ITB - Lakewood Interconnect Meter New SCE Service (EO-3497)

Closed State & local contract opportunity Posted

Solicitation number
UD-24-213
State
California
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 34
Point of contact

Opportunity details come from longbeachbuys.buyspeed.com. Updated .

About this opportunity

The Long Beach Utilities Department issued an Invitation to Bid on October 1, 2024, for installation of a new Southern California Edison electrical service interconnect meter at the Lakewood Interconnect Facility (EO-3497 / WD-14-24), with bids due October 24, 2024. All bids have been rejected as of November 7, 2024. One bid was received from LEED Electric, Inc., at $338,316, exceeding the estimated project cost of $196,553.

The scope consists of demolishing existing solar panel, battery, and control panel systems; establishing a new 100-ampere, 120/240-volt main service pedestal; and installing underground conduit and pull rope infrastructure to receive power from SCE at 4025 Palo Verde Avenue in Lakewood. The work site is located in Los Angeles County, California.

The contractor must hold either a valid California A General Contractor license or a C-10 Electrical Contractor license at contract award. This is a public works project subject to California prevailing wage requirements under Labor Code Section 1720 et seq., with the 2024-01 prevailing wage rate applying. The contractor and all subcontractors must register with the Department of Industrial Relations. Performance and payment bonds equal to 100 percent of the contract price are required, and bid security of at least 10 percent is mandatory.

The contract period is 90 calendar days after the Notice to Proceed. A pre-bid conference was held October 10, 2024, at the work site. Questions were due October 18, 2024. The contractor may submit certified check, bank draft, or surety bond as bid security. Bids were accepted through the City's online procurement portal at https://longbeachbuys.buyspeed.com/bso/ (keyword WD-14-24).

Contact Joseph Gutierrez at JIG Consultants (714-978-4407, jgutierrez@jigconsultants.com) or Nik Baykal at LBUD (562-570-2347, Nikolas.Baykal@lbutilities.org).

Opportunity text

LBUD intends to receive power from Southern California Edison to power equipment at the existing interconnection between Long Beach and Lakewood. The existing solar panel and battery systems used to operate the Lakewood Interconnect Facility will be removed. Estimated Total = $196,553 Q/A Deadline: October 18, 2024