SRF Water System Upgrades
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-04
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 890 Water Supply, Groundwater, Sewage Treatment, And Related Equipment, Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water
- 91063 Public Utilities: Water, Sewer And Gas Maintenance And Repair
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91356 Construction, Utility/Underground Projects
- 96185 Utility Services, Water
- UNSPSC codes
- 72141126 Underground utilities construction service
- 83100000 Utilities
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 83101802 Supply of two phase electricity
- 83101601 Supply of natural gas
- 83101603 Oil pipeline services
- 83101803 Supply of three phase electricity
- 31250000 Pneumatic and hydraulic and electric control systems
- 72141111 Gas main construction service
Show all 33
- 72141114 Pipeline wrapping service
- 72141113 Oil and gas pipeline construction service
- 81102400 Electrical power transmission engineering
- 83101800 Electric utilities
- 70171607 Water pricing services
- 83101604 Gas pipeline services
- 83101801 Supply of single phase electricity
- 30121722 PE rainwater and sewer separation walls
- 72140000 Heavy construction services
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 83101500 Water and sewer utilities
- 83101600 Oil and gas utilities
- 83101510 Chilled water
- 83101602 Supply of fuel oil
- 83101605 Gas facility charge
- 83101804 Electric power transmission services
- 83101805 Industrial electric power distribution
- 83101806 Rural electrical power distribution
- 83101807 Municipal electric power distribution
- Point of contact
-
- Jason Laurenza jlaurenza@greencovesprings.com (904) 297-7036
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Doral, Florida is issuing a Request for Qualifications (RFQ) for general planning and zoning consulting services to be provided on an on-call, as-needed basis. The procurement seeks to establish a minimum pool of qualified planning consultant firms to support various municipal planning functions including staff augmentation during surge capacity periods, executive and director-level advisory support, Comprehensive Plan implementation, Land Development Code updates and modernization, development review and entitlements processing, quasi-judicial hearing support, annexation services, and special planning projects as directed by the Planning and Zoning Director. Respondents must meet minimum qualifications including five consecutive years of active engagement in planning and zoning consulting services to local, regional, or state governments; at least one principal planner holding AICP certification with five years of experience; five years of consecutive operation in Florida; and demonstrated financial stability, adequate equipment, and sufficient organizational capacity to execute services. The RFQ was advertised on February 10, 2026, with a non-mandatory pre-submittal conference scheduled for February 24, 2026 at 10:00 AM via Microsoft Teams; written questions are due by March 3, 2026 at 5:00 PM; and sealed proposals must be submitted electronically through the OpenGov Procurement Portal by March 11, 2026 at 2:00 PM. The evaluation committee will convene on March 18, 2026 at 10:00 AM at the City of Doral Government Center. Proposals will be evaluated on four weighted criteria: Experience and Qualifications of Firm and Team (25 points), Key Personnel Qualifications (25 points), Understanding of Scope of Services (40 points), and References and Track Record (10 points), for a total of 100 possible points. The initial contract term is one year with options to renew for two additional one-year periods, for a potential total contract duration of three years, with contract execution required within thirty days of City Council notification of award.
No set-aside designations for disadvantaged enterprises are specified in the RFQ documentation. Respondents must submit extensive documentation including audited financial statements for the past three fiscal years, five client references with contact information, a completed Bidder Qualification Statement, organizational charts, detailed project narratives, proof of occupational licenses and certifications, and multiple affidavits addressing non-collusion, conflicts of interest, and foreign entity compliance. Successful proposers must maintain Commercial General Liability insurance of $1,000,000 per occurrence with $2,000,000 general aggregate, Professional Liability/Errors and Omissions coverage of $2,000,000 per claim and policy aggregate, Automobile Liability insurance of $1,000,000 combined single limit, and Workers' Compensation coverage at statutory limits. No incumbent vendor or current contractor is identified in the RFQ. The City does not guarantee a minimum volume of work and reserves the right to select multiple firms, reject all proposals, or modify the scope at its discretion; compensation terms and hourly rate structure will be determined by the City based on individual work orders, with no specific contract budget or award value disclosed in the procurement documents. The award will be made to a minimum pool of qualified firms deemed most advantageous to the City, subject to City Council approval, in accordance with Florida Statute 287.055 (Consultants Competitive Negotiation Act).
Opportunity text
2 versions
Update #2 · Latest ·
BASE BID
- Remove and replace two Jockey and three High Service (HS) Pumps to increase available service
pressure to Magnolia Point. Revised design points are summarized as follows:
• Jockey Pumps: 400 gpm @ 196 ft (TDH) | 85 psig
• HS Pumps: 1,200 gpm @ 196 ft (TDH) | 85 psig
- Magnolia Point Loop Control Station 1 and Station 2 valving modifications to remove existing hydraulic
control valves with motor-operated butterfly valves.
- Harbor Road Elevated Storage Tank (EST) hydraulic altitude valve removal and replacement with
motor operated butterfly valves.
- Associated electrical and instrumentation improvements.
- Bonaventure EST Improvements: Hydraulic altitude valve removal and replacement with motoroperated butterfly valves.
ADDITIVE ALTERNATE 1
- Harbor Road WTP and Magnolia Point Control Valve Improvements: Construct 200,000-gallon Ground
Storage Tank 3 (GST 3) with conventional tray aerator to increase the storage capacity to 600,000
gallons.
ADDITIVE ALTERNATE 2
- Construct two 10,000-gallon hydropneumatic tanks (Hydro Tanks) with air compressor.
Update #1 ·
The City of Doral is seeking Responses for planning consultant firms to provide general planning and zoning consulting services.