Heating, Ventilation, and Air Conditioning Services
Closed State & local contract opportunity Posted
- Solicitation number
- RFP 27-02
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Regina Rosenello, Esq regina.rosenello@stockton.edu (609) 652-4325
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Stockton University's Office of Procurement & Contracting is requesting proposals for heating, ventilation, and air conditioning services on an as-needed basis across five New Jersey campus locations (Galloway, Atlantic City, Hammonton, Manahawkin, and Woodbine), with proposals due October 15, 2026 at 2:00 p.m. and a pre-proposal meeting on September 18, 2026 at 10:00 a.m.
The scope encompasses general service, installation, repair, disposal, and maintenance for a comprehensive range of HVAC and related mechanical equipment, including pipe work (torching, cutting, welding, soldering, brazing, pro-press), all duct-system types, geothermal components, rooftop units, boilers, furnaces, burners, heat exchangers, air conditioners, refrigerant lines, split systems, heat pumps, terminal units, building management systems, pneumatic controls, chillers, cooling towers, water and gas piping, compressors, humidification and dehumidification systems, variable-frequency drives, variable-air-volume systems, mechanical insulation, and exhaust fans. The majority of services are anticipated at the Galloway campus.
The contractor must have a minimum of five years' experience, hold appropriate licenses and certifications, provide a Commercial Food Service Equipment Association Certified Technician, maintain 24/7/365 availability with response times of six hours for non-emergency requests and two hours for emergency requests, and carry comprehensive insurance including workers' compensation and general liability of $2 million per occurrence plus excess/umbrella coverage of $10 million. Compensation is structured as hourly rates for journeymen and foremen under New Jersey Prevailing Wage Act requirements, with annual adjustments over a three-year contract period (one-year initial term plus two optional one-year renewals). Material costs are charged at contractor cost plus a maximum percent markup fixed across all contract years. All costs are all-inclusive; no additional fees are permitted unless approved for specialized equipment not reasonably foreseeable. Questions are due September 24, 2026. The University reserves the right to terminate for convenience with thirty days' notice and will award to the single vendor deemed most advantageous considering price and other factors.
Opportunity text
SCOPE OF SERVICES A. The scope of work performed under this RFP shall be for heating, ventilation, and air conditioning services on an as-needed basis. The HVAC services may be associated with, but are not limited to, mechanical systems, oil and gas burners, boilers, mechanical insulation, fire suppression systems, mechanical sheet metal, and dust collection systems. B. The Contractor shall provide general service, installation, repair, disposal, and maintenance for a wide array of HVAC and related equipment. Services under this RFP may be performed but are not limited to the below is a list of HVAC equipment and categories. The list is for illustrative purposes only, and is not intended to be exclusive, or limiting. 1. All pipe work, including Torching, Cutting, Welding, soldering, brazing, pro-press 2. Duct Systems, all types including Sheet Metal work, Fiberboard, Fiberglass and Flexible Ducts 3. Geothermal components 4. Air Handler Roof-Top-Unit (RTU) all components including detectors, freeze-stats, etc. 5. Roof Curbing 6. Weather proofing outside units 7. Concrete pads for HVAC system components, such as air condensers 8. Oil/Gas Boilers 9. Oil/Gas Furnaces 10. Oil/Gas Burners 11. Blower motors 12. Heat Exchangers 13. Air Conditioners 14. Refrigerant Lines including refrigerant. 15. Split Systems 16. Heat pumps 17. Terminal Units 18. Balancing water flow 19. Balancing Air Flow 20. Flow Metering 21. Building Management Systems (BMS) 22. Pneumatic controls 23. Thermostats 24. Condensate lines including pumps. 25. Economizers 26. Expansion Valves 27. Evaporator 28. Condensers 29. Chillers 30. Cooling Towers 31. Hot/Cold water coils 32. Hot/Cold water piping 33. Gas Piping including in line components 34. Compressors 35. Boiler systems 36. Humidification 37. Dehumidification 38. Variable Frequency Drives (VFD) 39. Variable-Air-Volume (VAV) systems 40. Duct (Mechanical) Insulation 41. Pipe (Mechanical) Insulation 42. Duct collection 43. Exhaust Fans 44. Strobic Fans 45. Ice Machines 46. Environmental Chambers 47. Fume Hoods 48. Reheats 49. Return/Supply Registers 50. Filters 51. Louvers/Dampers 52. All miscellaneous fittings, flow/temperature sensors, valves, devices, and hardware 53. Testing/startup/training 54. Perimeter Heating 55. All HW/CW Return and supply lines 56. Booster Pumps
Files
| File | Type | Posted |
|---|---|---|
| stockton RFP27-02HVACServices-Document.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity