Hardaway HS Rear Entry Drive Upgrade
Closed State & local contract opportunity Posted
- Solicitation number
- PE-55046-NONST-2027-000000026
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdictions
- NIGP code
- UNSPSC codes
- 72121406 School building construction service
- 95121905 Language laboratory
- 95121907 Meteorological station
- 95121901 Polytechnic school
- 95121903 Lecture theater
- 72121409 Public library construction
- 95121909 Elementary school
- 95121902 Vocational college
- 95121900 Educational and research buildings and structures
- 95121911 High school
- Point of contact
-
- Raymond Carrion carrion.raymond@muscogee.k12.ga.us (706) 392-0667
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Columbus City Schools is requesting proposals for a Construction Manager at Risk (CM) for the Hardaway High School Rear Entry Drive Upgrade project under an RFP, with proposals due September 22, 2026 and substantial completion required by June 30, 2027.
The scope encompasses sitework construction including paving, retaining walls, and utility work; minor interior construction; ADA compliance improvements; and local ordinance compliance work. The CM will provide cost estimating, constructability analysis, scheduling, phasing, and value engineering services, working collaboratively with the School District and Project Engineer to finalize project phasing, scheduling, and cost optimization. Construction may proceed concurrently with final design refinement.
The project will be performed under the AIA A133-2019 Standard Form of Agreement with compensation based on the cost of work plus a fee, subject to a guaranteed maximum price. No budget range or contract value is stated in the solicitation materials.
The RFP document (597 KB) is attached. No evaluation criteria, set-asides, preferences, pre-bid meeting, or question deadline are specified in the posted information.
Opportunity text
We are seeking to engage a construction General Contractor as a Construction Manager. The Project is to be performed pursuant to the AIA A133-2019 Standard Form of Agreement with payment based on the cost of work, plus a fee and with a guaranteed maximum price. The successful proposer (the Construction Manager at Risk (CM)) shall serve as the contractor and construction manager for the Project. The Project may include all typical sitework construction, including paving, retaining walls and work to utilities; and there may be some minor interior construction required, as well as ADA compliance work and local ordinance compliance work. The services will consist of cost estimating, constructability analysis and scheduling and phasing of the work and construction, which may proceed concurrently. The Construction Manager (CM), will assist the School District and Project Engineer in finalizing the phasing and scheduling of the work, cost estimating and value engineering of the Project. Substantial Completion shall occur before June 30, 2027.
Files
| File | Type | Posted |
|---|---|---|
| RFP Hardaway HS Rear Entry Drive Upgrade.pdf |