Request for Proposals Advertisement.pdf
PDF 202 KB Posted
- Solicitation number
- PE-33552-NONST-2026-000000020
- Issued by
- Paulding County, Georgia
About this file
This Request for Proposals Advertisement is issued by the Fort Valley Utility Commission in Georgia for the design and construction of an effluent pipe system serving a new wastewater treatment plant. The project scope includes approximately 4,000 linear feet of 20-inch fusible PVC effluent pipe installed approximately 6 feet below grade using open cut and jack & bore construction methods, along with required manholes. Approximately 185 linear feet of pipe will be jack & bored under a Norfolk Southern railroad line, encased within a 30-inch steel casing pipe and bored approximately 6 feet below normal grade and 24 feet below the rail base. The project requires excavation of a 40-foot launching pit and 15-foot receiving pit for the jack & bore operation, plus erosion control and all ancillary items for complete installation. Interested firms must request proposal packages via email from Tara Giles at tgiles@fvutil.com to be added to the official List of Proposers. Proposals must be received by July 3, 2026 at 2:00 PM EST at Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030, either by mail or hand delivery. The proposal envelope must be sealed and marked as specified. Award is anticipated within sixty days of selection.
The Fort Valley Utility Commission will evaluate proposals using both quantitative cost factors and qualitative non-cost factors weighted according to the Proposal Requirements document. The procurement will adhere to ARPA Federal Funding guidelines and all applicable Federal, State, and Local Laws. The Commission reserves the right to accept or reject any or all proposals, waive formalities and technicalities, and make an award in its best interest. Proposers must be registered on the List of Proposers prior to the July 3 deadline to have their submissions considered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FVUC Effluent Pipe Addendum _1 Package.pdf | ||
| VOL 3_Price Proposal Forms.pdf | ||
| FVUC Addenum1 (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
for
FORT VALLEY WASTEWATER TREATMENT PLANT EFFLUENT PIPE
CONSTRUCTION
Owner: Fort Valley Utility Commission
Due Date: July 9, 2026
The Fort Valley Utility Commission is seeking a highly qualified company to design and build approximately 4,000 LF of 20” fusible PVC effluent pipe discharging from a new wastewater treatment plant using open cut and jack & bore methods and manholes. The effluent pipe will be installed approximately 6' below grade. Approximately 185 LF of the new pipe will be jack & bored under a railroad owned by Norfolk Southern. The bored pipe will be encased within a 30" steel casing pipe and will be bored approximately 6' below normal grade and 24' below the base of the rail. A 40' launching pit and a 15' receiving pit will be dug to perform the jack & bore. The project will also include erosion control and all other ancillary items for a complete effluent pipe installation.
Proposal packages may be requested via email and should be directed to Tara Giles at tgiles@fvutil.com. Upon request of a proposal package, the submitting firm will be added to the
“List of Proposers”. Proposals will not be accepted from entities not listed on the “List of
Proposers” prior to the due date. The complete proposal package includes the Request for
Proposals, Proposal Requirements and Proposal Information Sheet. Submitted proposals shall follow the guidelines outlined in the proposal package.
Proposals will be received at Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030 until July 3 @ 2:00 PM EST. No proposals will be accepted after this time.
Proposals should be mailed to: Fort Valley Utility Commission, 500 Anthoine Street, Fort Valley, GA 31030 OR Hand Delivered (Prior to due date/time) to: Fort Valley Utility Commission, 500
Anthoine Street, Fort Valley, GA 31030. Proposal Envelope should be sealed and marked: RFP for Fort Valley Wastewater Treatment Plant Effluent Pipe Construction.
Factors to be considered in making this award, if awarded, include consideration of both quantitative (cost) and qualitative (non-cost) factors, weighted per the Proposal Requirements document. If awarded, the City anticipates placement of a meter order with the successful proposer within sixty (60) days.
The Fort Valley Utility Commission reserves the right to accept or reject any or all proposals, to waive formalities and technicalities, and to make an award in the best interest of the Fort
Valley Utility Commission. Proposers must comply with all Federal, State and Local Laws.
Procurement will adhere to ARPA Federal Funding guidelines.
File details come from the government source that posted it. Updated .