FPS 2023 Bond - BP#8 Twain, Dooley and Salk Renovations
Closed State & local contract opportunity Posted
- Solicitation number
- RFP FRA 260000002596 2
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- 72152904 Exterior metal wall system installation service
- 72151201 HVAC mechanical construction service
- 72151204 HVAC ventilation and duct work construction service
- 72151206 HVAC heating system construction service
- 72151003 Heating system maintenance and repair service
- 72151004 Hydronics heating system maintenance and repair service
- 72151203 HVAC solar energy construction service
- 72151205 HVAC refrigeration construction service
- 72151200 Heating and cooling and air conditioning HVAC construction and maintenance services
- 72151202 HVAC process piping construction service
Updated .
About this opportunity
Fraser Public Schools is soliciting bids for the FPS 2023 Bond - BP#8 Twain, Dooley, and Salk Renovations project across three school buildings in Fraser, Michigan, with proposals due September 30, 2026 at 12:00 PM (extended by Addendum #1 from the original September 8 deadline).
Bidders with an Experience Modification Rate greater than 1.0 are ineligible. Prevailing wage rates do not apply. Bid security of 5% of base bid is required, payable by a Michigan-authorized surety.
The scope covers comprehensive mechanical, electrical, and plumbing system upgrades; HVAC replacements; roofing work; PA and card reader installations; and structural modifications across Twain, Dooley, and Salk Elementary Schools. Deliverables include equipment replacement — boilers, pumps, variable frequency drives, air handling units, and roof-top units — with phased construction spanning June 2027 through August 2027. Bidding is divided into four trade categories: General Trades, Mechanical, Electrical, and Roofing.
Mandatory pre-bid conferences and site visits are scheduled for September 9, 2026 (Mechanical and Electrical at 7:00 AM) and September 10, 2026 (General Trades and Roofing at 7:00 AM), both at Salk Elementary School, 17601 15 Mile Road, Clinton Township, Michigan. Electronic bids are submitted via BuildingConnected with a public bid opening on September 22, 2026 at 12:00 PM. Bidding documents dated June 22, 2026, are available beginning September 8 through Barton Malow Builders' site office, BuildingConnected, and CAM/Plan rooms. Addendum #2, scheduled for release September 23, will include pre-bid RFI responses, a structural steel package, and scope clarifications.
Successful bidders must furnish Performance Bond, Payment Bond, and Certificates of Insurance. The contract will be executed under AIA Document A132-2019. Bid prices must remain firm for 90 days following receipt. State sales and use taxes must be included in all bids. Barton Malow Builders is the project manager; Wakely Associates Architects provides design services.
Files
| File | Type | Posted |
|---|---|---|
| BP #8 Twain, Salk, and Dooley Reno - Addendum #1.pdf | ||
| BP8 Long Form Ad-for-bid.pdf |