FY 2022-2023 LMIG for Roadway Resurfacing
Closed State & local contract opportunity Posted
- Solicitation number
- PE-74250-NONST-2024-000000002
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Ashburn, Georgia is seeking bids for the FY 2022-2023 LMIG for Roadway Resurfacing project. The work consists of milling, base repair, resurfacing, and striping of approximately 0.21 miles of roadway. Sealed bids will be received until 11:00 A.M. on Tuesday, January 9, 2024, at which time they will be publicly opened and read. Any contractor submitting a bid must be a pre-qualified Georgia Department of Transportation Contractor, and the contractor's license number must be clearly shown on the bid envelope. The project has a 120 consecutive calendar day construction schedule. The bid package can be obtained from the Engineer, Watkins & Associates, LLC, for a non-refundable fee of $300 per set. All bids must be accompanied by a Bid Bond in an amount not less than 10% of the bid amount. The successful bidder will be required to furnish a Performance Bond and Payment Bond, each in the amount of 100% of the contract amount.
The project will be funded by a grant from the Transportation Investment Act, Local Maintenance & Improvement Grant (LMIG) or local funds. The Owner reserves the right to reject any or all bids and to waive informalities. There are no set-aside designations or restrictions on the types of organizations that can respond. The current incumbent contractor is unknown. The budget range for this project has not been disclosed.
Opportunity text
FY 2022-2023 LMIG for Roadway Resurfacing will be received, by City of Ashburn, at the City Hall of Ashburn, P.O. Box 766, 259 East Washington Avenue, Ashburn, GA 31714, until 11:00 A.M., Tuesday, January 9, 2024, local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The work to be done shall consist of furnishing all labor, materials, and equipment necessary to construct the proposed FY 2022-2023 LMIG for Roadway Resurfacing as shown on the construction drawings. In general, construction consists of milling, base repair, resurfacing and striping of approximately .21 miles of roadway and all associated measures for the complete project. This work will be awarded in one (1) contract with a 120 consecutive calendar day construction schedule.
Files
| File | Type | Posted |
|---|---|---|
| Ashburn FY22_23 LMIG _ Advertisement for Bids.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity