EO-3497 - Lakewood Interconnect Meter New SCE Service Final Plans - Signed.pdf
PDF 3 MB Posted
- Solicitation number
- UD-24-213
- Issued by
- Los Angeles County, California
About this file
Lakewood Interconnect Meter New SCE Service Project
This is a project design file prepared by the Long Beach Utilities Department for the installation of a new Southern California Edison (SCE) electrical service interconnect meter in Lakewood, California. The project, identified as EO-3497 with MUNIS Project number 6004030011, involves the construction of electrical infrastructure to establish a new 100-ampere, 120/240-volt main service pedestal with associated underground conduit and pull rope installations. The design was completed in June 2024 by JIG Consultants, with approval from the Long Beach Utilities Department under the direction of General Manager Christopher J. Garner and Director of Engineering/Chief Engineer Robert J. Verceles. The project includes five sheets of engineering drawings: a title sheet, general notes and utility legend, electrical symbols and details, an electrical site plan, and an electrical power plan. The site is located on Palo Verde Avenue in Lakewood, with construction notes detailing specific requirements for materials, installation methods, protection requirements, and coordination with existing utilities including Verizon, Edison Company, and Long Beach Energy.
The project specifications require stainless steel construction for the service pedestal and include provisions for concrete pad installation and pavement restoration. Construction notes specify multiple protection and installation requirements including curb and gutter work, cable conduit installation with pull rope, and coordination with existing utility infrastructure. The design incorporates safety provisions for public access, dust control, and traffic management during construction. Coordination requirements are established with Verizon, Southern California Edison, Long Beach Energy, and the Long Beach Fire Department. No specific pricing information, contract award dates, or term details are included in the design document; these details would be contained in separate bid documents and contract agreements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TORRANCE
GARDENA
INGLEWOOD
PALOS VERDES
RANCHO
PROJECT VICINITY
SAN PEDRO LONG
BEACH
SEAL
BEACH
HAWAIIAN
GARDENS
WESTMINSTER
PARK
CARSON
COMPTON
DOWNEY
HUNTINGTON
SANTA FE
SPRINGS
LAKEWOOD
PROJECT LOCATION
LONG BEACH UTILITIES DEPARTMENT
LONG BEACH, CALIFORNIA
ROBERT J. VERCELES
(EXPIRES: DECEMBER 31, 2024)
JOSEPH GUTIERREZ R.C.E. 55604 DATE
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
TITLE SHEET
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 6/6/24
VARIOUS
DESCRIPTIONDATEREV.
EO - 3497
DRAWING / FILE NUMBER:
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LAKEWOOD INTERCONNECT METER
NEW SCE SERVICE
RJO
JOE G.
FI
LE
N A
M E
: M c_ dw g
D E
S
IG
N B
Y
N/A
MUNIS PROJECT: 6004030011
SHEET OF SHEETSDWG.
318 W. KATELLA AVENUE, SUITE A
ORANGE, CA 92867
(714) 978-4407 www.jigconsultants.com
6/6/24
APPROVED BY:
LONG BEACH UTILITIES DEPARTMENT SUBMITTED BY:
JIG CONSULTANTS
VICINITY MAP LOCATION MAP
6/10/24
WD-14-24
9/17/2024
9-18-2024
LaFowle Stamp
LaFowle Stamp
GENERAL NOTES, UTILITY LEGEND, PUBLIC AGENCIES &
UTILITIES, AND SHEET INDEX
SHEET INDEX
SHT # DWG # SHEET TITLE
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE 6/10/24
VARIOUS
DESCRIPTIONDATEREV.
EO - 3497
DRAWING / FILE NUMBER:
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LAKEWOOD INTERCONNECT METER
NEW SCE SERVICE
RJO
JOE G.
FI
LE
N A
M E
: M c_ dw g
D E
S
IG
N B
Y
N/A
MUNIS PROJECT: 6004030011
SHEET OF SHEETSDWG.
318 W. KATELLA AVENUE, SUITE A
ORANGE, CA 92867
(714) 978-4407 www.jigconsultants.com
6/10/24 9/17/2024
9-18-2024
ELECTRICAL SYMBOLS, NOTES AND DETAILS
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE
VARIOUS
DESCRIPTIONDATEREV.
EO - 3497
DRAWING / FILE NUMBER:
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LAKEWOOD INTERCONNECT METER
NEW SCE SERVICE
CHC
LDM
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT:
SHEET OF SHEETSDWG.
318 W. KATELLA AVENUE, SUITE A
ORANGE, CA 92867
(714) 978-4407 www.jigconsultants.com
6004030011
M
100A 2P
20A 1P
20A 1P
5A5A
J
M
9/17/2024
9-18-2024
ELECTRICAL SITE PLAN
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE
VARIOUS
DESCRIPTIONDATEREV.
EO - 3497
DRAWING / FILE NUMBER:
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LAKEWOOD INTERCONNECT METER
NEW SCE SERVICE
CHC
LDM
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT:
SHEET OF SHEETSDWG.
318 W. KATELLA AVENUE, SUITE A
ORANGE, CA 92867
(714) 978-4407 www.jigconsultants.com
6004030011
PALO VERDE AVENUE
9/17/2024
9-18-2024
ELECTRICAL POWER PLAN
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
AS SHOWNSCALE
N/A
CONTRACT NO.
CHECKED BY
DESIGNED BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE
VARIOUS
DESCRIPTIONDATEREV.
EO - 3497
DRAWING / FILE NUMBER:
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LAKEWOOD INTERCONNECT METER
NEW SCE SERVICE
CHC
LDM
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT:
SHEET OF SHEETSDWG.
318 W. KATELLA AVENUE, SUITE A
ORANGE, CA 92867
(714) 978-4407 www.jigconsultants.com
6004030011
9/17/2024
9-18-2024