Att E-Project OSMRP.pdf

PDF 1 MB Posted

Attached to
Madonna Creek Dam Repair Project
Solicitation number
RFB-0000000026
Issued by
San Mateo County, Hayward City, California

About this file

The document is a Project Notification Sheet for the Open Space Maintenance and Restoration Program (OSMRP) by the Midpeninsula Regional Open Space District, specifically for the Berm Repair Project at Madonna Creek Dam. The project involves repairing a 2,000 square foot erosional feature on an earthen berm, with work to commence between September 1, 2023, and September 30, 2024. The proposed activities include excavating unsuitable soils, grading a tiered keyway, installing a curtain drain, backfilling with clay-rich material, and adding various layers of permeable material and gravel. The site is located in the Miramontes Ridge Preserve, with coordinates at latitude 37.474031 and longitude -122.409020.

The project has significant environmental considerations, particularly concerning the California red-legged frog (CRLF) habitat. The pond functions as a breeding habitat within federally designated critical habitat, and the work is designed to maintain and preserve this ecosystem. Biological monitoring is required, with a permissible work window from May 15 to October 31. The project has been classified as a Tier 2B activity, with potential impacts on migratory birds and San Francisco dusky-footed woodrats. Cultural resource surveys have been completed, and the site is considered to have low to moderate sensitivity due to previous disturbances. Erosion control and revegetation requirements will be implemented using specific Best Management Practices (BMPs).

View the file

Other files

File Type Posted
Supplemental Conditions.pdf PDF
23-084~1.PDF PDF
Att F- C_DWD Policy.pdf PDF
Madonna Getoech Report 6-30-22.pdf PDF
Att D-Phytophthora BMPs.pdf PDF
Madonna Dam Bid Package.pdf PDF
Att B-OSMRP BMPs.pdf PDF
Project Site Map.pdf PDF
Att H- Davis Bacon Wage.pdf PDF
Att C-SMC LoD.pdf PDF
Att A-OSMRP ISMND.pdf PDF
Project Access Map.pdf PDF
Att G-Covered SMC Act.pdf PDF
Site Photos.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Open Space Maintenance and Restoration Program

Project Notification Sheet

Calendar Year 2024 – Maintenance Entry Form

Project Name: Berm Repair Project Manager: Beckman, Craig

Cityworks Work Order: 5006 Asset ID Number(s): INOUT00199

Activity Description(s): Berm Repair

Workgroup: Engineering and Construction Preserve: Miramontes Ridge

Location/Address: Madonna Creek Dam Repair

Coordinates: (lat)37.474031 (long) -122.409020 Desired Work Dates: 9/1/2023 to 9/30/2024

Working within the Ordinary High-Water Mark? (check one) Y N x

Estimate the total disturbed area and amount of material excavated in waterways and riparian areas.

LF 0 SF 2000 CY 0

Existing Conditions & Issue to be Addressed: Roughly 2,000 sq ft erosional feature on the face of an earthen berm.

Proposed Activity (include vegetation removal): Excavate and remove unsuitable soils from the base and walls of the erosional feature. Grade to form a tiered keyway along base of feature. Install curtain drain where the keyway base meets the earthen berm. Curtain drain will consist of Caltrans Class II permeable material and 4” weep pipes to drain any subsurface flows exiting the earthen berm. Backfill keyway and subdrain with clay-rich material up to 8’ deep to form an impermeable layer along the face of the earthen berm, extending 38’ down to the toe of the erosion feature. Overtop clay-rich layer with an 8” layer of

Caltrans Class II Permeable and Caltrans Universal Gravel Filter. Add surfacing layer of 2.5’ thick

Caltrans Class V along face of repaired slope, and 3’ thick Caltrans Class VII at toe of slope. Place 12” along top of repair section and install live willow stakes throughout the entire repaired slope.

Watershed: Pilarcitos Creek Waterbody/Stream Name: Madonna Creek

Physical Setting: Remediated off channel excavated dump site serves as the earthen berm to instream CRLF breeding pond on perennial non-anadromous stream.

Fi lle d o u t b y p ro je ct m an ag er d o u t b y M

R P a d m in is tr at o r Attachment FE

Enhancement Opportunities:

Reinforcement of dump site headwall will preserve the CRLF breeding pond within critical CRLF habitat and prevent catastrophic loss of berm/streambank .

OS MRP Project Notification Sheet Calendar Year 2024

Natural Resources and Compliance Form

Figure 1: Site photo.

Figure 3: Aerial photo.

Figure 4: Map.

Biological Assessment

Biological Conditions: Vegetation encroachment into the spillway/pond outlet. Pond functions as breeding habitat for CRLF and spillway work maintains CRLF breeding habitat within federally designated critical habitat.

Protected Wildlife Species

Common Name Occurrence Impact Tier

California red-legged frog

Migratory Birds

San Francisco dusky footed woodrat

Confirmed

Potential

Potential

2B

2B

2B

(See Appendix for Plant Species) Requires Qualified Bio

Monitor

Classify the overall program activity: Tier 1 Tier 2A

| Yes |

Tier 2BX Tier 3

X N

Invasive Species Present:

Permissible Work Window: May 15 to Oct 31 (CRLF)

Applicable BMPs:

BIO1, BIO2, BIO3, BIO09, BIO10, BIO12, BIO17, BIO 22, BIO23, BIO24, BIO25

Botanical surveys required? Y X N If yes, which type? Targeted Protocol X

If a survey is required, list timing of surveys: March to June

Biomonitoring required? Pre-construction Initial Training Throughout None

If required, who is the biomonitor? Chris Perry or Steve Davison or consultant biologist d o u t b y b io lo gi ca l s ta ff

Will the work modify a Sensitive Natural Community? Y

Cultural Resource survey required? (check one)

Pre-construction Initial Training x During Excavation None

CUL1 (completed). Low to Moderate Sensitivity. Due to previously disturbed site, shifts to low. CUL5 and

CUL6 apply due to previously disturbed soils in the proposed work area.

Erosion Control and Revegetation Requirements: BMPs EC-1 through EC-5

Other Requirements (Integrated Pest Management, Wildland Fire Resiliency, other CEQA document):

Compensatory Mitigation Summary:

lle d o u t b y

M R

P a d m in is tr at o r

File details come from the government source that posted it. Updated .