Madonna Creek Dam Repair Project
Closed State & local contract opportunity Posted
- Solicitation number
- RFB-0000000026
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC code
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Midpeninsula Regional Open Space District is seeking bids for the Madonna Creek Dam Repair Project, a critical infrastructure restoration initiative located in San Mateo County, California. The project requires a Class A Contractor to repair and stabilize the embankment immediately downslope of the lower dam, which sustained significant damage during the 2022/2023 winter storms due to a clogged spillway and subsequent overtopping. Key deliverables include restoring the eroded slope to its original grade using engineered fill, rock slope protection, and native vegetation, with specific environmental compliance requirements outlined in detailed supplemental conditions. Mandatory pre-bid site visits are scheduled for May 14 and May 21, 2025, with a bid opening on June 10, 2025, at 11:00 AM at the District's Administrative Office in Los Altos. The project timeline includes a contract award on July 9, 2025, on-site activities commencing on August 18, 2025, and work completion targeted for October 31, 2025. Contractors must adhere to extensive environmental protection protocols, including pre-construction biological surveys, compliance with Open Space Maintenance Program Best Management Practices, and specific environmental monitoring requirements.
The procurement does not explicitly indicate specific set-aside designations for disadvantaged enterprises. The estimated construction cost is $247,589, and the contract will be funded in whole or in part by federal funds, potentially including FEMA assistance. Bidders must comply with complex federal funding guidelines, including Davis-Bacon Act prevailing wage rates, Buy America preferences, and various procurement regulations. Specific qualifications include a Class A Contractor License and adherence to multiple federal requirements such as equal opportunity provisions, clean air and water standards, and anti-lobbying restrictions. The project involves working in environmentally sensitive areas, specifically the Miramontes Ridge Preserve, with critical habitat considerations for species like the California red-legged frog. Contractors will need to demonstrate significant environmental management capabilities, including phytosanitation protocols to prevent Phytophthora contamination and comprehensive waste diversion strategies. Additional requirements include submitting Labor and Materials Payment Bond, Performance Bond, Proof of Insurance, and a signed Agreement by July 25, 2025.
Opportunity text
The Midpeninsula Regional Open Space (District) is pleased to announce the opportunity to bid on the Madonna Creek Dam Repair Project (Project). The Project consits of repairing and stabilizing the embankment immediately downslope of the lower dam. The downslope face of the earthen dam sustained damages during the winter storms of 2022/2023 due to a clogged spillway that led to the overtopping of earthen dam. Much of the existing slope has eroded due to the overtopping of the earthen dam as well as undercutting at the base of the erosional feature due to seepage through the earthen dam. The erosional feature is planned to be restored to its original grade using engineered fill, rock slope protection, and native vegetation. RFB, Contract Award, and Project Schedule The following is a tentative schedule and is subject to change. 5/5/25: Requests for Bids issued 5/13/25: RSVP deadline for mandatory pre-bid tour by 4 PM 5/20/25: RSVP deadline for mandatory pre-bid tour by 4 PM 5/29/25: Deadline for Bidders to pose questions 6/3/25: Addendum issued to answer all questions 6/10/25: Bid Opening, 11:00 AM 5050 El Camino Real, Los Altos, CA 94022 7/9/25 Award of Contract by District Board of Directors Regular Meeting, begins at 7:00 PM 7/25/25: Pre-construction meeting and deadline to submit Labor and Materials Payment Bond, Performance Bond, Proof of Insurance, and signed Agreement 8/6/25: Written Notice to Proceed issued by District 8/18/25: On-site activities may commence 10/31/25 Work on-site complete November 2025 Project Close Out The Bid Opening will be held at the District's Administrative Office on June 10, 2025 at 11:00 AM. The Administrative Office is located at 5050 El Camino Real, Los Altos, CA 94022
Files
| File | Type | Posted |
|---|---|---|
| 23-084~1.PDF | ||
| Att A-OSMRP ISMND.pdf | ||
| Att D-Phytophthora BMPs.pdf | ||
| Att E-Project OSMRP.pdf | ||
| Att F- C_DWD Policy.pdf | ||
| Att C-SMC LoD.pdf | ||
| Att H- Davis Bacon Wage.pdf | ||
| Madonna Dam Bid Package.pdf | ||
| Madonna Getoech Report 6-30-22.pdf | ||
| Att G-Covered SMC Act.pdf | ||
| Project Access Map.pdf | ||
| Site Photos.pdf | ||
| Supplemental Conditions.pdf | ||
| Att B-OSMRP BMPs.pdf | ||
| Project Site Map.pdf |
Show all 15
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity