Addendum 1 _Kedron Pool Boiler Replacement.pdf
PDF 749 KB Posted
- Solicitation number
- PE-65650-NONST-2025-000000016
- Issued by
- Dodge County, Georgia
About this file
This is Addendum #1 for the City of Peachtree City's Kedron Pool Boiler Replacement Project (25-111BES). The addendum provides clarifications regarding the boiler replacement project, including confirmation that the roof project is expected to be completed before this project begins, though not guaranteed. The document clarifies that Shumate currently holds the maintenance contract for controls and building/BACnet/DDC systems. Sheet M200 has been revised to specify that all existing piping in the boiler room shall be removed and replaced. The addendum confirms AFB as the preferred VFD vendor and PROSTAR Fire Systems, Inc. as the existing fire alarm manufacturer.
The addendum includes revised pages for the Bid Form, Agreement, and Price and Payment Procedures, along with an updated M200 Mechanical Piping Schematic. A key financial requirement specified is the inclusion of a $10,000 testing allowance in the base bid for third-party test and balance services as detailed in the plan General Notes on sheet M001. The agreement includes liquidated damages of $250.00 per day for delays after the specified substantial completion date and for delays in final completion. Payment terms specify progress payments will be made on a Net 15 day basis, with payments processed by the Peachtree City Project Manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Kedron Pool Boiler Replacement IFB complete.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Peachtree City 151 Willowbend Road Peachtree City, GA 30269 Phone: 770-631-2515 Fax: 770-631-2507 PeachtreeCityGA.gov Purchasing Department
CITY OF PEACHTREE CITY
KEDRON POOL BOILER REPLACEMENT PROJECT
25-111BES
ADDENDUM #1
QUESTION: Does the city expect the roof project to be completed before this boiler replacement project is started? CITY’S RESPONSE: Yes, the city expects the roof to be completed but that is not guaranteed.
QUESTION: Who has the maintenance contract on the controls? CITY’S RESPONSE:
Currently, the city contracts with Shumate for all maintenance activities.
QUESTION: Review section M200- seems to be contradictory instructions in one drawing to demo. CITY’S RESPONSE: Sheet M200 has been revised, see attached, to clarify that all of the existing piping in the boiler room shall be removed and replaced.
QUESTION: Is there a preferred vendor for the VFD? CITY’S RESPONSE: Yes, the preferred vendor is AFB.
QUESTION: Who is the existing fire alarm manufacturer? CITY’S RESPONSE: The existing fire alarm manufacturer is PROSTAR Fire Systems, Inc.
QUESTION: Who has the building/BACnet/DDC Controls? CITY’S RESPONSE:
Currently, the city contracts with Shumate for all control system maintenance activities.
QUESTION: Can you confirm if “inspection allowances” need to be included in the base bid? Pg. 170. Is this referring to test and balance? CITY’S RESPONSE: Yes all bidders should include an allowance of $10,000 for testing and inspection. Please see revised pages attached to this addendum. This allowance is intended to cover the costs of a third party test and balance as detailed in the plan General Notes on sheet M001.
Attachments:
Bid Form Revised – page 4 Agreement Revised – page 2 Price and Payment Procedures Revised – page 5 M200 Mechanical Piping Schematic Revised
February 19, 2025
Kedron Pool Boiler Replacement
00 41 00-4
REVISED 2/19/2025 *- BID FORM.
1. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
ARTICLE 1 – BIDDER’S CERTIFICATION
1.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
ARTICLE 2 – BASIS OF BID
2.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
2.02 LUMP SUM BASE BID:
Lump Sum Base Bid Price $ Testing Allowance $10,000
TOTAL BASE BID $
All specified cash allowances are included in the price(s) set forth above, and have been computed in accordance with Paragraph 11.02 of the General Conditions.
Kedron Pool Boiler Replacement
00 52 00.-2
REVISED 2/19/2025 AGREEMENT
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner $250.00 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $250.00 for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment.
ARTICLE 5 – Contract Price
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraphs 5.01.A and 5.01.B below:
Lump Sum Base Bid Price $
Testing Allowance $10,000
TOTAL BASE BID $
All specific cash allowances are included in the above price in accordance with Paragraph
11.02 of the General Conditions.
ARTICLE 6 – Payment Procedures
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by the Peachtree City Project Manager as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of approved Contractor’s Applications for Payment on or about Net 15 days of each month during performance of the Work as provided in Paragraph 6.02.A.1 below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentages indicated below but, in each case, less the aggregate of payments previously made and less such amounts as the Peachtree City Project Manager may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions.
Project name 01 20 00-5 Project number PRICE AND PAYMENT PROCEDURES firm providing the services.
2. Submit results of services provided which verify required results.
1.07 TESTING AND INSPECTION ALLOWANCES
A. Costs Included in Testing and Inspecting Allowances:
1. Cost of engaging testing and inspecting agency.
2. Execution of tests and inspecting.
3. Reporting results.
B. Costs Not Included in Testing and Inspecting Allowance but Included in Contract Sum/Price:
1. Costs of incidental labor and facilities required to assist testing or inspecting agency.
2. Costs of testing services used by Contractor separate from Contract Document requirements.
3. Costs of retesting upon failure of previous tests as determined by Architect/Peachtree City Project Manager.
C. Payment Procedures:
1. Submit one copy of inspecting or testing firm's invoice with next Application for Payment.
2. Pay invoice upon approval by Peachtree City Project Manager.
D. Testing and Inspecting Allowance Schedule:
1. Include sum of $10,000 for payment of testing laboratory services specified in Section 01 45 29 - Testing Laboratory Services.
E. Differences in cost will be adjusted by Change Order.
F. Testing performed outside of that allowed in contract will be the responsibility of the Contractor unless the cost for such testing is approved, in writing, by the Project Manager prior to such testing being performed. Furthermore, any testing required due to the Contractor’s failure to follow the Contract documents and plans shall be the responsibility of the Contractor.
1.08 SCHEDULE OF VALUES
A. Submit printed schedule on AIA standard form or Contractor's standard form as well as in electronic format.
B. Submit Schedule of Values within 20 days after date established in Notice to Proceed.
C. Format: Use Table of Contents of this Project Manual. Identify each line item with
ASBESTOS HAZARD NOTIFICATION
COPYRIGHTED DOCUMENT
THIS DRAWING AND THE CADD
FILE FROM WHICH IT HAS BEEN
GENERATED WAS PREPARED SITE
SPECIFIC FOR THE ABOVE NAMED
PROJECT AND IS NOT INTENDED
FOR USE OTHER THAN THIS
PROJECT WITHOUT THE EXPRESS
WRITTEN CONSENT OF
TIMBERHOOD CONSULTING, LLC
IS PROHIBITED
THE OWNER IS RESPONSIBLE FOR
THE REMOVAL OF ASBESTOS
THAT MAY EXIST IN THE WORK
AREA. DO NOT DISTURB ANY
MATERIALS THAT CONTAIN
ASBESTOS. SEE SPECIAL
CONDITIONS OF THE CONTRACT
DOCUMENTS FOR REQUIREMENTS
REGARDING ASBESTOS.
REVISIONS
NO. DATE DESCRIPTION
L E
IS
U
R E
V A
LL
E
Y
D U
N W
O O
D Y
, G A b kl er ti m b er h o o d .c o m o
. 7
.4
.2
M E
C H
A N
IC
A
L
E
L E
C T
R
IC
A L
P L
U M
B
IN
G
P E
A C
H T
R E
E C
IT
Y
K E
D R
O N
P O
O L
B o ile r an d
H yd ro n ic P ip in g M o d s
F
IE
LD
H O
U S
E D
R P
E A
C H
T R
E E
C
IT
Y , G
A
M200
MECHANICAL
PIPING
SCHEMATIC
KEY PLAN NOTES
AutoCAD SHX Text
(E)MAKE UP AIR HEATING COIL
AutoCAD SHX Text
(E)3-WAY CONTROL VALVE (TYP)
AutoCAD SHX Text
(E)OUTDOOR BOILER
AutoCAD SHX Text
(E)BOILER
AutoCAD SHX Text
(E)PLATE AND FRAME HX
AutoCAD SHX Text
(E)PLATE AND FRAME HX
AutoCAD SHX Text
(E)CHEMICAL SHOT FEEDER
AutoCAD SHX Text
(E)EXPANSION TANK
AutoCAD SHX Text
(E)SECONDARY PUMP
AutoCAD SHX Text
(E)BOILER PUMP
AutoCAD SHX Text
(E)BOILER PUMP
AutoCAD SHX Text
POOL SIDE
AutoCAD SHX Text
POOL SIDE
AutoCAD SHX Text
POOL EQUIPMENT ROOM
AutoCAD SHX Text
BOILER EQUIPMENT ROOM
AutoCAD SHX Text
%%UBOILER HOT WATER PIPING SCHEMATIC - DEMOLITION
AutoCAD SHX Text
SCHEMATIC ONLY
AutoCAD SHX Text
(E)MAKE UP AIR HEATING COIL
AutoCAD SHX Text
(E)3-WAY CONTROL VALVE (TYP)
AutoCAD SHX Text
(E)PLATE AND FRAME HX
AutoCAD SHX Text
(E)PLATE AND FRAME HX
AutoCAD SHX Text
(E)CHEMICAL SHOT FEEDER
AutoCAD SHX Text
POOL SIDE
AutoCAD SHX Text
POOL SIDE
AutoCAD SHX Text
POOL EQUIPMENT ROOM
AutoCAD SHX Text
BOILER EQUIPMENT ROOM
AutoCAD SHX Text
%%UBOILER HOT WATER PIPING SCHEMATIC - NEW WORK
AutoCAD SHX Text
SCHEMATIC ONLY
AutoCAD SHX Text
BP
AutoCAD SHX Text
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
BP
AutoCAD SHX Text
AutoCAD SHX Text
ET
AutoCAD SHX Text
AutoCAD SHX Text
BT
AutoCAD SHX Text
AutoCAD SHX Text
AS
AutoCAD SHX Text
AutoCAD SHX Text
HWP
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
SHEET NO.:
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
ISSUED
AutoCAD SHX Text
THC PROJECT NO.:
AutoCAD SHX Text 24011
AutoCAD SHX Text
27 JAN 2025
AutoCAD SHX Text
BJK
AutoCAD SHX Text
BJK
AutoCAD SHX Text
STAMP
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text No. 27393
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text B
AutoCAD SHX Text J
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text Y
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
(APPLY TO THIS SHEET ONLY)
AutoCAD SHX Text
1. REMOVE EXISTING BOILER PUMP (HWP-1), HOT WATER SUPPLY PIPING, HOT RETURN PIPING. REMOVE EXISTING BOILER PUMP (HWP-1), HOT WATER SUPPLY PIPING, HOT RETURN PIPING. 2. EXISTING HOT WATER CHEMICAL SHOT FEEDER TO REMAIN, REMOVE EXISTING EXPANSION TANK AND AIR SEPARATOR. EXISTING HOT WATER CHEMICAL SHOT FEEDER TO REMAIN, REMOVE EXISTING EXPANSION TANK AND AIR SEPARATOR. 3. REMOVE EXISTING HYDRONIC HEATING WATER BOILER, REMOVE EXISTING HYDRONIC HEATING WATER BOILER, 4. FURNISH AND INSTALL HOT WATER HEATING OUTDOOR BOILER (B-1 & B-2) FURNISH AND INSTALL HOT WATER HEATING OUTDOOR BOILER (B-1 & B-2) 5. FURNISH AND INSTALL NEW 3" HOT WATER SUPPLY AND RETURN PIPING. FURNISH AND INSTALL NEW 3" HOT WATER SUPPLY AND RETURN PIPING. 6. FURNISH AND INSTALL BOILER PUMP (BP-1&2). FURNISH AND INSTALL BOILER PUMP (BP-1&2). 7. FURNISH AND INSTALL HOT WATER PUMP (HWP-1). FURNISH AND INSTALL HOT WATER PUMP (HWP-1). 8. FURNISH AND INSTALL NEW 4" TANGENTIAL AIR SEPARATOR AND SEDIMENT SEPARATOR. FURNISH AND INSTALL NEW 4" TANGENTIAL AIR SEPARATOR AND SEDIMENT SEPARATOR. 9. FURNISH AND INSTALL NEW FLOOR MOUNTED VERTICAL EXPANSION TANK AS SCHEDULED. FURNISH AND INSTALL NEW FLOOR MOUNTED VERTICAL EXPANSION TANK AS SCHEDULED. 10. EXISTING CHEMICAL SHOT FEEDER TO REMAIN. PIPE UP AS INDICATED. EXISTING CHEMICAL SHOT FEEDER TO REMAIN. PIPE UP AS INDICATED. 11. CONNECT TO EXISTING BUILDING 3" HOT WATER SUPPLY PIPING. CONNECT TO EXISTING BUILDING 3" HOT WATER SUPPLY PIPING. 12. FURNISH AND INSTALL 4" MANIFOLD HOT WATER SUPPLY PIPINGFURNISH AND INSTALL 4" MANIFOLD HOT WATER SUPPLY PIPING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2/19/25
AutoCAD SHX Text
UPDATE DEMOLITION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| 00 41 00 REVISED 2-19-2025 Bid Form.pdf |
| 1. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted. |
| Article 1 – Bidder’s Certification |
| 1.01 Bidder certifies that: |
| A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation; |
| B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; |
| C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and |
| D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D: |
| 1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process; |
| 2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of ... |
| 3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and |
| 4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. |
| Article 2 – Basis of Bid |
| 2.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): |
| 2.02 LUMP SUM BASE BID: |
| 24011 Kedron Pool Boiler - Mods SPECS 012725.pdf |
| 230500 - COMMON WORK RESULTS FOR HVAC |
| 230519 - METERS AND GAGES FOR HVAC PIPING |
| 230523 - GENERAL-DUTY VALVES FOR HVAC PIPING |
| 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT |
| 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT |
| 230700 - HVAC INSULATION |
| 231123 - FACILITY NATURAL-GAS PIPING |
| 232113 - HYDRONIC PIPING |
| 232123 - HYDRONIC PUMPS |
| 235233 Boilers REV Futera III |
| M200 MECHANICAL PIPING SCHEMATIC REV 1 021925.pdf |
| Sheets and Views |
| M200 MECHANICAL PIPING SCHEMATIC |
File details come from the government source that posted it. Updated .