IFB-CON-DWM-2502-1250143, Valley of the Hawks Constructed Wetlands
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66062-NONST-2025-000000222
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 27112305 Metal markers or holders
- 30111510 Pipeline protection concrete mattress
- 72141126 Underground utilities construction service
- 83100000 Utilities
- 20143304 Intelligent pigs
- 40175407 Pipeline spheres
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 81102400 Electrical power transmission engineering
Show all 47
- 83101800 Electric utilities
- 70171607 Water pricing services
- 83101604 Gas pipeline services
- 83101801 Supply of single phase electricity
- 40175401 Pipe stoppers
- 78101718 Offshore supply vessel service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 83101601 Supply of natural gas
- 83101603 Oil pipeline services
- 83101802 Supply of two phase electricity
- 83101803 Supply of three phase electricity
- 55121737 Pipe identification marker
- 40175400 Pipe support
- 20121459 Wireline entry guide
- 20123206 Swellable packer
- 20143305 Pig signalers
- 40175402 Pipeline launch/receive traps
- 40175403 Quick opening closures
- 40175404 Pipeline support bags
- 40175405 Spring hanger
- 40175406 Pipe support hangers
- 40175408 Pipeline inflatable spheres
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 83101500 Water and sewer utilities
- 83101600 Oil and gas utilities
- 83101510 Chilled water
- 83101602 Supply of fuel oil
- 83101605 Gas facility charge
- 83101804 Electric power transmission services
- 83101805 Industrial electric power distribution
- 83101806 Rural electrical power distribution
- 83101807 Municipal electric power distribution
- Point of contact
-
- Stephanie Rucker srucker@atlantaga.gov (470) 218-0427
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Atlanta's Department of Procurement (DOP), acting on behalf of the Department of Watershed Management (DWM), is seeking qualified contractors for the Valley of the Hawks Constructed Wetlands project through Invitation for Bid (IFB) number CON-DWM-2502-1250143. The procurement aims to transform a vacant, overgrown site into a comprehensive ecosystem and infrastructure solution for storm-water management. Specific project objectives include capturing storm-water from a 150-acre drainage basin, diverting water from the combined sewer system, reducing flooding and sewer overflows in the English Avenue and Bankhead/Westin Heights neighborhoods, and creating a community green space. The project will involve constructing wetlands with vegetation designed to remove pollutants, improve water quality in Proctor Creek, and include walking paths, overlooks, and signage. A pre-bid meeting is scheduled for Thursday, April 17, 2025, from 2:30 PM to 3:30 PM Eastern Time, with bid responses due by May 12, 2025. Contractors will need to demonstrate expertise in environmental infrastructure, ecological restoration, and community development projects.
While specific set-aside designations or disadvantaged enterprise requirements are not explicitly detailed in the provided documentation, the project appears to be located in Fulton County, Georgia, potentially offering opportunities for local and regional contractors. The project represents a significant urban infrastructure and environmental restoration initiative with potential substantial investment, though precise budget ranges are not specified in the current procurement notice. The constructed wetlands project connects to broader urban development goals, including potential integration with the Westside Beltline, suggesting a comprehensive approach to urban ecological and infrastructure planning. Prospective bidders should be prepared to demonstrate technical capabilities in storm-water management, ecological design, and community infrastructure development. The project's multifaceted nature implies a complex procurement process that will likely evaluate contractors based on technical expertise, environmental design capabilities, and community engagement strategies.
Opportunity text
The City of Atlanta's Department of Procurement ("DOP") on behalf of the Atlanta Department of Watershed Management ("DWM"), is seeking qualified contractors to transform a vacant, overgrown eyesore into a thriving ecosystem that will serve as both critical infrastructure and an attractive natural community amenity, connecting to the surrounding neighborhood and eventually to the Westside Beltline. The project is designed to capture storm-water from a 150-acre drainage basin and divert it out of the combined sewer system, providing significant combined sewer capacity relief that will reduce flooding and sewer overflows in the English Avenue and Bankhead/Westin Heights neighborhoods. The constructed wetland vegetation will remove pollutants, improving water quality in downstream Proctor Creek, and the site will serve as a new community green space with walking paths, overlooks and signage. Thu, Apr 17, 2025 2:30 PM - 3:30 PM (UTC-05:00) Eastern Time (US & Canada)
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity