Pre-Solicitation Notice for a Future Design Build

Open State & local contract opportunity Posted

Solicitation number
PE-77050-NONST-2027-000000112
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Cobb County Water System is issuing a pre-solicitation notice for progressive design-build services to expand the South Cobb Water Reclamation Facility in Austell, Georgia, with the RFP scheduled for release January 8, 2027 and responses due February 25, 2027. Proposers and their key firms must be licensed in Georgia. The design-builder must hold a valid Georgia Utility Contractor License and/or Georgia Commercial General Contractor License, and the Engineer of Record must be a Georgia-licensed Professional Engineer.

The project expands the facility from 40 million gallons per day (MGD) maximum month flow to 50 MGD and addresses infrastructure rehabilitation and compliance with the November 2025 Georgia EPD Wasteload Allocation WLA000309, which sets substantially tighter effluent targets for the 50 MGD operation. Proposers must demonstrate capacity to obtain 100% performance and payment bonds. The county is considering Alternative A11.3 (4-Stage Bardenpho with Deep Bed Conventional Filters) and Alternative A14.2 (5-Stage Bardenpho with flat plate membranes), while remaining receptive to innovative solutions that meet or exceed project goals. A significant constraint is obtaining subsurface approvals and easements from Fulton County and the Federal Aviation Administration to route utilities under restricted Fulton County Airport property.

Delivery follows a two-phase progressive design-build method. Phase One covers site investigations, preliminary engineering, design development, and preconstruction services, and ends with a proposed price, schedule, and Guaranteed Maximum Price (GMP) based on 60% design completion. Phase Two, contingent on Owner approval, covers final design, construction, and commissioning.

The estimated project budget is $300 million to $400 million, with the final GMP dependent on final process design and value engineering during Phase One. The county will use a single-step, best-value selection process, evaluating technical qualifications and cost proposals concurrently. Responses must be submitted electronically through the county's eProcurement Portal. No inquiries will be accepted until the RFP is issued in January 2027, at which point a formal Q&A process opens on the OpenGov portal. The facility serves southwestern Cobb County and portions of Douglas and Paulding Counties, with flows projected to reach current capacity around 2031.

Opportunity text

This is a pre-solicitation notice only.

Files

File Type Posted
Pre_Solicitation.pdf PDF
South Cobb WRF Facility Plan.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors