FVUC Effluent Pipe Addendum _1 Package.pdf
PDF 215 KB Posted
- Solicitation number
- PE-33552-NONST-2026-000000020
- Issued by
- Paulding County, Georgia
About this file
This addendum to the Fort Valley Utility Commission's design-build procurement modifies the proposal submission timeline for the Effluent Pipe from Highway 49 to Mossy Creek project. The original proposal due date of July 3, 2026 at 2:00 PM has been extended to July 9, 2026 at 2:00 PM. The project involves design and construction of approximately 4,000 linear feet of 20-inch fusible PVC effluent pipe installed at approximately 6 feet below grade, with approximately 185 linear feet bored under a Norfolk Southern railroad line within a 30-inch steel casing pipe at 24 feet below the rail base. The scope includes excavation of 40-foot launching and 15-foot receiving pits, as well as manholes, erosion control, and all ancillary items for complete installation. All bidders must acknowledge receipt of all addenda in writing with their proposal submission and verify receipt prior to submission.
The addendum revises Form TP-1 of Volume II to request State Utility Contractor License Number rather than State Contractor License Number. Bidders must submit comprehensive technical proposals including 18 required forms addressing team organization, project understanding, relevant experience, key personnel, project approach, CPM schedule, resource loading plans, risk management, quality management, safety programs, financial capacity, references, schedule commitment certification, and ARPA experience certification. The proposal package must demonstrate substantial completion by September 30, 2026 and final billing by October 31, 2026. All proposals must be mailed or hand-delivered to Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, Georgia 31030, with sealed envelopes marked accordingly. The project is federally funded under ARPA guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VOL 3_Price Proposal Forms.pdf | ||
| FVUC Addenum1 (1).pdf | ||
| Request for Proposals Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
PROJECT: Design-Build Services Effluent Pipe from Highway
49 to Mossy Creek
ACTION: Proposal Due Date Change
ADDENDUM DATE: June 30, 2026
ORIGINAL BID DATE: July 3, 2026 at 2:00 PM
REVISED BID DATE: July 9, 2026 at 2:00 PM
The following addenda items are for the above referenced plans, specifications, and/or contract documents:
GENERAL CLARIFICATIONS:
PROPOSAL DUE DATE CHANGE: By this addendum the Proposal Due Date has been moved to Thursday, July 9, 2026 at 2:00 PM
VOULUME II – FORM TP-1 – This form has been revised to request State Utility Contractor License Number, not State Contractor License Number. The revised Volume II has been included as part of this addendum.
All bidders shall acknowledge receipt of all addenda issued in writing as part of their submission.
ATTENTION
PROPOSERS ARE ADVISED THAT IT IS THEIR RESPONSIBILITY TO
VERIFY THAT ANY AND ALL ADDENDA HAVE BEEN RECEIVED
PRIOR TO SUBMISSION OF THE PROPOSAL.
VOLUME II
TECHNICAL PROPOSAL FORMS
FORT VALLEY UTILITY COMMISSION
EFFLUENT PIPE FROM HIGHWAY 49 WRF TO MOSSY CREEK
DESIGN-BUILD PROCUREMENT
FORM TP-1
TECHNICAL PROPOSAL COVER SHEET
Project Name:
___Effluent Pipe from Highway 49 WRF to Mossy Creek_________________________________
Proposer Name:
Address:
Contact Person:
Phone:
Email:
State Utility Contractor License Number:
Georgia Engineering Firm License Number:
The undersigned certifies that the information contained within this Technical Proposal is true and correct.
Authorized Representative:
Title:
Signature:
Date:
FORM TP-2
DESIGN-BUILD TEAM ORGANIZATION
Prime Design-Builder:
Lead Engineering Firm:
Major Subconsultants:
Firm Discipline Contact
Major Construction Subcontractors:
Firm Scope Contact
Attach Organizational Chart.
Maximum 2 Pages.
FORM TP-3
EXECUTIVE SUMMARY
Provide a concise summary of:
• Team qualifications
• Understanding of project goals
• Schedule commitment
• Unique advantages of your team
• Risk mitigation strategy
Maximum Length:
3 Pages
FORM TP-4
PROJECT UNDERSTANDING
Describe your understanding of:
• Existing Conditions
• Project Objectives
• Critical Success Factors
• Key Risks
• Construction Challenges
• Schedule Challenges
• Regulatory Requirements
• Railroad Crossing Requirements
• Environmental Protection Requirements
10 Pages
FORM TP-5
RELEVANT PROJECT EXPERIENCE
Complete one form for each project.
Maximum Five Projects.
Project Name:
Owner:
Owner Contact:
Contact Phone:
Contract Value:
Completion Date:
Delivery Method:
Project Description:
Specific Relevance to This Project:
Was the Project Completed on Schedule?
YES / NO
Was the Project Completed Within Budget?
YES / NO
FORM TP-6
DESIGN-BUILD EXPERIENCE MATRIX
Project Value Pipeline Size Length Delivery Method
Maximum Five Projects.
FORM TP-7
KEY PERSONNEL FORM
Complete One Form Per Individual.
Name:
Title:
Employer:
Years Experience:
Role on Project:
Relevant Experience Summary:
Attach Resume.
Maximum Resume Length:
2 Pages
Required Personnel:
• Project Executive
• Project Manager
• Design Manager
• Construction Manager
• Superintendent
• Quality Manager
• Safety Manager
FORM TP-8
PROJECT APPROACH
Describe:
• Design Approach
• Utility Coordination
• Material Procurement
• Construction Methodology
• Railroad Coordination
• Testing Procedures
• Startup Procedures
• Restoration Procedures
10 Pages
FORM TP-9
PRELIMINARY CPM SCHEDULE
Provide a CPM Schedule including:
• Notice to Proceed
• Final Design
• Material Procurement
• Mobilization
• Pipeline Construction
• Testing
• Startup
• Substantial Completion
• Final Billing
Schedule shall demonstrate:
Substantial Completion by September 30, 2026.
Final Billing by October 31, 2026.
Attach Schedule.
5 Pages
FORM TP-10
RESOURCE LOADING PLAN
Provide anticipated staffing.
Position Name Percent Commitment Project Manager Design Manager Superintendent Foreman Crew Members
Provide equipment list.
Equipment Quantity Excavator Loader Dump Truck
Equipment Quantity Trench Box Other
FORM TP-11
RISK MANAGEMENT PLAN
Identify and discuss:
• Schedule Risks
• Material Procurement Risks
• Utility Conflicts
• Weather Risks
• Environmental Risks
• Railroad Coordination Risks
• Safety Risks
For each risk provide:
• Likelihood
• Impact
• Mitigation Strategy
FORM TP-12
QUALITY MANAGEMENT PLAN
Describe:
• Design QA/QC
• Construction QA/QC
• Inspection Procedures
• Testing Procedures
• Documentation Procedures
FORM TP-13
SAFETY PROGRAM
Provide:
• EMR:
2023 OSHA Recordables:
2024 OSHA Recordables:
2025 OSHA Recordables:
Describe:
• Safety Training
• Daily Safety Meetings
• Trench Safety Procedures
• Traffic Safety Procedures
• Emergency Response Procedures
FORM TP-14
FINANCIAL CAPACITY
Provide:
• Bonding Letter
• Insurance Certificate
• Financial Statement Summary
• Available Working Capital
• Current Bond Capacity
Attach Supporting Documentation.
FORM TP-15
PROJECT REFERENCES
Provide three references.
Reference No. 1
Owner:
Contact:
Phone:
Email:
Project:
Value:
Reference No. 2
[Repeat]
Reference No. 3
[Repeat]
FORM TP-16
SCHEDULE COMMITMENT CERTIFICATION
The undersigned certifies that the Design-Build Team can meet the following milestones:
Final Design Completion:
Within 30 Days of NTP
Substantial Completion:
September 30, 2026
Final Billing:
October 31, 2026
Authorized Representative:
Signature:
Date:
FORM TP-17
ARPA EXPERIENCE CERTIFICATION
List up to five federally funded projects.
Project Funding Source Value Completion Date
Describe experience with:
• ARPA
• SRF
• USDA
• CDBG
• Federal Grant Compliance
3 Pages
FORM TP-18- TECHNICAL PROPOSAL CHECKLIST
☐ Cover Sheet
☐ Team Organization
☐ Executive Summary
☐ Project Understanding
☐ Relevant Experience
☐ Experience Matrix
☐ Key Personnel
☐ Project Approach
☐ CPM Schedule
☐ Resource Loading Plan
☐ Risk Management Plan
☐ Quality Management Plan
☐ Safety Program
☐ Financial Capacity
☐ References
☐ Schedule Commitment
☐ ARPA Experience Certification
Proposals failing to include all required forms may be considered non-responsive.
| FVUC Effluent Pipe Addendum #1 |
| Addendum 1 Technical Proposal Forms - Vol. II |
| VOLUME II |
| TECHNICAL PROPOSAL FORMS |
| FORT VALLEY UTILITY COMMISSION |
| EFFLUENT PIPE FROM HIGHWAY 49 WRF TO MOSSY CREEK |
| DESIGN-BUILD PROCUREMENT |
| FORM TP-1 |
| TECHNICAL PROPOSAL COVER SHEET |
| FORM TP-2 |
| DESIGN-BUILD TEAM ORGANIZATION |
| FORM TP-3 |
| EXECUTIVE SUMMARY |
| FORM TP-4 |
| PROJECT UNDERSTANDING |
| Existing Conditions |
| Project Objectives |
| Critical Success Factors |
| Key Risks |
| Construction Challenges |
| Schedule Challenges |
| Regulatory Requirements |
| Railroad Crossing Requirements |
| Environmental Protection Requirements |
| FORM TP-5 |
| RELEVANT PROJECT EXPERIENCE |
| FORM TP-6 |
| DESIGN-BUILD EXPERIENCE MATRIX |
| FORM TP-7 |
| KEY PERSONNEL FORM |
| FORM TP-8 |
| PROJECT APPROACH |
| Design Approach |
| Utility Coordination |
| Material Procurement |
| Construction Methodology |
| Railroad Coordination |
| Testing Procedures |
| Startup Procedures |
| Restoration Procedures |
| FORM TP-9 |
| PRELIMINARY CPM SCHEDULE |
| Notice to Proceed |
| Final Design |
| Material Procurement |
| Mobilization |
| Pipeline Construction |
| Testing |
| Startup |
| Substantial Completion |
| Final Billing |
| FORM TP-10 |
| RESOURCE LOADING PLAN |
| FORM TP-11 |
| RISK MANAGEMENT PLAN |
| Schedule Risks |
| Material Procurement Risks |
| Utility Conflicts |
| Weather Risks |
| Environmental Risks |
| Railroad Coordination Risks |
| Safety Risks |
| FORM TP-12 |
| QUALITY MANAGEMENT PLAN |
| Design QA/QC |
| Construction QA/QC |
| Inspection Procedures |
| Testing Procedures |
| Documentation Procedures |
| FORM TP-13 |
| SAFETY PROGRAM |
| FORM TP-14 |
| FINANCIAL CAPACITY |
| Bonding Letter |
| Insurance Certificate |
| Financial Statement Summary |
| Available Working Capital |
| Current Bond Capacity |
| FORM TP-15 |
| PROJECT REFERENCES |
| FORM TP-16 |
| SCHEDULE COMMITMENT CERTIFICATION |
| FORM TP-17 |
| ARPA EXPERIENCE CERTIFICATION |
| FORM TP-18- TECHNICAL PROPOSAL CHECKLIST |
File details come from the government source that posted it. Updated .