VOL 3_Price Proposal Forms.pdf

PDF 249 KB Posted

Attached to
FORT VALLEY WASTEWATER TREATMENT PLANT EFFLUENT PIPE CONSTRUCTION
Solicitation number
PE-33552-NONST-2026-000000020
Issued by
Paulding County, Georgia

About this file

This is a Price Proposal Forms document for the Fort Valley Utility Commission's design-build procurement for an effluent pipe installation project from Highway 49 Water Reclamation Facility to Mossy Creek in Georgia. The project involves the design and construction of approximately 4,000 linear feet of 20-inch fusible PVC effluent pipe installed approximately 6 feet below grade, including approximately 185 linear feet of jack and bore work under a Norfolk Southern railroad line within a 30-inch steel casing pipe, along with associated excavation pits, manholes, and erosion control measures. Proposals were due July 3, 2026, at 2:00 PM EST, with award anticipated within 60 days of selection. The Price Proposal must be submitted in a separately sealed envelope and remain valid for 120 calendar days following submission.

The Price Proposal shall include all costs necessary for project completion and must be accompanied by thirteen required forms: Cover Sheet, Total Proposed Price, Design Fee Breakdown, Direct Construction Cost Breakdown, General Conditions Breakdown, Overhead and Profit, Contingency, Guaranteed Maximum Price Certification, Unit Price Schedule, Material Escalation Certification, Subcontractor Pricing, Self-Performed Work identification, and ARPA Cost Certification and Price Proposal Affidavit. The unit price schedule covers items including pipeline installation, rock excavation, unsuitable soil removal, imported fill, and restoration work. The project is funded through federal ARPA funding and requires certification that all costs are allowable, reasonable, necessary, and supported by pricing assumptions, with no prohibited costs included. Failure to submit all required forms may result in the proposal being deemed non-responsive.

View the file

Other files

File Type Posted
FVUC Effluent Pipe Addendum _1 Package.pdf PDF
FVUC Addenum1 (1).pdf PDF
Request for Proposals Advertisement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME III (Revised)

PRICE PROPOSAL FORMS

FORT VALLEY UTILITY COMMISSION

EFFLUENT PIPE FROM HIGHWAY 49 WRF TO MOSSY CREEK

DESIGN-BUILD PROCUREMENT

INSTRUCTIONS TO PROPOSERS

The Price Proposal shall be submitted in a separately sealed envelope clearly marked:

SEALED PRICE PROPOSAL – DO NOT OPEN

Price information shall not be included anywhere within the Technical Proposal.

Failure to comply may result in disqualification.

The Price Proposal shall remain valid for a period of 120 calendar days following proposal submission.

The Price Proposal shall be signed by an authorized representative of the proposing Design-Build Team.

In submitting this bid, Bidder represents that the Bidder has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged):

Date Addendum Number

07/09/2026 1

FORM PP-1- PRICE PROPOSAL COVER SHEET

Project: Effluent Pipe from Highway 49 WRF to Mossy Creek

Proposer:

Address:

Authorized Representative:

Phone:

Email:

The undersigned agrees to furnish all labor, materials, equipment, supervision, testing, startup, commissioning, and closeout services necessary to complete the Project in accordance with the Procurement Documents.

Authorized Signature:

Date:

FORM PP-2

TOTAL PROPOSED PRICE

Total Design-Build Contract Price: $

Amount Written: $

The Total Proposed Price shall include all costs associated with completion of the Project.

FORM PP-3- DESIGN FEE BREAKDOWN

Provide all engineering and design-related costs.

Item Amount

Project Management

Final Design

Construction

Documents

Design ǪA/ǪC

Construction Support

Startup Support

Record Drawings

Other

TOTAL DESIGN FEE

FORM PP-4

DIRECT CONSTRUCTION COST BREAKDOWN

Provide estimated direct construction costs.

Mobilization

Erosion Control

Traffic Control

Pipeline Materials

Appurtenances

Excavation

Backfill

Railroad Compliance

Testing

Restoration

Startup

TOTAL DIRECT COST

FORM PP-5

GENERAL CONDITIONS BREAKDOWN

Provide anticipated General Conditions costs.

Superintendent

Field Office

Temporary Facilities

Safety Program

Vehicles

Communications

Site Security

Survey Layout

Documentation

TOTAL GENERAL CONDITIONS

FORM PP-6

OVERHEAD AND PROFIT

Corporate Overhead Percentage: %

Corporate Overhead Amount: $

Profit Percentage: %

Profit Amount: $

FORM PP-7

CONTINGENCY

Provide contingency assumptions.

Contingency Amount: $

Contingency Percentage: %

Describe basis for contingency:

FORM PP-8

GUARANTEED MAXIMUM PRICE CERTIFICATION

The Proposer certifies that the Total Proposed Price constitutes the Guaranteed Maximum Price for completion of the Project except for Owner-directed changes in scope.

Signature:

FORM PP-9- UNIT PRICE SCHEDULE

Unit prices shall remain valid throughout the Project.

Item Unit Unit Price

20” Pipeline Installation LF

12” Pipeline Installation LF

Rock Excavation CY

Unsuitable Soil Removal CY

Imported Fill CY

Additional Restoration SY

Asphalt Replacement SY

Concrete Replacement SY

Additional Erosion Control LF

Additional Clearing Acre

FORM PP-10- MATERIAL ESCALATION CERTIFICATION

The Proposer certifies that material pricing included within the Price Proposal is valid for:

Days

Material escalation assumptions:

FORM PP-11- SUBCONTRACTOR PRICING

Identify major subcontractors.

Firm Scope Amount

FORM PP-12

SELF-PERFORMED WORK

Identify work to be self-performed.

Scope Estimated Value

Percentage of Work Self-Performed: %

FORM PP-13

ARPA COST CERTIFICATION

The undersigned certifies:

• Costs are allowable under federal funding requirements.

• Costs are reasonable and necessary.

• Costs are supported by pricing assumptions.

• No prohibited costs have been included.

FORM PP-14

PRICE PROPOSAL AFFIDAVIT

The undersigned certifies:

• The proposal has been made without collusion.

• The proposal has been independently developed.

• Pricing is accurate and complete.

• The proposer has reviewed all procurement documents.

Notary:

Commission Expiration:

FORM PP-15- PRICE PROPOSAL CHECKLIST

☐ Cover Sheet

☐ Total Proposed Price

☐ Design Fee Breakdown

☐ Direct Construction Cost Breakdown

☐ General Conditions Breakdown

☐ Overhead C Profit Form

☐ Contingency Form

☐ GMP Certification

☐ Unit Price Schedule

☐ Material Escalation Certification

☐ Subcontractor Pricing

☐ Self-Performed Work

☐ ARPA Cost Certification

☐ Price Proposal Affidavit

Failure to include required forms may result in the Price Proposal being deemed non-responsive.