Fort valley wastewater treatment plant effluent pipe construction
Closed State & local contract opportunity Posted
- Solicitation number
- PE-33552-NONST-2026-000000020
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 07531 Grinders, Cylinder Hone And Valve Seat; Portable Boring Machines; Hones; And Boring Bars
- 89064 Sewer Inspection Equipment
- 91216 Boring, Drilling, Testing, And Soundings, Including Concrete Coring
- 91242 Drilling And Boring Services, Horizontal Directional (Hdd And Hdb)
- 91345 Construction, Sewer And Storm Drain
- UNSPSC codes
- 23241601 Boring tool
- 71121311 Permanent downhole gauges service
- 25191715 Brake shoe grinder
- 20111610 Sewer inspection machinery
- 71121647 Offshore underbalanced drilling services
- 71161112 Cuttings re-injection service
- 71161213 Wellbore survey service
- 72154006 Core drilling and cutting service
- 73181009 Tapping services
- 73181007 Boring services
Show all 20
- 72141123 Manhole construction service
- 22101909 Slurry tunnel boring machine
- 25191733 Piston grinder
- 71121642 Drilling optimization services
- 71121646 Logistics base services
- 72141201 Caisson drilling service
- 72154008 Diamond drilling and sawing service
- 73181008 Drilling services
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- Point of contact
-
- Tara Giles tgiles@fvutil.com (478) 825-7701
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Fort Valley Utility Commission is requesting proposals for design and construction of approximately 4,000 linear feet of 20-inch fusible PVC effluent pipe for a new wastewater treatment plant, with proposals due July 3, 2026 at 2:00 PM EST. Firms must request the proposal package via email to Tara Giles at tgiles@fvutil.com and be added to the official List of Proposers prior to the deadline; proposals from unlisted entities will not be accepted.
The scope includes approximately 6 feet of depth installation using open cut and jack & bore construction methods, with approximately 185 linear feet bored under a Norfolk Southern railroad line and encased within a 30-inch steel casing pipe. The railroad bore will be performed approximately 6 feet below normal grade and 24 feet below the rail base, requiring excavation of a 40-foot launching pit and 15-foot receiving pit. The project also includes manholes, erosion control, and all ancillary items for complete effluent pipe installation.
The Fort Valley Utility Commission will evaluate proposals using both quantitative cost factors and qualitative non-cost factors according to weightings outlined in the Proposal Requirements document. Award is anticipated within 60 days of selection. The procurement adheres to ARPA Federal Funding guidelines and all applicable federal, state, and local laws. The Commission reserves the right to accept or reject any or all proposals and waive formalities and technicalities in its best interest.
Proposals must be mailed or hand-delivered to Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, Georgia 31030, with the envelope sealed and marked "RFP for Fort Valley Wastewater Treatment Plant Effluent Pipe Construction."
Opportunity text
The Fort Valley Utility Commission is seeking a highly qualified company to design and build approximately 4,000 LF of 20¿ fusible PVC effluent pipe discharging from a new wastewater treatment plant using open cut and jack & bore methods and manholes. The effluent pipe will be installed approximately 6' below grade. Approximately 185 LF of the new pipe will be jack & bored under a railroad owned by Norfolk Southern. The bored pipe will be encased within a 30" steel casing pipe and will be bored approximately 6' below normal grade and 24' below the base of the rail. A 40' launching pit and a 15' receiving pit will be dug to perform the jack & bore. The project will also include erosion control and all other ancillary items for a complete effluent pipe installation.Proposal packages may be requested via email and should be directed to Tara Giles at tgiles@fvutil.com. Upon request of a proposal package, the submitting firm will be added to the ¿List of Proposers¿. Proposals will not be accepted from entities not listed on the ¿List of Proposers¿ prior to the due date. The complete proposal package includes the Request for Proposals, Proposal Requirements and Proposal Information Sheet. Submitted proposals shall follow the guidelines outlined in the proposal package. Proposals will be received at Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030 until July 3 @ 2:00 PM EST. No proposals will be accepted after this timeProposals should be mailed to: Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030 OR Hand Delivered (Prior to due date/time) to: Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030. Proposal Envelope should be sealed and marked: RFP for Fort Valley Wastewater Treatment Plant Effluent Pipe ConstructionFactors to be considered in making this award, if awarded, include consideration of both quantitative
Files
| File | Type | Posted |
|---|---|---|
| FVUC Effluent Pipe Addendum _1 Package.pdf | ||
| FVUC Addenum1 (1).pdf | ||
| VOL 3_Price Proposal Forms.pdf | ||
| Request for Proposals Advertisement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity