This is a comprehensive government project manual and construction bid document for the Joe Ben Welch Student Center Facade Renovation at Lamar State College-Orange, located in Orange, Texas, prepared by PBK Architects, Inc. The project involves renovating the facade of an existing student center, with work to be procured through a Competitive Sealed Proposal (CSP) contract. The project is scheduled for substantial completion by October 27, 2025, with a total project number of 25008902. The document includes detailed specifications across multiple divisions, including architectural, structural, mechanical, and electrical work, with specific focus on facade improvements, renovation techniques, and material specifications.

The project is funded by Lamar State College-Orange and will be awarded based on a comprehensive evaluation of proposals, with consideration given to technical capabilities, cost, and overall project approach. The bid documents outline specific requirements for bidders, including submission of detailed documentation such as qualifications, technical capabilities, safety procedures, and compliance with state and federal regulations. Bidders must provide comprehensive proposal packages, including but not limited to proof of insurance, criminal background checks, and adherence to specific construction standards. The total project scope appears to involve significant facade renovation, potential structural modifications, and comprehensive architectural updates to modernize the student center's exterior.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10200 Grogans Mill Road, Suite No. 230 \\ The Woodlands, Texas 77380 \\ P 210-829-0123 \\ PBK.com

SECTION 00 01 01 - PROJECT MANUAL

FOR

LAMAR STATE COLLEGE-ORANGE

JOE BEN WELCH STUDENT CENTER FACADE RENOVATION

403 GREEN AVE

ORANGE, TEXAS 77630

VOLUME 1

BIDDING AND CONTRACT REQUIREMENTS

AND

SPECIFICATIONS

FOR THE

LAMAR STATE COLLEGE-ORANGE

410 FRONT STREET

ORANGE, TEXAS 77630

95% CONSTRUCTION DOCUMENTS

ISSUE FOR PERMIT AND BID

OCTOBER 27, 2025

PBK PROJECT NUMBER: 25008902

PREPARED BY:

PBK ARCHITECTS, INC.

10200 GROGANS MILL ROAD, SUITE NO. 230

THE WOODLANDS, TEXAS77380

This page intentionally left blank

PBK Architects, Inc. Joe Ben Welch Student Center Facade Renovation PBK Project No. 25008902 Lamar State College-Orange 95% Construction Documents October 27, 2025 Issue for Permit and Bid

01 21 00 - Allowances

SECTION 01 21 00 - ALLOWANCES

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: Administrative and procedural requirements governing allowances.

1. Types of allowances include:

a. Lump sum allowances.

1.3 COORDINATION

A. Coordinate allowance items with other portions of the Work.

1.4 LUMP SUM, UNIT COST, AND QUANTITY ALLOWANCES

A. Allowance shall include cost to the Contractor of specific products and materials ordered by the

Owner or selected by the Architect under allowance and shall include taxes, freight, and delivery to site.

B. Unless otherwise indicated, the Contractor's costs for receiving and handling at site, labor, installation, overhead and profit, and similar costs related to products and materials ordered by the Owner or selected by the Architect under allowance shall be included as part of the Contract Sum and not part of the allowance.

C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or supplier for credit to the Owner, after installation has been completed and accepted.

1. If requested by the Architect, retain and prepare unused material for storage by Owner.

Deliver unused material to the Owner's storage space as directed.

1.5 ADJUSTMENT OF ALLOWANCES

A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Proposal based on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place where applicable. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins.

1. Include installation costs in purchase amount only where indicated as part of the allowance.

2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed.

3. Submit substantiation of a change in scope of Work, if any, claimed in Change Orders related to unit cost allowances.

4. The Owner reserves the right to establish the quantity of Work in place by independent quantity survey, measure, or count.

B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the purchase order amount or the Contractor's handling, labor, installation, overhead, and profit.

1. Do not include the Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of Work has changed from what could have been foreseen from information in the Contract Documents.

2. No change to the Contractor's indirect expense is permitted for selection of higher or lower priced materials or systems of the same scope and nature as originally indicated.

95% Construction Documents October 27, 2025 Issue for Permit and Bid

01 21 00 - Allowances

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related Work.

3.3 SCHEDULE OF ALLOWANCES

A. Allowance No. 01 - Signage

1. Provide an allowance for 15 additional fabricated aluminum letters, reference AS711 for design parameters.

2. Amount: $5,000 (USD) B. Allowance No. 02 - Wayfinding

1. Provide an allowance for building exterior wayfinding signage.

2. Amount: $30,000 (USD)

END OF SECTION

95% Construction Documents October 27, 2025 Issue for Permit and Bid

01 23 00 - Alternates

SECTION 01 23 00 - ALTERNATES

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes:

1. Description of Alternates.

2. Procedures for pricing Alternates.

3. Documentation of changes to Contract Price and Contract Time.

1.3 DEFINITIONS

A. Refer to Section 01 42 16 - Definitions for the following terms:

1. Alternate

1.4 ADMINISTRATIVE REQUIREMENTS

A. The Alternates listed in this Section take precedence over those listed elsewhere in the Contract Documents. In case of conflicting requirements, the requirements listed herein shall govern.

1.5 ACCEPTANCE OF ALTERNATES

A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option.

Accepted alternates will be identified in the Owner-Contractor Agreement.

B. Coordinate related work and modify surrounding work to integrate the Work of each alternate.

1.6 SCHEDULE OF ALTERNATES

A. Alternate No. 01 - EIFS Replacement at Service Yard:

1. Base Bid Item: Existing EIFS to remain on East Wall at Service Yard enclosure as noted on drawings.

2. Add Alternate Item: Remove existing EIFS on East Wall at Service Yard enclosure and replace with thin brick assembly as specified. Reference A-511.

B. Alternate No. 02 - Roof Hatch Replacement:

1. Base Bid Item: Existing roof hatch to remain as noted on drawings.

2. Alternate Item: Replace existing roof hatch per new specification and details. Reference

A-301.

C. Alternate No. 03 - Back-lit Fabricated Aluminum Letters:

1. Base Bid Item: Provide fabricated aluminum letter on North facade as shown on Drawings.

Reference 04/AS711.

2. Alternate Item: Provide back-lit fabricated aluminum letters on North facade as shown on Drawings. Reference 04/AS711.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

NOT USED

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 01 07 - Seals Page

SECTION 00 01 07 - SEALS PAGE

NOTE:

INDICATION OF RESPONSIBILITY BY DISCIPLINE

Letters indicated in parenthesis next to disciplines below indicate responsibility for Sections listed in the Table of Contents.

OWNER (O)

OWNER'S NAME: LAMAR STATE COLLEGE-ORANGE.

Owner's Designated Representative (ODR): Peter Mass.

Address: 410 Front Street.

City, State ZIP: Orange, Texas 77630.

No Seal Required.

STRUCTURAL ENGINEER (S)

COMPANY NAME: DALLY + ASSOCIATES, INC.

Engineer of Record: Fred Dally.

Address: 9800 Richmond Ave, Suite 600.

City, State ZIP: Houston, TX 77042.

Telephone Number: 713-337-8881.

ARCHITECT (A)

COMPANY NAME: PBK ARCHITECTS, INC.

Texas Registered Firm BR-1608.

Registered Architect: Clifford Whittingstall, R.A. #18585.

Address: 601 NW Loop 410, Suite No. 400.

City, State ZIP: San Antonio, Texas78216.

Telephone Number: 210-829-0123.

ROOFING / BUILDING ENVELOPE (R)

COMPANY NAME: BEAM PROFESSIONALS

Registered Roof Consultant: Shawn LeCrone, IIBEC #0889.

Address: 601 NW Loop 410, Suite 400.

City, State ZIP: San Antonio, Texas 78216.

Francisco.Arriaga Image

Francisco.Arriaga Image

Francisco.Arriaga Text Box 2025-10-06

Francisco.Arriaga Image

Francisco.Arriaga Text Box

Francisco.Arriaga Image

Francisco.Arriaga Text Box 2025-10-06

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 01 07 - Seals Page

MECHANICAL AND ELECTRICAL ENGINEER (M E)

COMPANY NAME: JONESDBR ENGINEERING COMPANY, LLC.

Engineer of Record: Erik M. MacDonald, PE.

Address: 9990 Richmond Avenue, Suite 310.

City, State ZIP: Houston, Texas 77042.

Telephone Number: 713.914.4333.

DOOR HARDWARE (H)

COMPANY NAME: ALLEGION

Product Representative: Wendy Pfeiffer.

Address: _______.

City, State ZIP: _______.

Telephone Number: 346-366-1304.

No Seal Required.

END OF SECTION

Francisco.Arriaga Image

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 01 10 - Table of Contents

SECTION 00 01 10 - TABLE OF CONTENTS

GENERAL

RESPONSIBILITY

Each section is the responsibility of the discipline indicated by the letter in parenthesis following the section name as indicated in Section 00 01 07 - Seals Page with the following exceptions:

(O): Section provided by Owner.

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 07 - Seals Page (A) 00 01 10 - Table of Contents (A) 00 11 19 - Request for Proposal (A) 00 21 16 - Instructions to Proposers (CSP) (A) 00 40 17 - Certification of Criminal History Record Information Review (A) 00 40 18 - Conflict of Interest Questionnaire (A) 00 40 20 - Certificate of Interested Parties (A) 00 42 00 - Proposal Forms (A) 00 50 00 - Texas Statutory Performance Bond (A) 00 50 01 - Texas Statutory Payment Bond (A) 00 73 43 - Wage Rate Requirements (Texas) (A) 00 73 46 - Wage Determination Schedule (A)

DIVISION 01 - GENERAL CONDITIONS

Owner's Division 01 (O):

01 00 00 - Miscellaneous Requirements 01 20 00 - Project Meetings 01 31 00 - Project Administration 01 32 00 - Project Planning and Scheduling 01 32 20 - Photographic Documentation 01 35 20 - LEED Requirements 01 35 23 - Project Safety Requirements 01 42 00 - Reference Standards 01 43 00 - Quality Assurance 01 43 39 - Site Mock-ups 01 45 00 - Quality Control 01 45 18 - Field Engineering 01 50 00 - Construction Facilities and Temporary Controls 01 50 10 - Project Signage 01 52 40 - Construction Waste Management 01 70 00 - Contract Close-out 01 91 00 - General Commissioning Requirements

01 10 00 - Summary (A) 01 21 00 - Allowances (A) 01 23 00 - Alternates (A) 01 26 00 - Contract Modification Procedures (A) 01 29 00 - Payment Procedures (A)

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 01 10 - Table of Contents

01 35 16 - Alteration Project Procedures (A) 01 35 43.13 - Environmental Procedures for Hazardous Materials (A) 01 41 00 - Regulatory Requirements (A) 01 55 00 - Vehicular Access and Parking (A) 01 56 00 - Temporary Barriers and Enclosures (A) 01 56 39 - Temporary Tree And Plant Protection (L) 01 57 15 - Integrated Pest Management (A) 01 60 00 - Product Requirements (A) 01 61 16 - Volatile Organic Compound (VOC) Content Restrictions (A) 01 73 00 - Execution (A) 01 78 23 - Operation and Maintenance Data (A) 01 78 39 - Project Record Documents (A)

DIVISION 02 - EXISTING CONDITIONS

02 41 00 - Demolition (A) 02 82 00 - Asbestos Remediation (A) 02 83 00 - Lead Remediation (A) 02 87 13 - Mold Remediation (A)

DIVISION 03 - CONCRETE

03 10 00 - Concrete Forming and Accessories (S) 03 20 00 - Concrete Reinforcing (S) 03 30 00 - Cast-in-Place Concrete (S)

DIVISION 04 - MASONRY

04 01 20 - Maintenance of Unit Masonry (A) 04 05 00 - Common Work Results for Masonry (A) 04 21 13.23 - Surface-Bonded Brick Masonry (A) 04 72 00 - Cast Stone Masonry (A)

DIVISION 05 - METALS

05 12 00 - Structural Steel Framing (S) 05 12 13 - Architecturally-Exposed Structural Steel Framing (A) 05 40 00 - Cold Formed Metal Framing (S) 05 52 00 - Metal Railings (A)

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 - Rough Carpentry (A) 06 16 00 - Sheathing (A) 06 20 00 - Finish Carpentry (A)

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 27 26 - Fluid-Applied Air Barrier System (A R) 07 41 13 - Prefinished Metal Roofing (A R) 07 42 13 - Metal Wall Panels (A)

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 01 10 - Table of Contents

07 62 00 - Roof Related Sheet Metal (A R) 07 65 00 - Flexible Flashing (A R) 07 71 23 - Manufactured Gutters and Downspouts (A) 07 72 33 - Roof Scuttle (Hatches) (A R) 07 84 13 - Penetration Firestopping (A) 07 92 00 - Joint Sealants (A)

DIVISION 08 - OPENINGS

08 11 13 - Hollow Metal Doors and Frames (A)

DIVISION 09 - FINISHES

09 21 16 - Gypsum Board Assemblies (A) 09 90 00 - Painting and Coating (A)

DIVISION 10 - SPECIALTIES

10 14 00 - Signage (A)

DIVISION 11 - EQUIPMENT

NOT USED

DIVISION 12 - FURNISHINGS

NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 - CONVEYING EQUIPMENT

NOT USED

DIVISION 21 - FIRE SUPPRESSION

NOT USED

DIVISION 22 - PLUMBING

NOT USED

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 02 00 - Basic Materials and Methods for HVAC (M) 23 02 01 - Coordination Drawings (M) 23 03 00 - Mechanical Demolition for Remodeling (M) 23 03 00 - Mechanical Demolition for Remodeling (M) 23 05 13 - Common Motor Requirements for HVAC Equipment (M) 23 05 29 - Hangers and Supports for HVAC Piping and Equipment (M) 23 05 53 - Identification for HVAC Piping and Equipment (M) 23 05 93 - Testing, Adjusting, and Balancing for HVAC (M) 23 31 13 - Metal Ducts (M) 23 33 00 - Air Duct Accessories (M) 23 34 00 - HVAC Fans (M) 23 37 13 - Air Distribution Devices (M)

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 01 10 - Table of Contents

DIVISION 25 - INTEGRATED AUTOMATION

NOT USED

DIVISION 26 - ELECTRICAL

26 02 00 - Basic Materials and Methods for Electrical (E) 26 02 01 - Coordination Drawings (E) 26 05 33 - Raceway and Boxes for Electrical Systems (E) 26 09 36 - Lighting Controls (E) 26 51 19 - Lighting Fixtures - Light Emitting Diode LED (E)

DIVISION 27 - COMMUNICATIONS

NOT USED

DIVISION 28 - SAFETY AND SECURITY

NOT USED

DIVISION 31 - EARTHWORK

31 63 29 - Drilled Concrete Piers And Shafts (S)

DIVISION 32 - EXTERIOR IMPROVEMENTS

NOT USED

DIVISION 33 - UTILITIES

NOT USED

DIVISION 34 - TRANSPORATION

NOT USED

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

NOT USED

DIVISION 40 - PROCESS INTEGRATION

NOT USED

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

NOT USED

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

NOT USED

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE

EQUIPMENT

NOT USED

DIVISION 44 - POLLUTION CONTROL EQUIPMENT

NOT USED

DIVISION 45 - INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT

NOT USED

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 01 10 - Table of Contents

DIVISION 48 ELECTRICAL POWER GENERATION

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 11 19 - Request for Proposal

SECTION 00 11 19 - REQUEST FOR PROPOSAL

GENERAL INFORMATION

GENERAL

Proposals for the work identified below, in accordance with Proposal Documents and addenda that may be issued prior to date of proposal opening, will be received by the Owner, the Architect , and the Construction Manager, until proposal closing date and time, identified below.

PROJECT

Name: Joe Ben Welch Student Center Facade Renovation.

Address: 403 Green Ave.

City, State ZIP: Orange, Texas77630.

OWNER

Owner: Lamar State College-Orange.

Address: 410 Front Street.

City, State ZIP: Orange, Texas77630.

Owner's Designated Representative (ODR): Peter Mass.

ARCHITECT

Name: PBK Architects, Inc.

Address: 10200 Grogans Mill Road, Suite No. 230.

City, State ZIP: The Woodlands, Texas77380.

Phone: 210-829-0123.

PROPOSAL INFORMATION

PRE-PROPOSAL CONFERENCE

A. Date and Time: _______.

B. Location: _______.

C. Representatives of the Architect, the Owner, the Construction Manager, and the _______ will be present at this meeting. All Offerors are encouraged to attend.

2.1 PROPOSAL SUBMISSION

A. Date and Time: _______.

B. Location:

1. Location Name: _______.

2. Address: _______.

3. Address: _______.

2.2 PROPOSAL OPENING

A. Date and Time: _______.

B. Location:

1. Location Name: _______.

2. Address: _______.

3. Address: _______.

2.3 PROPOSAL REQUIREMENTS

A. Offerors submitting a proposal are encouraged to visit the site. All Offerors submitting a proposal are encouraged to attend the proposal opening.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 11 19 - Request for Proposal

2.4 PROPOSAL DOCUMENTS

2.5 SUBMITTAL OF PROPOSAL

Submit Proposal to the Owner no later than the date and time specified. Submit proposals in duplicate in a sealed envelope in accordance with Section 00 21 16 - Instructions to Proposers

(CSP).

Provide the following information on the envelope:

1. Name of Offeror.

2. Joe Ben Welch Student Center Facade Renovation.

3. Lamar State College-Orange.

4. Attn: Peter Mass.

A. No proposal shall be withdrawn within 45 days after the proposal opening without the specific consent of the Owner.

B. Owner reserves the right to reject any and all proposals and to waive any informality in the Proposal process.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP)

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS (CSP)

GENERAL

QUALIFIED OFFERORS

Competitive Sealed Proposals will be accepted from qualified Offerors (Contractor) only for the entire scope of work described in the Contract Documents. As a prerequisite to an Offeror's qualifying for the award of contract on this work, the Offeror must complete each item of Section 00 45 00 - Selection Criteria and Contractor Information. In addition to the information contained in Section 00 45 00 - Selection Criteria and Contractor Information, Offerors shall address the selection criteria issues specified for Determination of Successful Respondent and Award of Contract. Submit the Statement and other requested information with the Proposals in four copies; three of which will be retained by Owner and one retained by Architect.

Qualification statements submitted by facsimile transmission will not be accepted.

The primary purposes of the evaluation process will be to:

Gather information for the Owner's evaluation procedure.

Enable Owner and/or Architect to evaluate the Offeror's qualifications.

After review of Proposals and Contractor’s qualifications evaluation Owner will make its decision and each Offeror will be notified.

In arriving at its opinion concerning the Offeror's qualifications, Architect will use the same criteria that Owner will use in determination of the successful Offeror as specified.

In the event a proposed Offeror fails to submit the specified Contractor's Qualification Statement at time of receipt for Proposals, noncompliance shall be considered by Owner and Architect as a negative factor in the determination of the successful Offeror.

OFFEROR’S PRESENTATION

In making its Proposal, the Offeror represents that the Offeror:

Has read and understands the Propose Documents and the Proposal is made in accordance with the drawings and specifications.

Has thoroughly familiarized itself with Division 01 General Requirements as applicable to subsequent specification sections.

Has visited the site, familiarized itself with local conditions under which the work will be performed and has correlated observations with the requirements of the proposed Contract Documents.

Agrees to comply with requirements. An Offeror who subsequently does not agree to comply with the requirements will automatically disqualify itself from proposing or receiving award of the contract.

If the proposal is accepted, the Offeror agrees that:

Work on the project will begin immediately upon receipt of signed Contract or Notice to Proceed.

It will participate as a team member in cooperation with Architect, Engineers, Owner, and Owner's agents and/or consultants.

It will assign a competent full time superintendent, to the project, and that superintendent shall remain on the project for the duration of the project, subject only to continuous employment.

It provide a proposal bond in the amount of ten percent of the contract amount.

If awarded, it shall furnish and pay for a Performance Bond and a Payment Bond each in the full contract amount.

It shall carry and keep in full force for the duration of the Project, insurance coverage for Builder's Risk, Workmen's Compensation, Comprehensive General Liability, and Automobile Liability required by the A201 General Conditions and the Agreement.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP)

By making its Proposal represents that the Proposal includes material and equipment specified in the Proposal Documents and supplemented, if necessary, for a complete and operating system.

Where subcontract work is involved and where Acceptable Subcontractors are designated for particular portions or phases of the Work, by making the Proposal, Contractor represents that its Proposal includes only firms designated as Acceptable Subcontractors.

That no asbestos PCBs or lead building materials shall be used, and that the Offeror and subofferors and suppliers submitting a proposal to a Offeror, shall submit an affidavit at Project Close Out stating that no asbestos, PCB, or lead building materials has been used on the Project.

PROPOSAL DOCUMENTS

Proposal Documents include the Request for Competitive Sealed Proposals, Instructions to Offerors, the Proposal Form, and the proposed Contract Documents, including Addenda issued prior to receipt of proposals.

Contract Documents for the work consist of the AIA A101 Owner-Contractor Agreement as modified by the Owner, the AIA Document A201General Conditions modified by Owner, Drawings, Specifications, and Addenda issued prior to receipt of proposals. Should there be a conflict between the terms of proposal and terms of AIA A101 and AIA A201, as amended by Owner, terms of AIA A101 and AIA A201 control.

PROPOSAL PROCEDURES

A proposal is invalid if it has not been received at the designated location prior to the time and date for receipt of proposals indicated in the Request for Competitive Sealed Proposals, or prior to any extension thereof issued to the Offerors by Addenda.

