This document provides mandatory onsite visit guidance for vendors participating in a contract opportunity with the Illinois Department of Human Services (IDHS). All vendors must follow strict health and safety protocols, including temperature checks, health screenings, and wearing face masks and shields provided by IDHS. Vendors who do not comply with these requirements will not be permitted to attend the mandatory onsite visit and will be disqualified from the bidding process. IDHS will provide one opportunity for vendors denied access to reschedule the mandatory conference within the next two business days with a different representative. Bidders who do not attend, are not on time, leave early, or fail to sign the attendance sheet will be considered non-responsive and disqualified.

The document does not provide details on the specific products or services being procured, response due dates, award information, or contract terms. Pricing, set-asides, incumbent information, and funding details are also not included.

View the file

Other files

File Type Posted
FY22 Sprinkler Pendant Replacement Project Specifications.pdf PDF
Notice concerning additional Covid~45.docx DOCX document
RMU50~82.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANDATORY ONSITE VISIT GUIDANCE FOR VENDORS:

1. Vendors must allow adequate time prior to the conference to allow for proper screening of all people coming onto the property.

2. All vendors must follow social distancing guidelines-- Stay at least 6 feet (about 2 arms’ length) from other people and do not gather in groups

3. All vendors will be required to get their temperature taken at the check point, as designated by each Center.

Center Checkpoint is : Chief Engineer’s Office Vendors with a temperature more than 100.0 degrees will not be admitted.

4. All Vendors will be asked a series of questions about their health. If the vendor displays any symptoms on the checklist, the vendor will not be allowed entry to the Center.

5. All vendors must wear a face mask (KN95) and a face shield, which will be furnished to them upon arrival. Vendors may choose to wear their own mask or face shield. If vendors opt to bring their own, the mask must cover their nose and mouth and fit under their chin; the shield must cover the nose down to the chin. Vendor must wear the face mask and shield while on Center's grounds. Face shields provided by the Center are required to be returned to the checkpoint upon leaving the Center.

In the event vendor is denied access due to any of the above reasons, IDHS will allow vendor one opportunity to reschedule the mandatory conference in the next 2 business days with a different representative. This alternate date will only be made available to vendors who were present at the first vendor conference but not permitted to participate by IDHS.

Bidder (current Vendor included) will be disqualified and considered non-responsive if Bidder does not attend, is not on time, leaves early or fails to sign the attendance sheet. Bidder must allow adequate time to accommodate security screenings at the site.

Please continue to monitor BidBuy as the Bid Due date and time may be adjusted.