27-017-Abernathy Greenway Southside Improvements (Re-bid)
Open State & local contract opportunity Posted
- Solicitation number
- PE-66098-NONST-2027-000000157
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90976 Site Work
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91226 Construction, Hike And Bike Trail
- 91227 Construction, Irrigation System
- 91345 Construction, Sewer And Storm Drain
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91356 Construction, Utility/Underground Projects
- 98852 Landscaping (Including Design, Fertilizing, Planting, Etc., But Not Grounds Maintenance Or Tree Trimming Services)
- Point of contact
-
- Connie Donley cdonley@sandyspringsga.gov (770) 206-1467
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Sandy Springs, Georgia is soliciting bids under ITB 27-017 for the Abernathy Greenway Southside Improvements, with a non-mandatory pre-bid conference on November 19, 2026 at 1:30 p.m. Eastern via Teams and bids due January 5, 2027 at 2:00 p.m. Eastern through the Bonfire Portal. Questions are due December 10, 2026 at 5:00 p.m.
The project transforms a Sandy Springs greenspace park into an accessible, environmentally sensitive community destination. Scope includes erosion control, site preparation, selective clearing, demolition, grading, trails, storm drainage, stream restoration, best management practices (BMPs) and water quality measures, hardscape, site furnishings, irrigation, landscape planting, relocation and installation of sanitary sewer line, and construction of a landscape storage facility. Grant compliance requires approximately 500 linear feet of stream bank stabilization, approximately 500 linear feet of stream buffer restoration, two years of BMP maintenance, quarterly BMP inspections, water quality monitoring and load reduction modeling, two education signs, and quarterly and close-out reports under a Georgia Environmental Protection Division (EPD) 319(h) grant. Work must meet GDOT specifications, Fulton County sewer standards, and City of Atlanta watershed management specifications.
Bidders submit four separate fixed-fee lump-sum proposals: the Base Bid (Long Acres Drive to Wright Road), Bid Alternate #1 (sanitary sewer improvements), Bid Alternate #2 (two-year landscape maintenance), and Bid Alternate #3 (Wright Road to project limits). Unit prices are required for each bid item. A bid bond equal to 5% of the combined Base Bid, Alternate #1, and Alternate #2 totals is required for bids over $100,000. Award goes to the lowest responsive and responsible bidder.
Substantial completion is due within 270 calendar days for the Base Bid, 300 days if Alternate #1 is accepted, and 360 days if Alternates #1 through #3 are accepted. Work must begin within ten calendar days of Notice to Proceed. Liquidated damages are $500 per calendar day for delays beyond the substantial completion deadline. Work hours are 8:00 a.m. to 5:00 p.m., Monday through Friday. Under the Special Provisions, the Contractor assumes redesign costs for approved substitutions, and the Owner may back-charge for shop drawing reviews beyond two submissions.
Opportunity text
The Abernathy Greenway Southside Improvement Project in Sandy Springs, Georgia, is a comprehensive improvement initiative designed to transform the greenspace park property into an accessible, environmentally sensitive, and community-focused destination. The project scope of work includes but is not limited to the installation of erosion control measures, site preparation, selective clearing, demolition, grading, installation of new infrastructure including trails, storm drainage, stream restoration, BMP and water quality measures, walks, nature preserve area, hardscape, site furnishings, irrigation, landscape planting, and the relocation and installation of sanitary sewer line, and the construction of a landscape storage facility.
Files
| File | Type | Posted |
|---|---|---|
| 27_017_ITB_Abernathy Greenway Southside Impro.pdf | ||
| Special Provisions.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity