Kedron Pool Boiler Replacement Project (Amended 2/19/2025)
Closed State & local contract opportunity Posted
- Solicitation number
- PE-65650-NONST-2025-000000016
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91017 Energy Computerized Control System (Hvac, Lighting, Utilities, Etc) Installation, Maintenance And Repair Services
- 91082 Wiring And Other Electrical Maintenance And Repair Services
- 91438 Electrical
- 93625 Electrical Equipment (Except Cable And Wires, And Lighting Fixtures) Maintenance And Repair
- 96848 Inspection Services, Electrical Instrumentation And Control
- UNSPSC codes
- 72151510 Environmental system control installation service
- 72154023 Lightning conductor erection service
- 71112125 Electric wireline operation base and logistics
- 71161208 Electric wireline surface equipment services
- 72151522 Electrical luminary service
- 72151508 Computerized controls installation service
- 71161207 Electric wireline manpower services
- 72151500 Electrical system services
- 72151524 Industrial electrical service
- 72151501 Lighting installation services
Show all 19
- 72151507 Electronic controls installation service
- 72151509 Energy management controls installation service
- 71112124 Electric wireline open hole services
- 71161209 Electric wireline mechanical and auxiliary services
- 71161210 Electric wireline data processing services
- 71161211 Electric wireline lost hole services
- 71161212 Electric wireline integrated service packages
- 76111503 Lighting maintenance services
- 73152108 Electrical equipment maintenance and repair service
- Point of contact
-
- Angela Egan aegan@peachtree-city.org (770) 486-4181
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Peachtree City, located in Dodge County, Georgia, is soliciting bids for the Kedron Pool Boiler Replacement Project, an infrastructure improvement initiative for the Kedron Aquatic Center. The procurement is an Invitation for Bids (IFB) that requires replacing the existing boiler system used to heat water for both pools, including replacement of pumps and related piping to circulate heating fluid through heat exchangers. A mandatory pre-bid meeting is scheduled for February 13, 2025, at 10:00 AM at the Kedron Fieldhouse and Aquatic Center, with sealed bids due on February 27, 2025, at 3:00 PM local time. The project requires a contractor with a current Georgia General Contractor's License and at least 5 years of experience installing commercial grade mechanical equipment, with specific restrictions against equipment substitutions. The project timeline mandates substantial completion within 120 calendar days from the Notice to Proceed, with final completion 30 days thereafter, and includes liquidated damages of $250 per day for delays beyond specified completion dates.
Bidders must provide a 5% bid security, and the successful contractor will be required to furnish performance and payment bonds at 100% and 110% of the contract value, respectively. While no specific set-aside designations for disadvantaged enterprises are mentioned, the project appears open to qualified general contractors. Shumate is noted as the current maintenance contractor for controls and building/BACnet/DDC systems, and PROSTAR Fire Systems, Inc. is identified as the existing fire alarm manufacturer. The bid includes a $10,000 testing allowance for third-party test and balance services, and payment terms are specified as Net 15 days, processed by the Peachtree City Project Manager. The contract will be awarded to the lowest responsive and responsible bidder, with the project being locally funded. While a specific budget range is not explicitly stated, the comprehensive scope of work and equipment replacement suggest a significant capital investment for the municipal infrastructure upgrade.
Opportunity text
Project includes furnishing equipment and labor to replace the boiler used to heat the water for both pools at the Kedron Aquatic Center, replace the pumps and related piping to circulate heating fluid through heat exchangers, and test and balance entire system once installed.
Files
| File | Type | Posted |
|---|---|---|
| Kedron Pool Boiler Replacement IFB complete.pdf | ||
| Addendum 1 _Kedron Pool Boiler Replacement.pdf |