Requested Alternates shall be proposed. If no change in the Base Proposal is required, enter "No Change".

Prior to the receipt of Proposals, Addenda will be forwarded by Architect and will be available for inspection wherever the proposal documents are kept available for that purpose.

Proposals will be received in duplicate only on the Owner's Form of Proposal for the work as indicated by the Proposal Documents, filled in, and enclosed in a sealed envelope addressed as follows:

Name of Offeror: ____________________________ Project Name: Joe Ben Welch Student Center Facade Renovation

Owner: Lamar State College-Orange Attn: Peter Mass

Proposal shall be accompanied by Proposal Bond or Certified Check in the amount of 10% of the proposal.

Deliver proposals in duplicate in a sealed envelope to the location specified at or before the established time and date. Proposal submitted using the U.S. Postal System shall be sent as Registered Mail.

A proposal may be withdrawn upon request by the Offeror or its duly authorized representative, provided the request is received by Owner at the location designated for receipt of proposals and prior to the time fixed for the opening of proposals. A withdrawal of a proposal shall not be effective unless a written confirmation of the withdrawal is received by Owner at the location of the bid opening within 48 hours before the time established for the opening of proposals.

Proposal Bond will be returned if the proposal is withdrawn in accordance with specified procedures. Withdrawal of a proposal does not prejudice the right of the Offeror to file a new proposal at the time and place stated. No proposal may be withdrawn for 30 days after the time fixed for the opening of proposals.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP)

INTERPRETATION OF PROPOSAL DOCUMENTS

Offerors and subofferors requiring clarification or interpretation of the Proposal Documents shall make a written or verbal request which shall reach Architect at least ten days prior to the date for receipt of proposals.

Interpretation, correction, or change of the Proposal Documents will be made by Addendum.

Interpretations, corrections, or changes of the Proposal Documents made in any other manner are not binding.

SUBSTITUTIONS OF MATERIALS AND EQUIPMENT

Materials, products and equipment described in the Proposal Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. Materials and equipment named in, and procedures covered by these specifications have been selected as a standard because of quality, particular suitability or record of satisfactory performance. It is not intended to preclude the use of equal or better materials or equipment provided that same meets the requirements of the particular project and is approved in an addendum as a substitution prior to the submission of proposals.

Substitutions will not be considered prior to receipt of proposals unless written request for approval has been received by Architect at least seven days prior to the date established for receipt of proposals and the substitution request complies with requirements of Section01 25 13

- Product Substitution Procedures. Proposer shall complete the Substitution Request Form and submit with complete supporting data including drawings, catalogue cuts, performance and test data, and other technical data necessary for an evaluation. Architect's decision of a proposed substitution shall be final.

If Architect accepts a proposed substitution prior to receipt of proposals, notice of acceptance shall be by Addenda.

No substitutions will be considered after the Contract award.

REJECTION OF PROPOSALS

Owner reserves the right to reject any or all proposals and to reject a proposal that is not accompanied by the required proposal security or other data required by the Proposal Documents, and to reject a proposal which Owner considers incomplete or irregular.

Owner reserves the right to reject any or all proposals and to waive any formalities or irregularities and to make the award of the contract in the best interest of Owner.

Owner reserves the right to reject a proposal if the evidence submitted by, or investigation of, the offeror fails to satisfy Owner that the offeror is properly qualified to carry out the obligations of the contract and to complete the work. Award of the Contract may be made to other than the low dollar offeror and may be awarded to the Offeror proposing the best value to Owner, in addition to the purchase price, based on the published selection criteria and on its ranking evaluation.

Do not submit voluntary alternates. Owner reserves the right to reject proposals accompanied by conditional or qualifying statements, or voluntary alternates.

INSURANCE

Each Offeror shall include in its proposal the cost of insurance and shall carry and keep insurance in full force for the duration of the project. Provide insurance coverage required under the AIA Document A201 General Conditions modified by Owner and included herein under Section 00 70 00 - Conditions of the Contract.

PERFORMANCE BOND AND PAYMENT BOND

Each Offeror shall include in its proposal the cost for the premium for 100% Performance Bond and 100% Payment Bond. The bonds shall cover the faithful performance of the contract and

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP) payment of obligations arising thereunder in such form as Owner may prescribe. Bonding companies must be acceptable to Owner. Selected Offeror shall deliver the required bonds to Owner no later than the date of execution of Contract.

PROPOSAL SECURITY

No proposal will be considered unless it is accompanied by a Certified or Cashier's Check or Proposal Bond executed on attached form. In either case the amount shall be not less than ten percent of the greatest amount proposed (considering alternates, if any). Proposal security shall insure the execution of the contract and the furnishing of an acceptable Performance Bond and Payment Bond by the successful Offeror within ten days after notification of award to Offeror and that its proposal shall not be withdrawn for a period of 30 days after date of opening of proposals without the consent of Owner. Proposal Bond shall be prepared in identical form of AIA Document A310.

SUBMISSION OF POST PROPOSAL INFORMATION

Apparent Selected Offeror shall, within three days after proposals are received, submit the following:

A designation of the work to be performed by Offeror with his own forces.

An experience profile of the selected Offeror's superintendent scheduled to work on this project. In addition, apparent selected Offeror shall cooperate with Owner, supplying requested information to substantiate qualifications of the superintendent. If, in the opinion of Owner, the superintendent does not qualify, Owner may request the submission of another superintendent and more information. Owner reserves the right to reject the apparent selected Offeror if an acceptable superintendent is not presented.

Selected Offeror shall, within five (5) days thereafter, submit the following:

A statement of costs for each major item of work included in the proposal described in Section 01 29 00 - Payment Procedures. Each portion of work identified in specifications shall be considered a major item of work and shall be shown as a separate cost item.

AWARD OF CONTRACT

Selected Offeror will be notified within 45 days from the date on which proposals are opened.

Offerors shall hold their offer open for 45 days after the submission deadline. If Owner is unable to negotiate a contract with the first selected offeror, Owner shall formerly end negotiations with that offeror and proceed to the next offeror in the order of the selection ranking until a contract is reached or each proposal is rejected.

Offeror will be required to (a) submit its Proposal and Proposal Bond, (b) execute Contract and Performance and Payment Bonds, and (c) submit Certificates of required insurances, using Owner's respective forms.

Proposal Bond is forfeited if proposal is withdrawn after the proposal opening, or Contract Documents are not executed in accordance with specified procedures or time period.

NOTICE TO PROCEED

Offeror shall not commence work under this Contract until it receives a written Notice to Proceed or Contract is duly signed by Owner.

COMPLETION TIME

Offerors shall familiarize themselves with Owner's requirements concerning the project schedule. Project is to be substantially complete no later than mm-dd-yyyy.

Having thoroughly familiarized itself with the conditions as they exist at the building site and acquainted itself with the labor supply and the material market, the Offeror shall state in its proposal that it agrees to be substantially complete with the work within the calendar days stated in its Proposal.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP)

The definition of Substantial Completion is found in Article 9.8.1 of the AIA Document A201 General Conditions of the Contract for Construction modified by Owner and included under Section 00 70 00 - Conditions of the Contract.

FELONY CONVICTION NOTIFICATION

Section 44.034, of Texas Education Code requires a person or business entity that enters into a contract with a school district give advance notice to the district if the person or an owner or operator of the business entity has been convicted of a felony. The notice must include a general description of the conduct resulting in the conviction of a felony. Subsection (b) states “a school district may terminate a contract with a person or business entity if the district determines that the person or business entity failed to give notice as required by Subsection (a) or misrepresented the conduct resulting in the conviction. The district must compensate the person or business entity for services performed before the termination of the contract.”

Subsection (c) states “this section does not apply to a publicly held corporation.”

The Offeror shall execute Section 00 40 11 - Felony Conviction Notification and submit with proposal.

AFFIDAVIT OF NON-DISCRIMINATORY EMPLOYMENT

Offeror and subofferors agree to refrain from discrimination in terms and conditions of employment to the basis of race, color, religion, sex, or national origin, and agrees to take affirmative action as required by Federal Statutes and Rules and Regulations issued in order to maintain and insure non-discriminatory employment practices.

Offerors shall execute Section 00 40 13 - Affidavit of Non-Discriminatory Employment and submit with Proposal. Subofferors shall execute Section 00 40 13 - Affidavit of Non- Discriminatory Employment prior to commencing work on Project. Offerors and subofferors who do not execute Section 00 40 13 are not be eligible to work on the project.

SUBCONTRACTOR LISTING

Offeror shall supply a listing of the primary subcontractors using Section 004012:

Mechanical.

Electrical.

Plumbing.

Masonry.

Concrete.

Steel.

Any other prudent subcontractor.

AFFIDAVIT OF NO ASBESTOS, LEAD, AND PCB USE IN PROJECT

Use of a construction process or the installation of asbestos, lead, and PCBs or material containing asbestos, lead, and PCBs is strictly prohibited.

Prior to submitting a proposal, Offerors shall notify Architect, in writing, if a specified material is known to contain or is likely to contain asbestos, lead, or PCBs.

Offeror and subofferors agree to refrain from using products which are known to contain asbestos, lead, and PCB containing materials as applicable to Project. They shall affirm that lead or materials containing lead have not been incorporated into potable water systems, and that lead sheet flashing used in through roof plumbing penetration applications is the only lead on Project.

Selected Offeror and its subofferors shall execute Section 00 40 14 - Affidavit of Non-Asbestos, Lead, and PCB Use and submit at Project Closeout.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP)

PROPOSAL EVALUATION WAIVER

By submitting a proposal, each offeror agrees to waive claims it has or may have against Owner, Program Manager, and their respective employees, Architect and consultants, and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any proposal; waiver of any requirements under the Proposal Documents, acceptance or rejection of any proposals; and award of the contract.

Offerors shall execute Section 00 65 01 - Proposal Evaluation Waiver and submit with the Proposal.

CONFLICT OF INTEREST QUESTIONNAIRE

According to Local Government Code, Chapter 176, a person or an agent of a person who contracts or seeks to contract for the sale or purchase of property, goods, or services with any local government agency must file a completed Conflict of Interest Questionnaire (CIQ) with the records administrator of the local government not later than the seventh business day after the date that the person begins contract discussions or negotiations with Owner or submits to Owner an application, response to a request for proposals or bids, correspondence, or another writing related to a potential agreement with Owner.

Offerors and subofferors proposing to do work with Owner shall execute Section 00 40 18 - Conflict of Interest Questionnaire and submit to Owner’s Legal Department within seven (7) days of the Proposal Date. This requirement will be waived if Offeror or sub-offeror has previously submitted such document to Owner within the last year. In such case, provide written notification and attach to Proposal.

CRIMINAL HISTORY RECORDS

Prior to commencing any work on this Project, Contractor shall certify, on the form provided herein as Section 00 40 17 - Certification of Criminal History Record Information Review, that, for each of its employees and those of its Subcontractors who will have direct contact with students, Contractor has obtained, as required by Texas Education Code Section 22.0834:

national criminal history record information from a law enforcement or criminal justice agency for each employee of Contractor or Subcontractor hired before January 1, 2008 who will have direct contact with students; and national criminal history record information from the Texas Department of Safety for each employee of Contractor or Subcontractor hired on or after January 1, 2008 who will have direct contact with students; Fingerprinting is required and shall be provided by Contractor (applicant) and administered through FAST (Fingerprint Applicant Services of Texas) which will be recorded by the District in the FACT (Fingerprint-based Applicant Clearinghouse of Texas). Currently applicant must obtain fingerprinting from L-1 Identity Solutions Company, 888-467-2080, or schedule an appointment online at:

https://tx.ibtfingerprint.com/.

Any personnel who will have direct contact with students must not have been convicted of an offense identified in Texas Education Code Section 22.085.

Contractor shall execute and submit Section 00 40 17 - Certification of Criminal History Record Information Review along with required Schedule ‘A’ documenting proposed employees to be working on site, within 10 days after receipt of Notice To Proceed and prior to commencement of Work.

Furthermore, an updated Schedule ‘B’ shall be submitted weekly to Owner indicating changes to contractor personnel with accompanying certifications and criminal history records. Any fingerprinting and photographing required by the aforementioned code will be the responsibility of Contractor.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP)

AVAILABILITY OF MATERIALS AND SYSTEMS

A serious effort has been made to select materials that are systems that are readily available.

To the extent known at proposal time specified items are available or within a relatively short period of time. If during the proposal period, should an Offeror become aware of an availability or delivery issue with the specified systems or materials, it should notify Architect immediately.

Architect will promptly explore possibilities for selecting other systems or materials which would eliminate the issue and notify Offerors of changes by addendum. It shall be understood that only specified systems and materials that are readily available are included in the proposal.

DETERMINATION OF SUCCESSFUL RESPONDENT AND AWARD OF CONTRACT

In determining Selected Offeror, a Selection Committee will evaluate the information derived from Section 00 45 00 - Selection Criteria and Contractor Information.

Selection Committee consisting of Owner’s administrators, program managers, Architects, consultants and other staff will make an initial evaluation of the proposals. Committee’s recommendation will be considered by Owner’s Board of _______ (“Board”). Owner reserves the right to review the recommendation with Director of Maintenance and Operations and others deemed appropriate by Owner prior to review by entire Board. Final decision-making authority on the proposals rests with full Board. Decision-making authority has not been delegated to any person or entity other than Board.

Owner will make such investigations as it deems necessary to determine the ability of the offeror to perform the Work, and the offeror shall furnish all such information and data for this purpose as may be requested. Owner reserves the right to reject any proposal if the evidence submitted by, or investigation of, such offeror fails to satisfy Owner that such offeror is properly qualified to carry out the obligations of the Contract and to complete the Work contemplated therein.

Owner reserves the right to reject any or all proposals and to waive any formalities or irregularities and to make the award of the contract in the best interest of Owner.

A decision regarding determination of the successful Offeror will be made by Owner as soon as practical.

USE OF ASBESTOS FREE MATERIALS, PRODUCTS AND SYSTEMS

Offeror shall consider the use of asbestos free material requirements in preparing its Proposal including requirements during performance of the work regarding the use of asbestos free materials, products, and systems in Project.

Since many materials, products and systems are proprietary, it is not possible to know the specific materials or components that produce each material, product or system without the manufacturer divulging trade secrets or patent information. Every effort has been made to specify materials, products, or systems, which do not contain asbestos.

It is Contractor’s responsibility to submit an affidavit from the manufacturer to ascertain that every material, product or system used in the Project does not contain asbestos. In the event a material, product, or system is found to contain asbestos, Contractor shall offer for Architect’s consideration a substitution which it knows does not contain asbestos.

Although a material, product, or system is specified or a specification is based on a specific material, product, or system, Contractor is not to be relieved from its responsibility to ascertain that materials, products, and systems used in Project do not contain asbestos. Under no circumstances shall a material, product, or system which is known, suspected, or found to contain asbestos be used in Project.

If a material, product, or system containing asbestos is used, Contractor shall remove and replace the material, product, or system with a comparable or better asbestos free material at no expense to Owner, including removal and replacement of other materials affected by the removal of the asbestos containing material, product or system, i.e.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 21 16 - Instructions to Proposers (CSP) removal, replacement, and finishing of gypsum board due to removal of asbestos insulation.

COMPLIANCE WITH TEXAS GOVERNMENT CODE 552.372

Contractor or vendor agrees contract can be terminated if Contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter, including the preservation of all “contracting information” (as defined in 552.003) and the provision, upon request of the governmental entity with whom you are contracting, of all contracting information. Contracting information includes, but is not limited to, records, communications and other documents related to the bid process, contract, payments, receipts, scope of work/services, and performance.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 40 17 - Certification of Criminal History Record Information Review

SECTION 00 40 17 - CERTIFICATION OF CRIMINAL HISTORY RECORD INFORMATION REVIEW

GENERAL

CERTIFYING AFFIDAVIT SUBMITTED TO:

Owner: Lamar State College-Orange Owner's Address:

410 Front Street.

Orange, Texas77630.

Project Name: Joe Ben Welch Student Center Facade Renovation Project Address:

403 Green Ave.

Orange, Texas 77630.

The completion of Conflict of Interest Questionnaire is not needed if the person is an employee of a governmental entity and is acting in the employee’s official capacity.

STATE OF TEXAS

COUNTY OF __________

(1) Undersigned representative, on behalf of the contracting firm identified below, swears and affirms to Lamar State College-Orange (the Owner) that such firm has obtained, reviewed and verified, from a law enforcement or criminal justice agency or a private entity that is consumer reporting agency governed by the Fair Credit Reporting Act (15 U.S.C. §§ 1681 et seq.) the criminal history record information of all employees hired before January 1, 2008, who (a) have or will have continuing duties related to the contracted services, and (b) have or will have direct contact with students. Such employees are identified by name on Schedule A (the Contractor shall provide and attach hereto). Undersigned further swears and affirms no employees who meet the requirements of (a) and (b) herein and/or identified on Schedule A have been convicted of any offense identified in Section 22.085 of the Texas Education Code.

(2) Undersigned representative, on behalf of the contracting firm identified below, swears and affirms to the Owner, that such firm has obtained, reviewed and verified, from Texas Department of Public Safety criminal clearinghouse, the national criminal history record information of all employees hired on or after January 1, 2008, who (a) have or will have continuing duties related to the contracted services, and (b) have or will have direct contact with students. Such employees are identified by name on Schedule B (the Contractor shall provide and attach hereto). Undersigned further swears and affirms no employees who meet the requirements of (a) and (b) herein and/or identified on Schedule B have been convicted of any offense identified in Section 22.085 of the Texas Education Code.

(3) Undersigned firm swears and covenants that no present or future employee will provide services to the Project that involve direct contact with students unless and until such employee's national criminal history record information has been reviewed and cleared as required by Paragraph (2) above, and an updated Certification has submitted by the contracting firm to the Owner with an updated Schedule B identifying such employees. In the event of an emergency, an employee who has not been previously certified may only provide services that involve direct contact with students if such employee is escorted by a representative of the Owner .

(4) Undersigned firm swears and covenants that, upon receipt of information, directly or indirectly, that any employee of the contracting firm has been convicted of an offense identified in Section 22.085 of the Texas Education Code, the contracting firm will immediately remove such employee from the Project and notify the Owner.

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 40 17 - Certification of Criminal History Record Information Review

(5) Furthermore, if requested by the Owner, the name, driver's license number, and any other information required by the DPS will be submitted to Owner for any person on either Schedule A or Schedule B.

________________________, being duly sworn, affirms and certifies that they are the _________________________________ (position) of ________________________ (contracting firm), and that all statements and acknowledgements contained herein are true and correct, and that they have the authority to bind such firm to the covenants set out above.

Signature: __________________________________________________________________

NOTARIZATION

Subscribed and sworn to before me this _____ day of _______________________, 20____.

Notary Public: ______________________________________ State of ___________________________________________ Commission expiration: ______________________________

Seal

95% Construction Documents October 06, 2025 Issue for Permit and Bid

00 40 18 - Conflict of Interest Questionnaire

SECTION 00 40 18 - CONFLICT OF INTEREST QUESTIONNAIRE

GENERAL

INSTRUCTIONS

According to Texas Local Government Code, Chapter 176, Section 176.006 (176 LGC 176.006), a person or an agent of a person who contracts or seeks to contract for the sale or purchase of property, goods, or services with Lamar State College-Orange, as a Local Government Entity (i.e. county, municipality, school district, charter school, or junior college district) must file a completed Conflict of Interest Questionnaire with the Owner’s Legal Department not later than the seventh business day after the date that the person begins contract discussions or negotiations with the Owner or submits to the Owner an application, response to a request for proposals or bids, correspondence, or another writing related to a potential agreement with the Owner.

Conflict of Interest Questionnaire is required to be filed annually by September 1 as long as the person or the agent of the person continues to contract or seek to contract for the sale or purchase of property, goods, or services with the Owner or not later than the 7th business day after the date the originally filed questionnaire becomes incomplete or inaccurate.

The completion of Conflict of Interest Questionnaire is not needed if the person is an employee of a governmental entity and is acting in the employee’s official capacity.

EXPLANATION OF THE CONFLICT OF INTEREST QUESTIONNAIRE:

1. Name of person doing business with the Owner.

2. Check the box if you are filing an update to a previously filed questionnaire.

3. Describe each affiliation or business relationship with an employee or contractor of the Owner who makes recommendations to an officer of the Owner with respect to expenditure of money. If no affiliation or business relationship exists, state “NONE.”

Examples:

If your spouse, parent, or child is the Owner’s Director of Purchasing and a bid is being submitted to the Purchasing Department, this relationship must be reported.

If your spouse, parent, or child is the Principal at a school and your business may sell items directly to that school, this relationship must be reported.

If you or your spouse, parent, or child is in business with an employee of the Owner who would be making a recommendation concerning a purchase or sales transaction involving you, the relationship must be reported.

If you employ or do business with a spouse, parent, or child of an employee of the Owner who would be making a recommendation concerning a purchase or sales transaction involving you, the relationship must be reported.

If you are an employee of the Owner and would be making a recommendation concerning a purchase or sales transaction involving you, the relationship must be reported.

If your spouse, parent, or child is a teacher that does not make recommendations concerning purchasing or sales transactions, this relationship should not be reported.

If your spouse, parent, or child is a Principal at a school and a bid is being considered by a separate department such as Facilities Planning (Construction…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .