ITB 25-021 Crystal River Airport (CGC) Fuel Farm Project

Closed State & local contract opportunity

Solicitation number
ITB 25-021
State
Florida
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 38

Updated .

About this opportunity

Citrus County, Florida has issued an Invitation to Bid (ITB 25-021) for a comprehensive fuel farm replacement project at Crystal River Airport, seeking a qualified contractor to remove and replace critical aviation fuel infrastructure. The project requires complete replacement of two 12,000-gallon aviation fuel tanks, sump recovery tanks, pumps, filters, piping, electrical systems, and associated components. Key deliverables include installing an Emergency Fuel Shut-Off (EFSO) system, Scully system, galvanized steel catwalk, electrical generator with transfer switch, utility rack with lighting controls, remote fueling cabinet with card reader, and necessary site improvements. Bidders must demonstrate technical expertise in aviation fuel infrastructure, electrical systems, and complex mechanical installations, with specific qualifications including being registered in Florida and having completed at least three similar projects. The procurement timeline includes a non-mandatory pre-bid conference on January 14, 2025, a deadline for questions on January 24, 2025, bid submissions due on February 18, 2025 at 2:00 PM, and potential board approval and award on March 11, 2025.

The county has established a Disadvantaged Business Enterprise (DBE) utilization goal of 10.65% for this project, encouraging participation from small and minority-owned businesses. The project is jointly funded through the Florida Department of Transportation's Small County Outreach Program (SCOP), with a budgeted amount of approximately $1,808,198. Contractors must provide Payment and Performance Bonds each for 100% of the total contract price, with minimum insurance requirements including $1,000,000 commercial general liability per occurrence, $1,000,000 automobile liability, and workers' compensation insurance compliant with state laws. The contract specifies a project completion timeline of 180 days for substantial completion and 210 days for final completion, with liquidated damages of $2,667 per calendar day of delay beyond the contracted completion time. Bidders must submit comprehensive documentation including certificates of insurance, bid security, qualification statements, subcontractor lists, and various certifications, with the county reserving the right to award the bid in whole or part based on what is deemed most advantageous.

Opportunity text

Citrus County, Florida ("County") invites interested parties to submit a Bid/Quote for Project Title to provide all labor, materials, equipment, tools, transportation, services and incidentals to perform all work necessary for the removal, replacement, and installation of two fuel tanks, at Crystal River airport. This includes, but is not limited to, removal and replacement of two 12,000 gallon aviation fuel tanks, two sump recovery tanks, pumps, filters, piping (relocating existing and new), hoses, reels, coatings, painting, concrete sealing and repairs, electrical lighting power, Emergency Fuel Shut-Off (EFSO), Scully system, galvanized steel catwalk, electrical generator system included transfer switch and enlarged platform, utility rack with lighting controls and panels, remote fueling cabinet, card reader, asphalt patching, and other work incidental to the completion of this project. All Work shall be in accordance with the construction drawings, specifications, and Contract Documents. The Successful Bidder shall adhere to all permit(s) requirements, and all Federal/FAA, State, and Local Laws/Rules/Codes as applicable to this Project. The Successful Bidder will be responsible for all Permitting.