The state and local contract opportunity is for the replacement of 73 dry sprinkler pendants on one residential unit at the Jack Mabley Developmental Center, which is operated by the Illinois Department of Human Services (IDHS). The project specifications outline the required product details, including manufacturer, series, temperature rating, response type, and dry sprinkler functionality. The work must be completed by a licensed sprinkler contractor and is subject to the Prevailing Wage Act. Attendance at a mandatory pre-bid onsite meeting is required, and the winning bidder must provide a performance bond and comply with the center's health and safety protocols, including temperature checks and face mask/shield requirements. Bids submitted for this project are considered "not to exceed" the stated dollar amount, and the winning vendor must provide a 12-month warranty on the work performed and a 24-month warranty on the installed units. IDHS reserves the right to adjust the bid due date and time as needed, and the winning bidder must comply with all center policies while onsite and schedule the work during the center's hours of operation, with approval from the center's engineer.
This contract opportunity does not appear to have any set-aside designations or restrictions on the types of organizations that can respond. The procurement documents do not provide details on any incumbent vendors or current contractors, or any existing infrastructure or technology that requires integration. The procurement documents also do not include any information on possible award values or budget ranges.
Opportunity text
Sprinkler system dry pendant head replacement project
Files
| File | Type | Posted |
|---|---|---|
| FY22 Sprinkler Pendant Replacement Project Specifications.pdf | ||
| Mandatory Onsite Visit Guidance for Vendors~65.docx | DOCX document | |
| Notice concerning additional Covid~45.docx | DOCX document | |
| RMU50~82.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity