LSCO Joe Ben Welch Student Center Façade Renovation

Closed State & local contract opportunity Posted

Solicitation number
787-10202025
State
Texas
Responses due

Opportunity facts

Jurisdiction
NIGP code
UNSPSC codes
Show all 34
Point of contact

Opportunity details come from txsmartbuy.com. Updated .

About this opportunity

Lamar State College Orange (LSCO) is soliciting Competitive Sealed Proposals (CSP) for a comprehensive Joe Ben Welch Student Center Facade Renovation project located in Orange, Texas. The project involves extensive exterior renovations including removal and replacement of existing veneer, installation of new mansard roof panels, structural support framing, gutter and downspout systems, metal canopy structures, exterior door replacements, and lighting upgrades. A mandatory pre-submittal conference is scheduled for November 4, 2025, at 10:00am, with proposal submissions due on November 17, 2025, at 2:00pm Central. The targeted construction start date is December 15, 2025, with substantial completion expected by July 15, 2026, and final completion by August 15, 2026. Proposal evaluation will utilize a weighted criteria system, with 50% allocated to pricing and delivery, and the remaining 50% distributed across qualifications, experience, project planning, and service capability. Bidders must submit a bid security of at least 5% of the total bid amount and provide comprehensive documentation including proof of insurance, criminal background checks, and compliance with construction standards.

The procurement includes specific Historically Underutilized Business (HUB) subcontracting requirements, indicating a preference for diverse contractor participation. The project includes three potential alternates: demolishing EIFS behind the service yard and replacing piping, replacing the existing roof hatch, and installing back-lit fabricated aluminum letters. Two project allowances are specified: $5,000 for signage and $30,000 for wayfinding signage. The total construction cost limitation is set at $2,750,000, funded through local sources. Contractors must adhere to the 2022 Uniform General Conditions for Construction Projects established by The Texas State University System, which includes specific provisions for project administration, financial management, and legal compliance. The geotechnical investigation recommends foundation systems including shallow spread footings or drilled straight shafts, with the site classified as Seismic Site Class D. Potential bidders must demonstrate technical capabilities, safety procedures, and comprehensive understanding of the project's architectural and structural requirements.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity