Dewatering equipment
- 47101540 Chemical feeder
- 47101542 Air flotation equipment
- 47101550 Compression filter
- 47101551 Up flow filter
- 47101552 Moving bed filter
- 47101554 Jar tester
- 47101555 Baffle wall
- 47101557 Inclined plate settler
- 47101558 Foam breaker
- 47101559 Scum removal equipment
- 47101561 Adulteration treatment equipment
- 47101566 Multiple media filter
- 47101571 Chlorine gas neutralization unit
- 47101577 Flow arrangement wall
- 47101504 Bacterial removal equipment
- 47101510 Iron removal equipment
- 47101523 Collection tanks
- 47101546 Grit removal system
- 47101549 Gravity filter
- 47101563 Wastewater coalescer
- 47101556 Water trough
- 47101565 Waste gas burner
- 47101567 Electrodialysis machine
- Point of contact
-
- Leo Vargas Vasquez lvargasvasquez@santacruzca.gov (831) 420-5428
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Santa Cruz Public Works Department is seeking proposals for a Temporary Stormwater Treatment System Rental for its Resource Recovery Facility, located in Santa Cruz County and San Francisco City, California. The procurement involves renting a comprehensive stormwater treatment system designed to treat 400 gallons per minute through polymer injection, settling, and sand filtration to meet Industrial General Permit (IGP) effluent limits. The project requires a five-month rental period, with a project completion deadline of November 15, 2024. Proposers must demonstrate at least five years of experience in stormwater treatment systems and comply with prevailing wage requirements. The evaluation process will be conducted in two phases, with a total possible score of 100 points, assessing adherence to RFP requirements (5%), firm and team qualifications (20%), treatment system design and work schedule (30%), cost proposal (30%), and training and technical support (15%). Key proposal dates include a non-mandatory pre-proposal meeting on September 17, 2024, with final proposals due by September 25, 2024, at 5:00 pm.
While no specific set-aside designations or restrictions for disadvantaged enterprises are explicitly mentioned in the documents, the RFP requires comprehensive documentation and qualifications from potential contractors. The proposed treatment system will include two 20,000-gallon Baker tanks, sand filters, a generator and fuel cell, industrial controllers, and a polymer injection system, with a project staging area of approximately 25' x 150'. The Schedule of Values document indicates a flexible pricing structure with a 30-day billing cycle and a 10% contingency built into the total pricing. Although an exact budget range is not specified, the comprehensive cost proposal will cover design, construction, and operational services, including labor, equipment, materials, permits, taxes, and professional services. The contractor will be responsible for complete system mobilization, setup, and demobilization within ten working days after receiving the Notice to Proceed, with all work to be completed by the specified project deadline.
Opportunity text
Rental of a treatment system to treat stormwater from the Resource Recovery Facility recycling yard and parking lot. The system will be designed to treat and operate at 400 gallons per minute (GPM) by method of polymer injection, settling, and sand filtration to achieve effluent limits stated in the Industrial General Permit (IGP). The rental period shall be for five (5) months.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity